THE STATE EX REL. NEW WEN, INC., D.B.A. WENDY‘S v. MARCHBANKS, DIR., ET AL.
No. 2017-0813
Supreme Court of Ohio
January 15, 2020
2020-Ohio-63
NOTICE
This slip opinion is subject to formal revision before it is published in an advance sheet of the Ohio Official Reports. Readers are requested to promptly notify the Reporter of Decisions, Supreme Court of Ohio, 65 South Front Street, Columbus, Ohio 43215, of any typographical or other formal errors in the opinion, in order that corrections may be made before the opinion is published.
SLIP OPINION NO. 2020-OHIO-63
[Until this opinion appears in the Ohio Official Reports advance sheets, it may be cited as State ex rel. New Wen, Inc. v. Marchbanks, Slip Opinion No. 2020-Ohio-63.]
Mandamus—Writ of mandamus sought to compel state department of transportation to commence appropriation proceedings for alleged taking of property when state closed intersection where county road and limited-access highway formerly met—State‘s closure of intersection that was shown as “point of access” on original project plans when limited-access highway was created deprived business near intersection of right of access—Writ granted.
(Submitted May 7, 2019—Decided January 15, 2020.)
IN MANDAMUS.
{¶ 1} Relator, New Wen, Inc., d.b.a. Wendy‘s, seeks a writ of mandamus to compel the Ohio Department of Transportation and its director, Jack Marchbanks1 (collectively, “ODOT“), to commence appropriation proceedings for an alleged taking of its real property. We previously granted judgment on the pleadings and dismissed the claims brought by the other relators—Speedway, L.L.C., and Bob Evans Restaurants, L.L.C., and BER Real Estate Investments I, L.L.C (collectively, “Bob Evans“)—in this action. State ex rel. Speedway, L.L.C. v. Wray, 152 Ohio St.3d 1418, 2018-Ohio-923, 93 N.E.3d 1000. For the reasons that follow, we now grant New Wen‘s request for a writ of mandamus.
I. Background
A. Summary of the issue presented
{¶ 2} State Route 16 (“S.R. 16“) generally travels east-west through Licking County, in large part as a four-lane, limited-access, divided highway. Until late 2016, Cherry Valley Road, a.k.a. County Road 128 (“C.R. 128“), a north-south road, intersected S.R. 16 at a four-way, signalized intersection that allowed traffic to enter or exit either road in all directions. ODOT permanently closed the intersection shortly after Thanksgiving in 2016.
{¶ 3} BER Real Estate Investments I, L.L.C., owns the parcel on the southeast corner of the former intersection and leases the property to Bob Evans Restaurants, L.L.C., which operates a Bob Evans restaurant on the site. Speedway, L.L.C., owns the parcel on the southwest corner, on which it operates a Speedway convenience store and fuel center. Other business entities own properties near the former intersection.
{¶ 4} New Wen owns the parcel on the northwest corner of the former intersection of S.R. 16 and C.R. 128, on which it operates a Wendy‘s restaurant. The Wendy‘s is accessible to cars via an access point on C.R. 128. There is no access point permitting entry to the Wendy‘s parking lot directly from S.R. 16. Due to this configuration, from 1992, when the Wendy‘s restaurant opened, to November 2016, when the intersection closed, drivers could access the Wendy‘s from S.R. 16 by turning north on C.R. 128.
{¶ 5} As a result of ODOT‘s closure of the intersection, C.R. 128 no longer runs straight across S.R. 16. As drivers on C.R. 128 approach S.R. 16 from either the north or the south, they encounter a dead-end immediately before S.R. 16. On the north side, C.R. 128 dead-ends after the access point to the Wendy‘s parking lot; ODOT removed the short stretch of C.R. 128 that ran between that access point and S.R. 16, planted grass, erected a fence, and placed a guardrail just south of the Wendy‘s access point. Drivers on S.R. 16 can likewise no longer turn onto C.R. 128; S.R. 16 simply passes through the point where the intersection used to be. As a replacement for this closure, ODOT opened a new, limited-access interchange approximately 0.4 miles east of C.R. 128. Drivers on S.R. 16 may now reach the portion of C.R. 128 north of S.R. 16 by exiting at that new interchange, proceeding north on a new road called Thornwood Crossing, and taking a local road that parallels S.R. 16.
{¶ 6} ODOT‘s work did not directly affect the entrance to the Wendy‘s parking lot from C.R. 128. But as a practical matter, the changes require drivers to travel a longer distance to access the Wendy‘s from S.R. 16. Prior to the changes, a driver traveling east on S.R. 16 could reach the Wendy‘s by simply turning left onto C.R. 128 and then turning left again into the Wendy‘s parking lot—a distance of 0.22 miles from the point where the driver could first see the Wendy‘s site. After the changes, a driver has to exit S.R. 16 at the new interchange, travel to C.R. 128 using local roads, and then approach the Wendy‘s from the north—a distance of 1.6
{¶ 7} The legal question this case presents is whether ODOT‘s closure of the access point at the junction of S.R. 16 and C.R. 128 constitutes a compensable taking that requires ODOT to commence appropriation proceedings.
B. The evidence in the record
{¶ 8} In 1960, ODOT‘s predecessor, the Ohio Department of Highways, recorded a centerline plat in the office of the Licking County Recorder showing the proposed route for a limited-access east-west highway that would run through portions of Licking County. That highway—S.R. 16—would bisect C.R. 128.
{¶ 9} The northwest corner parcel bounded by S.R. 16 and C.R. 128 was part of a larger property owned by Alice Virginia Jones Olmsted, a.k.a. Alice Virginia Jones LaRue. In April 1961, the state paid Olmsted $23,299 for a permanent highway easement across the southern portion of her property, for the construction of S.R. 16 (the “S.R. 16 Easement“). The state and Olmsted agreed that the payment was compensation for the land taken and for all resulting damages. The S.R. 16 Easement conveyance included an express term by which Olmsted
specifically waive[d] and release[d] any and all right or rights of direct access, or claims thereof, to the present highway improvement to be constructed, or to the ultimate highway improvement to be constructed in the future, as called for by the plans herein referred to, and the execution of this conveyance shall act automatically as a waiver to the State of Ohio in the elimination of any direct access to said highway either for present or future construction.
{¶ 11} New Wen (through a predecessor entity) purchased a portion of Olmsted‘s property located immediately to the north of the S.R. 16 Easement, on which it opened the Wendy‘s restaurant. Although New Wen‘s property does not include any part of the land covered by the S.R. 16 Easement, it does include part of the land covered by the C.R. 128 Easement. Specifically, the eastern border of New Wen‘s property lies at the centerline of C.R. 128, so the portion of the C.R. 128 Easement to the west of the centerline is on New Wen‘s property.
C. Procedural history
{¶ 12} In June 2017, New Wen, Speedway, and Bob Evans filed a five-count complaint for a writ of mandamus to compel ODOT to initiate appropriation proceedings. ODOT filed a motion for judgment on the pleadings.
{¶ 13} On March 14, 2018, we granted the motion in part and denied it in part. 152 Ohio St.3d 1418, 2018-Ohio-923, 93 N.E.3d 1000. After dismissing all claims brought by the other relators, we granted an alternative writ of mandamus only as to New Wen‘s claim for a physical taking. The parties submitted briefs and evidence, the Ohio Council of Retail Merchants filed amicus briefs in support of New Wen, and we granted New Wen‘s request for oral argument.
II. Legal analysis
{¶ 14} The Takings Clauses in the Ohio and United States Constitutions “prevent government from ‘forcing some people alone to bear public burdens which, in all fairness and justice, should be borne by the public as a whole.‘” State ex rel. R.T.G., Inc. v. State, 98 Ohio St.3d 1, 2002-Ohio-6716, 780 N.E.2d 998, ¶ 33, quoting Armstrong v. United States, 364 U.S. 40, 49, 80 S.Ct. 1563, 4 L.Ed.2d 1554 (1960). So when private property is taken for a public use, the owner must be paid compensation, “and such compensation shall be assessed by a jury, without deduction for benefits to any property of the owner.”
{¶ 15} When a property owner alleges the taking of private property, mandamus is the correct action to force the state to institute appropriation proceedings. State ex rel. Wasserman v. Fremont, 140 Ohio St.3d 471, 2014-Ohio-2962, 20 N.E.2d 664, ¶ 22, citing State ex rel. Shemo v. Mayfield Hts., 95 Ohio St.3d 59, 63, 765 N.E.2d 345 (2002). To be entitled to a writ of mandamus, a party must establish, by clear and convincing evidence, (1) a clear legal right to the requested relief, (2) a clear legal duty on the part of the respondent to provide it, and (3) the lack of an adequate remedy in the ordinary course of the law. State ex rel. Mars Urban Solutions, L.L.C. v. Cuyahoga Cty. Fiscal Officer, 155 Ohio St.3d 316, 2018-Ohio-4668, 121 N.E.3d 311, ¶ 6. As in any mandamus action, a party seeking to compel appropriation proceedings must satisfy these three requirements. Wasserman at ¶ 22-23.
{¶ 16} To establish a taking, New Wen must demonstrate “a substantial or unreasonable interference with a property right.” State ex rel. OTR v. Columbus, 76 Ohio St.3d 203, 206, 667 N.E.2d 8 (1996). The interference “may involve the actual physical taking of real property, or it may include the deprivation of an intangible interest in the premises.” Id.
{¶ 18} Without question, ODOT has eliminated New Wen‘s property right of access to S.R. 16 and the taking physically occurred on New Wen‘s property. A landowner who conveys an easement continues to own the underlying property and retains rights in the easement area. Phifer v. Cox, 21 Ohio St. 248, 255 (1871) (when the public had an easement for a county road, “the establishment of the road did not extinguish [the owner‘s] title in the land over which it passed“). New Wen is able to assert a physical-taking claim because the eastern edge of its property extends to the centerline of C.R. 128 and is covered by the C.R. 128 Easement. The removal of the portion of C.R. 128 sitting between the access point to the Wendy‘s parking lot and S.R. 16 therefore occurred partly on New Wen‘s property.
{¶ 19} The question is whether the closure constitutes a compensable taking of a property right. ODOT contends that New Wen is not entitled to additional compensation because its predecessor-in-title waived her right of direct access to S.R. 16 at the time the easement for S.R. 16 was created. But the claim that Olmsted categorically released her rights is not accurate. The easement document instead provides:
[Olmsted] does hereby specifically waive and release any and all right or rights of direct access, or claims thereof, to the present
highway improvement to be constructed, or to the ultimate highway improvement to be constructed in the future, as called for by the plans herein referred to, and the execution of this conveyance shall act automatically as a waiver to the State of Ohio in the elimination of any direct access to said highway either for present or future construction.
(Emphasis added.) The waiver of direct access was conditional: it was based on—and expressly incorporated—the S.R. 16 project plans. And those plans identified a “Point of Access” at the juncture of the C.R. 128 Easement and the S.R. 16 Easement. This was done, according to the affidavit of an ODOT administrator, “[i]n order to permit the right of the traveling public within the right of way of County Road 128 aka Cherry Valley Road southbound to lawfully access ODOT‘s new limited access right of way.”
{¶ 20} The compensation paid in 1961 to Olmsted could not have included damages for the loss of all access to S.R. 16, because that access was not lost at the time and the project plans expressly guaranteed it. Nor would Olmsted have been entitled to compensation for the hypothetical possibility of a future closure, because damages awarded in an eminent-domain action “must be actual and not merely speculative or contingent,” Masheter v. Blaisdell, 30 Ohio St.2d 8, 12, 282 N.E.2d 42 (1972). If, however, after an initial taking, the state imposes new burdens on the property in the future that were not contemplated in the original plans, the property owner may be entitled to additional compensation. Id. The finder of fact may award damages that are “reasonably foreseeable” and that “might reasonably be expected to occur in the intended use of the property.” Id. at 11. In the absence of evidence of reasonably foreseeable damages, the compensable rights of the abutting property owner are established by “the present intended use of the land
{¶ 21} That is precisely the situation presented here. The intersection closure requires a second round of compensation because the express preservation of a point of access in both the easement agreement and project plans contradicts any presumption of foreseeability. A holding to the contrary would place landowners in an untenable position: a lost property right that is speculative (and therefore noncompensable) at the time of an initial taking suddenly becomes, at the time of the second taking, retroactively foreseeable (and therefore, again, noncompensable).
{¶ 22} ODOT contends that it does not owe a second round of compensation because the closure of the point of access occurred entirely within the physical limits of the preexisting easement for S.R. 16 and because the purpose of the closure—to improve the flow of traffic along S.R. 16—was consistent with the original purposes of that easement. When a public entity purchases a highway easement, compensation is “presumed to have been paid for all purposes consistent with the right to travel and the improvement of the road,” and if a subsequent use does not exceed those purposes, “the abutting landowner is presumed to have received compensation therefor when his land was appropriated or dedicated.” Sears v. Hopley, 103 Ohio St. 46, 48, 132 N.E. 25 (1921). But a review of our prior decisions shows that the holding in Sears does not apply to these facts.
{¶ 23} The leading case for purposes here is Ziegler v. Ohio Water Serv. Co., 18 Ohio St.2d 101, 247 N.E.2d 728 (1969). Ziegler involved the installation of an underground water pipeline in a preexisting highway easement. This court held that the landowner was entitled to no additional compensation because the water pipeline did not impose any new substantial burden on the landowner that was not already present by virtue of the highway easement. Id. at 105-106.
{¶ 25} The “right to exclude others” is “one of the most essential sticks in the bundle of rights that are commonly characterized as property.” Kaiser Aetna v. United States, 444 U.S. 164, 176, 100 S.Ct. 383, 62 L.Ed.2d 332 (1979); see also Dispatch Printing Co. at ¶ 51, quoting Kades, Property Rights and Economic Development, 45 Wm. & Mary L.Rev. 815, 818 (2004) (noting that the bundle of sticks constitutes ” ‘various combinations of the rights to exclude, to use, and to alienate’ “). The landowner in Ziegler lost her right-to-exclude stick when the original highway easement arose; the installation of the water pipeline under the same stretch of land did not take any of her remaining “sticks.” The same is true in other cases. See Centel Cable Television Co. of Ohio, Inc. v. Cook, 58 Ohio St.3d 8, 567 N.E.2d 1010 (1991), paragraphs one and two of the syllabus (coaxial-cable-television wires strung on utility poles in an existing easement); Friedman Transfer & Constr. Co. v. Youngstown, 176 Ohio St. 209, 198 N.E.2d 661 (1964), syllabus (water pipes installed on a bridge subject to an existing highway easement).
{¶ 26} This case is different. ODOT did not merely run a different form of traffic across an existing roadway. It helped itself to a second stick from New
{¶ 27} Finally, the dissent invokes
{¶ 28} At the time Olmsted was compensated, the fourth paragraph of
{¶ 29} So the question is not merely whether the state paid compensation to Olmsted to extinguish her right of direct access—it plainly did—but whether one aspect of the compensation she received was the reservation of a separate property right of indirect access via C.R. 128. The dissent assumes that all her rights were extinguished and that she had no further legal interest in accessing S.R. 16. But that assumption does not account for the fact that any calculation of her loss at the time would have contemplated the ongoing existence of indirect access to S.R. 16, as designated in the project plans and incorporated by reference into the easement document. In plain terms, simply recognizing that S.R. 16 is a limited-access highway does not further the analysis or answer the question before the court one way or the other.
{¶ 30} New Wen has shown, by clear and convincing evidence, that ODOT‘s closure of the intersection deprived New Wen of access to S.R. 16, a right of access that the original plans and the easement agreement expressly preserved, and that it has not received compensation for the taking. The right of property ownership is a fundamental right. State ex rel. Doner v. Zody, 130 Ohio St.3d 446, 2011-Ohio-6117, 958 N.E.2d 1235, ¶ 52. And no right of property ownership is more essential than the requirement, which both the Ohio and United States Constitutions impose, that the state shall not take private property for public use except upon payment of just compensation.
Writ granted.
KENNEDY, J., concurs, with an opinion joined by DEWINE, J.
O‘CONNOR, C.J., dissents, with an opinion joined by DONNELLY and STEWART, JJ.
KENNEDY, J., concurring.
{¶ 31} I join the majority opinion and agree that relator, New Wen, Inc., is entitled to a writ of mandamus but write separately to address the dissenting opinion‘s contention that Alice Virginia Jones Olmsted fully waived her right of access to State Route 16 (“S.R. 16“). When the “Easement for Highway Purposes” for S.R. 16 (the “S.R. 16 Easement“) was executed by Olmsted in 1961, the plain and unambiguous language of
{¶ 32} The version of
{¶ 33} Relying on
{¶ 34} In Rothwell, this court interpreted
{¶ 36} An owner of real property holds title “subject to a perpetual optional right of his government to acquire that property for public use,” but the government‘s taking of the property for public use will be at the cost of full compensation. Rothwell, 163 Ohio St. 517, 127 N.E.2d 524, at paragraph seven of the syllabus. Moreover,
[w]herever an easement of access to a highway by an abutting property owner is extinguished, then, to the extent of the inevitable resulting elimination of potential interference with travel on the highway there will necessarily be an increase of the right of use of the highway by the public; and the taking of such an easement of access will therefore be a taking for public use within the meaning of those words as used in Section 19 of Article I of the Ohio Constitution.
(Emphasis sic.) Id. at paragraph six of the syllabus.
{¶ 37} Because the state could not have compensated Olmsted for the loss of all access to S.R. 16 in 1961 in that the S.R. 16 Easement agreement and the
DEWINE, J., concurs in the foregoing opinion.
O‘CONNOR, C.J., dissenting.
{¶ 38} When the predecessor of the Ohio Department of Transportation (“ODOT“) filed the centerline plat for State Route 16 (“S.R. 16“) in 1960, S.R. 16 was designated as a “limited-access highway.” That designation carried with it certain implications for abutting property owners like Alice Virginia Jones Olmsted, who owned the property at issue in this case at that time. Specifically, pursuant to state law, abutting property owners such as Olmsted could have no right of direct access to the limited-access highway by reason of the fact that their property abutted the highway. See the fourth paragraph of the version of
{¶ 39} The majority does not acknowledge the unconditional nature of Olmsted‘s waiver. Instead, it holds that New Wen may base its claim on the loss of its right of access to S.R. 16. That is remarkable enough on its own. But the
I. The Majority Incorrectly Holds that New Wen Retained a Right of Access to S.R. 16
{¶ 40} The majority states initially that the property right at issue here is the right of a property owner to have access to a road abutting the owner‘s property. See State ex rel. Merritt v. Linzell, 163 Ohio St. 97, 126 N.E.2d 53 (1955), paragraph one of the syllabus. But the notion that Olmsted (even after she had granted the S.R. 16 Easement) retained a right of access to S.R. 16 that is capable of forming the basis of New Wen‘s claim for a taking is completely wrong.
{¶ 41} When Olmsted granted the S.R. 16 Easement in 1961, S.R. 16 had been designated a limited-access highway, and at that time, the fourth paragraph of
A “limited access highway” * * * is a highway especially designed for through traffic and over which abutting property owners have no easement or right of access by reason of the fact that their property abuts upon such highway, and access to which may be allowed only at highway intersections designated by the director.
{¶ 42} Olmsted at that time waived her right of direct access to S.R. 16 in the agreement she signed for the S.R. 16 Easement, which provides:
[Olmsted] does hereby specifically waive and release any and all right or rights of direct access, or claims thereof, to the present highway improvement to be constructed, or to the ultimate highway improvement to be constructed in the future, as called for by the plans herein referred to, and the execution of this conveyance shall act automatically as a waiver to the State of Ohio in the elimination of any direct access to said highway either for present or future construction.
Consequently, when ODOT‘s predecessor compensated Olmsted in exchange for the S.R. 16 Easement, part of that compensation was for Olmsted‘s specific “waive[r] and release [of] any and all right or rights of direct access, or claims thereof, to [S.R. 16].”
{¶ 43} Recognizing this, the majority acknowledges that Olmsted did waive her right of direct access. But it also claims that she was granted a separate right of access at the time she did so. The majority takes the position that because the project plans referred to in the S.R. 16 Easement agreement included a point of access at the juncture of County Road 128 (“C.R. 128“) and S.R. 16, Olmsted‘s waiver of her right to direct access to S.R. 16 “was conditional.” Majority opinion at ¶ 19. According to the majority, “the project plans expressly guaranteed,” id. at ¶ 20, that Olmsted would be able to access S.R. 16 indirectly, from C.R. 128, and that guarantee equates to a “separate” legal property right that can form the basis of a claim for a taking. Id. at ¶ 29.
{¶ 45} Second, the evidence here also shows that the intersection was not included for the purpose of guaranteeing Olmsted in particular a route by which she could quickly access S.R. 16 from her property. Rather, according to the affidavit of an ODOT administrator, the intersection was included in the plans “[i]n order to permit the right of the traveling public within the right of way of County Road 128 * * * southbound to lawfully access ODOT‘s new limited access right of way.” (Emphasis added.)
{¶ 46} The compensation Olmsted received in 1961 therefore included compensation for Olmsted‘s waiver of her property right of direct access to S.R. 16, even though the physical intersection remained, and Olmsted did not retain a separate property right to access S.R. 16 indirectly via C.R. 128. And New Wen could not have acquired from Olmsted any greater property right than what she had to convey.
{¶ 47} The implications of the majority‘s holding are significant. The majority opinion will surely be read as providing that owners of land abutting a limited-access highway may retain a right of access to the highway through an
II. The Majority Incorrectly Holds that ODOT‘s Work Was Not Foreseeable
{¶ 48} The majority also believes that New Wen is entitled to compensation because ODOT‘s closure of the intersection was not foreseeable. It quotes Masheter v. Blaisdell, 30 Ohio St.2d 8, 11, 282 N.E.2d 42 (1972), for the proposition that damages may be awarded in an appropriation proceeding only for uses of land that are ” ‘reasonably foreseeable’ ” and that ” ‘might reasonably be expected to occur in the intended use of the property.’ ” Majority opinion at ¶ 20. It then relies on the notion that damages should be based on ” ‘the present intended use of the land taken * * * for highway purposes, as revealed by the plans and specifications for the improvement.’ ” Id., quoting Blaisdell at paragraph two of the syllabus. Based on these concerns, it claims that New Wen is entitled to compensation, notwithstanding the compensation that had been provided to Olmsted in 1961, because “the express preservation of a point of access in both the [S.R. 16 Easement] agreement and project plans contradicts any presumption” that ODOT‘s closure of the intersection was foreseeable when Olmsted received compensation back in 1961. Id. at ¶ 21.
{¶ 49} I disagree. In my view, it is always foreseeable that an access point to a limited-access right of way such as S.R. 16 (which was repeatedly and explicitly declared to be a “limited access” highway in the project plans) may be subject to certain future upgrades—for example, by replacing the access point with a new interchange nearby as in the circumstances present here.
{¶ 51} Overall, it is clear that ODOT has not deviated from the original use of the easements here and that the project plans for this project do not constitute a binding commitment by the state to keep the intersection open forever. Indeed, because the plans repeatedly stated that S.R. 16 would be a limited-access highway, which as noted above is expressly designed for through traffic, the potential for the highway to be upgraded to facilitate the flow of through traffic was foreseeable in 1961. I would therefore hold that New Wen‘s argument that it is entitled to compensation because ODOT‘s work was not foreseeable is without merit.2
{¶ 52} Unfortunately, as with its conclusion that New Wen retains a right of access to S.R. 16, the majority‘s conclusion that ODOT‘s work was not foreseeable will have important consequences. The fine details of any plans and specifications referred to in an easement agreement—many of which are, like the plans at issue here, well over 50 years old—now take on a much greater legal
III. Conclusion
{¶ 53} For these reasons, I would hold that New Wen is not entitled to compensation. I therefore respectfully dissent.
DONNELLY and STEWART, JJ., concur in the foregoing opinion.
Vorys, Sater, Seymour & Pease, L.L.P., Joseph R. Miller, Thomas H. Fusonie, and Daniel E. Shuey, for relator.
Dave Yost, Attorney General, Benjamin M. Flowers, State Solicitor, Diane R. Brey, Deputy Solicitor, and L. Martin Cordero, Eric M. Hopkins, and William J. Cole, Assistant Attorneys General, for respondents.
Vorys, Sater, Seymour & Pease, L.L.P., John M. Kuhl, and Elizabeth S. Alexander, urging granting of the writ for amicus curiae, Ohio Council of Retail Merchants.