Learn More
Log In
Sign Up
ARSD 20:10:39 – Stray Electrical Current and Voltage Remediation Rules | Midpage
Collections
Administrative Rules of South Dakota
Title 20
20:10
Chapter 20:10:39
ARSD 20:10:39
Stray Electrical Current and Voltage Remediation Rules
20:10:39:01
Definitions.
20:10:39:02
Purpose of rules - Conformance to electrical codes.
20:10:39:03
Measurement and testing by utility.
20:10:39:04
Notice to utility.
20:10:39:05
Cooperation between the dairy and utility.
20:10:39:06
Service provider.
20:10:39:07
Qualified testing professional.
20:10:39:08
Qualified testing analyst.
20:10:39:09
Additional qualified testing professional or analyst.
20:10:39:10
General requirements for stray voltage measuring and recording.
20:10:39:11
Calibration of measuring equipment.
20:10:39:12
Calibration certificates.
20:10:39:13
Field check of measuring equipment.
20:10:39:14
Requirements for monitoring systems and recording devices.
20:10:39:15
Requirements for load boxes.
20:10:39:16
Stray current or voltage test.
20:10:39:17
Testing sequence.
20:10:39:18
Preventive action level not exceeded.
20:10:39:19
Preventive action level exceeded.
20:10:39:20
Report prepared by qualified analyst.
20:10:39:21
Suspended or limited testing.
20:10:39:22
Use of remote reference electrodes.
20:10:39:23
Inspection, repair, and measurement requirments.
20:10:39:24
Use of ammeters.
20:10:39:25
Pre-test documentation.
20:10:39:26
Suspension of testing due to presence of a safety hazard.
20:10:39:27
The cow contact test.
20:10:39:28
Conducting the cow contact test.
20:10:39:29
Use of a voltmeter to conduct the cow contact test.
20:10:39:30
Use of a milliammeter to conduct the cow contact test.
20:10:39:31
Metal plate requirements.
20:10:39:32
Recording the cow contact test data.
20:10:39:33
Source resistance calculation.
20:10:39:34
The 48 hour test.
20:10:39:35
Data collection for the 48 hour test.
20:10:39:36
Measurement requirements for the 48 hour test.
20:10:39:37
Recording the 48 hour test data.
20:10:39:38
Reduced recording period for the 48 hour test.
20:10:39:39
The primary profile test.
20:10:39:40
Data collection for the primary profile test.
20:10:39:41
Recording the primary profile test data.
20:10:39:42
The secondary neutral voltage drop test.
20:10:39:43
Conducting the secondary neutral voltage drop test.
20:10:39:44
Data collection for the secondary neutral voltage drop test.
20:10:39:45
Measurements used for the secondary neutral voltage drop test.
20:10:39:46
Recording the secondary neutral voltage drop test data.
20:10:39:47
The load box test.
20:10:39:48
Timing of the load box test.
20:10:39:49
Conducting the load box test.
20:10:39:50
Data collection for the load box test.
20:10:39:51
Calculating the K factor for the load box test.
20:10:39:52
Recording the load box test data.
20:10:39:53
The signature test.
20:10:39:54
Data collection for the signature test.
20:10:39:55
Recording the signature test data.
20:10:39:56
Analysis of the data collected during the tests.
20:10:39:57
Determination of any contributions to stray current or voltage for single phase dairies.
20:10:39:58
Determination of any contributions to stray current or voltage for three-phase dairies.
20:10:39:59
Written report required - Copy to the dairy producer.
20:10:39:60
Remediation.