MACH MINING, LLC, Petitioner, v. SECRETARY OF LABOR, MINE SAFETY AND HEALTH ADMINISTRATION, et al., Respondents.
No. 12-3598.
United States Court of Appeals, Seventh Circuit.
Decided Aug. 26, 2013.
728 F.3d 643
Argued April 15, 2013.
Edward Waldman (submitted), Attorney, Department of Labor, Arlington, VA, for Respondent Secretary of Labor, Mine safety and Health Administration.
John T. Sullivan, Attorney, Office of the General Counsel, Washington, DC, for Respondent Federal Mine Safety and Health Review Commission.
Before RIPPLE, ROVNER, and WILLIAMS, Circuit Judges.
RIPPLE, Circuit Judge.
Mach Mining, LLC (“Mach“) operates the Mach No. 1 Mine (the “Mine“), an underground coal mine, near Johnston City, Illinois. Mach mines the coal using the “longwall” method, which involves preparing “panels” of coal for mining by drilling a series of tunnels to provide for ventilation, travel routes and access to the working areas of the mine. Once a panel is ready for mining, the longwall machine moves along the panel “shearing” the coal from the wall (much like a meat slicer in a deli) and using a conveyor belt to transport the sheared coal out of the mine. The Mine consists of five panels, at least some of which are over three miles long.
As an underground coal mine operator, Mach is subject to a significant number of safety regulations, including the requirement that it adopt a ventilation plan “suitable to the conditions and the mining system of the coal mine and approved by the Secretary” of Labor.
MSHA continued to withhold approval of Mach‘s ventilation plan for Panel 3, and Mach sought administrative review. Although the mining statutes establish a formal procedure for obtaining administrative and judicial review of a citation for failure to observe a mandatory mine safety or health standard, there is no explicit statutory process for obtaining review of a district manager‘s refusal to approve a ventilation plan. Instead, in order to obtain review, mine operators follow a procedure outlined in the MSHA policy manual. Fol
At a hearing, an ALJ for the Commission determined that the Secretary had the burden of proving that the district manager was not arbitrary and capricious in refusing to approve Mach‘s ventilation plan. The ALJ thus refused to consider additional evidence tendered by Mach that had not been presented to the district manager during informal negotiations. Based on the record before her, the ALJ determined that the district manager‘s refusal to approve the ventilation plan was not arbitrary and capricious.
A divided panel of the Commission affirmed the ALJ‘s decision.3 As to the proper standard of review, three commissioners held that the ALJ was correct in considering only whether the district manager‘s decision was arbitrary and capricious. Sec‘y of Labor v. Mach Mining, LLC, 34 FMSHRC 1784, 1790 (2012). They relied on language in the Mine Act that suggests that the Secretary has discretion in deciding whether to approve a ventilation plan, id. at 1791, and noted that
Two dissenting commissioners believed that a more plenary review was required. They cited prior Commission decisions in which the ALJ independently had weighed evidence and required the Secretary to show by a preponderance of the evidence that the operator‘s proposed ventilation plan was unsuitable to the mine and that the Secretary‘s own plan was suitable. Id. at 1811 (citing Sec‘y of Labor v. Peabody Coal Co., 18 FMSHRC 686, 690-91 (1996); Sec‘y of Labor v. Peabody Coal Co., 15 FMSHRC 381, 388 (1993)). These commissioners argued that the Commission should not change the burden and standard for reviewing ventilation plan disputes without a reasoned explanation. They also suggested that emergency response plans have a different standard of review because the process for approving such plans is set forth by
On the merits, the majority of the Commissioners held that the district manager did not abuse his discretion in refusing to approve the various aspects of Mach‘s ventilation plan. Id. at 1809.6 Because the dissenting Commissioners believed that the ALJ applied the wrong standard, they did not address the merits other than to note that the ALJ may have reached a different conclusion had she applied the preponderance of the evidence standard. Id. at 1813-14.
Mach filed a timely petition for review to this court. It argues that it had a right to a de novo hearing on the merits before the ALJ and that the ALJ should not have applied the arbitrary and capricious standard. It also maintains that the ALJ erred by excluding or discounting certain evidence and that the ALJ‘s factual findings are not supported by substantial evidence.
We have jurisdiction under
I
DISCUSSION
A.
As this case comes to us, the major point of contention between the parties is whether the Commission, the authority charged with adjudicating citations issued by the
In Steadman v. Securities & Exchange Commission, 450 U.S. 91, 95, 101 (1981), the Supreme Court noted that, when faced with the task of ascertaining the applicable degree of proof, a court first must ascertain whether Congress has spoken on the issue. If Congress has spoken, that is, of course, the end of the matter. If Congress has not spoken, courts must fashion the applicable standard. In undertaking such a task, however, we must choose a standard compatible with the congressional policies articulated in the general legislative scheme and choose a standard that best reflects the values and choices that Congress has identified. See id. at 97-102, 101 (examining the language and history of section 7(c) of the Administrative Procedure Act (“APA“) to determine what standard of proof Congress intended to be applied). We now embark on that analytical journey.
1.
Mach submits that the question before us requires a straightforward application of the cardinal rule of statutory interpretation: Courts must adhere to the plain meaning of the statutory language. Noting that the Secretary‘s refusal comes before the Commission as the adjudication of a citation, albeit a citation for a “technical violation,” Mach submits that every proceeding to review a citation, including citations for “technical violations,” is an adjudicative proceeding that must be conducted in accordance with section 554 of the APA. See
Mach is correct in stating that our starting point in analyzing the question before us must be the plain wording of the statute enacted by Congress. However, we cannot apply this rule to selected words divorced from the context in which they appear. See FDA v. Brown & Williamson Tobacco Corp., 529 U.S. 120, 132-33 (2000) (“The meaning—or ambiguity—of certain words or phrases may only become evident when placed in context. It is a ‘fundamental canon of statutory construction that the words of a statute must be read in their context and with a view to their place in the overall statutory scheme.’ ” (citation omitted) (quoting Davis v. Michigan Dep‘t of Treasury, 489 U.S. 803, 809 (1989))); Zeigler Coal Co. v. Kleppe, 536 F.2d 398, 405 (D.C.Cir.1976) (examining the Federal Coal Mine Health and Safety Act of 1969 “[o]n the whole” to determine whether adopted and approved ventilation plans
Examination of the text and the structure reveals that the regulation of mining industry practices has been committed by Congress to a bifurcated structure. In the simplest of terms, the statutory scheme contemplates that the Secretary sets mandatory health and safety standards, either through the formal agency rulemaking process,
First, with respect to formal rulemaking, the Mine Act authorizes and directs the Secretary to “develop, promulgate, and revise as may be appropriate, improved mandatory health or safety standards for the protection of life and prevention of injuries in coal or other mines.” Id. § 811(a). The Secretary also is authorized to grant exceptions to mine operators who request a modified standard. Id. § 811(c). Before granting an exception, however, the Secretary must determine that the proposed modified standard would be just as safe as the mandatory standards, and must publish notice and provide opportunity for a public hearing on the matter. Id.8 It is well established that the exercise of such rulemaking authority is subject to deferential review. See, e.g., Int‘l Union, United Mine Workers of America v. Fed. Mine Safety & Health Admin., 920 F.2d 960, 964, 966-67 (D.C.Cir.1990) (holding that the Secretary was entitled to deference when determining whether to alter mandatory standards, but remanding because the Secretary failed to explain adequately his reasoning).
Finally, the Secretary has enforcement authority and can issue a citation when he “or his authorized representative believes that an operator of a coal or other mine subject to this chapter has violated this chapter, or any mandatory health or safety standard.” Id. § 814(a). The Secretary is further authorized to issue an order requiring the mine operator to withdraw persons from the mine if, in any ninety-day period, he finds two violations that were “caused by an unwarrantable failure” to comply with the mandatory standards and which “could significantly and substantially contribute” to a safety or health hazard. Id. § 814(d).
In contrast to the Secretary‘s duties, adjudication of citations was entrusted by Congress to the Commission. An operator may choose not to contest a citation, in which case the citation is deemed a final order of the Commission thirty days after receipt. Id. § 815(a). Alternatively, an operator may choose to contest a citation, in which case the operator additionally may request a hearing for temporary relief under § 815(b)(2) prior to full review on the merits. When looking at the merits,
the Commission shall afford an opportunity for a hearing (in accordance with section 554 of Title 5, but without regard to subsection (a)(3) of such section), and thereafter shall issue an order, based on findings of fact, affirming, modifying, or vacating the Secretary‘s citation, order, or proposed penalty, or directing other appropriate relief.
Id. § 815(d).
In bifurcating this regulatory system, Congress clearly intended to separate the Secretary‘s rulemaking and enforcement functions from the Commission‘s adjudicative function. The Senate report states that the purpose of vesting adjudicative authority in the Commission was to have a “completely independent adjudicatory authority.” S.Rep. No. 95-181 at 47, reprinted in 1977 U.S.C.C.A.N. at 3447. “The Committee believes that an independent Commission is essential to provide administrative adjudication which preserves due process and instills much more confidence in the program.” Id. In examining a statute with a similar structure, the Supreme Court noted that “[t]he purpose of this ‘split enforcement’ structure was to achieve a greater separation of functions than exists within the traditional ‘unitary’ agency, which under the Administrative Procedure Act (APA) generally must divide enforcement and adjudication between separate personnel.” Martin v. Occupational Safety & Health Rev. Comm‘n, 499 U.S. 144, 151 (1991) (examining the distinct roles of the Secretary of Labor and the Occupational Safety and Health Review Commission (“OSHRC“) under the Occupational Safety and Health Act).9
2.
This examination of the text and the structure of the statute reveals two important points for the task before us. First, the role of the Secretary in approving safety plans in areas not susceptible to general regulatory governance through the rulemaking process is distinctly different from the role he performs pursuant to his enforcement duties. After a process of dialogue and negotiation with the mine operator, the Secretary must make an independent judgment that the ventilation system for a particular mining site is safe for those who will work there.10 Although specific to a certain mine and susceptible to more frequent alteration as conditions in the mine change, the process is essentially one of setting standards, not, in many ways, substantially different from setting more lasting and general standards through the rulemaking process. As the Court of Appeals for the District of Columbia Circuit has noted, the plan approval process differs from formal rulemaking because the mine operator takes the initiative in the development of these mine-specific standards,11 nevertheless the statute clearly places on the Secretary the duty to reach an independent judgment as to the adequacy of the standards.12 The statute places on the Secretary‘s shoulders the obligation and prerogative of making a discretionary judgment as to whether the ventilation system developed by the operator will protect those who must expose their health, and indeed their lives, to risk by working at that specific site. In contrast to the Secretary‘s rulemaking re
Our examination of the language and the structure of the statute yields a second significant point. It reveals a significant gap in the overall statutory scheme: Resolution of an impasse between the mine operator and the Secretary with respect to the adequacy of a ventilation plan is not addressed specifically in the statutory language and is not easily discernible from the overall structure of the statutory scheme. Because this issue is central to our inquiry, we now undertake a historical analysis of the statutory language in the hope that it will shed some light on our understanding of how the statute contemplates the resolution of such an impasse.13
Modern efforts to deal legislatively with problems of health and safety in the mining industry find their anchor in the Federal Coal Mine Health and Safety Act of 1969, Pub.L. No. 91-173, 83 Stat. 742 (1969) (codified as amended at
The 1969 Act called for mine inspections, id. § 103, 83 Stat. at 749-50, and empowered the Secretary of the Interior to enforce the mandatory standards by issuing notices or fines, or by ordering a mine to cease operations, id. § 104, 83 Stat. at 750-52.14 Mine operators could seek review of any order or notice by sending a request to the Secretary of the Interior who was then required to investigate and hold a hearing, if requested, to enable the operator “to present information relating to the issuance and continuance of such order.” Id. § 105(a)(1), 83 Stat. at 753. The hearing would be “of record” and subject to section 554 of the APA, id.
As we have noted, the 1969 Act required mine operators to adopt mine-specific ventilation plans approved by the Secretary. Id. § 303(o), 83 Stat. at 772. Regulations promulgated immediately after the 1969 Act established general criteria for approving ventilation plans, see Mandatory Safety Standards, Underground Coal Mines, 35 Fed.Reg. 17,890, 17,904 (Nov. 20, 1970) (codified at 30 C.F.R. § 75.316–2 (1971)), but neither the 1969 Act nor the regulations outlined a method for a mine operator to obtain review of a district manager‘s refusal to approve a ventilation plan. The Committee Report attached to the House version of the bill suggested that a mine operator could appeal a citation to the Secretary or directly to the Federal Coal Mine Health and Safety Board of Review.15 If the operator appealed directly to this board, it was “not bound by any previous findings of fact and the burden of proof [was] on the Secretary.” H.R.Rep. No. 91-563 (1969), reprinted in 1969 U.S.C.C.A.N. 2503, 2512. If the operator sought review before the Secretary before appealing to the board, the Secretary‘s decision would be prima facie evidence against the operator, but “either side” was allowed to “produce additional evidence.” Id. This procedure did not become part of the final version of the 1969 Act. In sum, the first modern effort to address mine safety problems simply did not address resolving an impasse between a mine operator and the Secretary over the contents of a site-specific ventilation plan.
In 1976, the United States Court of Appeals for the District of Columbia Circuit suggested a process for obtaining review of disapproval of a mine ventilation plan. See Zeigler Coal Co., 536 F.2d at 406-07. In that case, the court was asked to consider whether provisions of an approved ventilation plan should be considered mandatory standards and thus subject to the 1969 Act‘s enforcement provisions. Id. at 401. Before answering the question in the affirmative, the court examined the 1969 Act‘s history and process for obtaining approval of a ventilation plan. The court noted that ventilation plans “appear to be developed by informal negotiations between the operator and the Secretary‘s representative” without the protections of the formal notice and comment process set forth in section 101 of the 1969 Act. Id. at 403. The mine operator argued that if the Secretary could enforce a ventilation plan as a mandatory standard, he would be able to circumvent the formal procedures for setting safety standards by simply refusing to approve an operator‘s ventilation plan unless the operator agreed to whatever standards the Secretary deemed appropriate. Id. at 406. The court rejected this argument; it pointed out that a mine operator could choose whether to adopt a plan
The statute makes clear that the ventilation plan is not formulated by the Secretary, but is “adopted by the operator.” While the plan must also be approved by the Secretary‘s representative, who may on that account have some significant leverage in determining its contents, it does not follow that he has anything close to unrestrained power to impose terms. For even where the agency representative is adamant in his insistence that certain conditions be included, the operator retains the option to refuse to adopt the plan in the form required....
The agency‘s recourse to such a refusal to adopt a particular plan appears to be invocation of the civil and criminal penalties of § 109, which require an opportunity for public hearing and, ultimately, appeal to the courts. At such a hearing, the operator may offer argument as to why certain terms sought to be included are not proper subjects for coverage in the plan. Because we believe that the statute offers sound basis for narrowly circumscribing the subject matter of ventilation plans, we conclude that this opportunity for review is a substantial safeguard against significant circumvention of the § 101 procedures.
Id. (footnotes omitted). The court noted that the Secretary‘s power was further limited because the ventilation plan must contain only specific, as opposed to general, standards applicable to a particular mine and must not address issues other than ventilation. Id. at 407. The Court of Appeals for the District of Columbia Circuit‘s statement in Zeigler is significant because, although it does not address the standard of review, it specifically addresses, for the first time, the question of resolution of an impasse over the terms of a ventilation plan.
The following year, Congress enacted the Federal Mine Safety and Health Amendments Act of 1977, Pub.L. No. 95-164, 91 Stat. 1290 (1977) (codified as amended at
Despite its broad attention to the structure of the mechanism for regulating the mining industry, this legislative effort yielded no concrete guidance on the resolution of impasses over ventilation plans. The 1977 Act simply retained the section of the 1969 Act that required ventilation plans to be suitable to the conditions of the mine. Notably, however, the Senate report approved of Zeigler‘s discussion about the adoption of a mine plan, emphasized the importance of the Secretary‘s judgment in approving plans and noted that the operator is “entitled to full and prompt judicial review.” Id. at 25, reprinted in 1977 U.S.C.C.A.N. at 3425. The report stated:
The Committee notes that in addition to mandatory standards applicable to all operators, operators are also subject to the requirement set out in the various mine by mine compliance plans required by statute or regulation. The requirements of these plans are enforceable as if they were mandatory standards. Such individually tailored plans, with a nucleus of commonly accepted practices, are the best method of regulating such complex and potentially multifaceted problems as ventilation, roof control and the like. The Committee notes with approval that individual mine plan adoption and implementation procedures have been sustained by the federal Court of Appeals for the District of Columbia circuit ([Zeigler] Coal Company v. Secretary of the Interior, 536 F.2d 398, (1976).) Thus, the Committee fully expects the individual mine plan technique to continue to be utilized by the Secretary in appropriate circumstances. The Committee cautions that while the operator proposes a plan and is entitled, as are the miners and representatives of miners to further consultation with the Secretary over revisions, the Secretary must independently exercise his judgment with respect to the content of such plans in connection with his final approval of the plan. The operator and the representative of miners are entitled to full and prompt judicial review of plan contents, under Section 102(f).16
Id. (emphasis added).
The House conference report, see H.R.Rep. No. 95-655 (1977) (Conf. Rep.), reprinted in 1977 U.S.C.C.A.N. 3485, 3501, discussed the process for review of citations by the Commission, but did not discuss a procedure for reviewing the Secretary‘s refusal to approve a ventilation or other mine plan. It simply noted that it would adopt the Senate‘s version of the bill relating to the review of citations, which gave the aggrieved party the opportunity to be heard before the Commission and authorized the Commission to issue a decision based on its own factual findings. Id.
In sum, other than the Senate report‘s reference to the method mentioned in Zeigler, neither the 1977 Act nor its accompanying legislative history discusses procedures for obtaining approval of individual mine plans or obtaining review of the Secretary‘s refusal to approve a mine plan. Nor do they specify the standard of
In 2006, Congress gave us another oblique indication that it approved of the citation system as a means of reviewing the Secretary‘s disapproval of plans drawn up by mine operators. In that year, Congress amended the Mine Act to require mine operators to adopt emergency response plans approved by the Secretary. See Mine Improvement and New Emergency Response Act of 2006, Pub.L. No. 109-236, 120 Stat. 493 (2006) (codified at
As is currently the case with roof and ventilation plans, the dispute resolution process begins with a review and decision by an Administrative Law Judge from the Mine Safety and Health Review Commission. Further appeal from the ALJ‘s decision may be taken in the same manner as with any other citation. This process is, of course, to be distinguished from the issuance of a citation for noncompliance with the provisions of an already approved plan. In those instances the normal procedures regarding citation level and appeal process would apply.
Id. (emphasis added).
The report emphatically distinguishes the “technical violation” from the use of citations to enforce already existing rules. Notably, neither the text nor the legislative history of this statute addresses the standard of review to be employed by the Commission in adjudicating denials of approval for emergency response plans.18
In examining MSHA‘s internal policies, we note that volume V of MSHA‘s “Program Policy Manual” discusses the process for approving mine plans and contesting MSHA‘s refusal to approve a plan. According to the manual, if MSHA is unable to approve a plan, “the operator should be notified in writing of what information is needed or why the changes cannot be approved. The process should be completed quickly....” Program Policy Manual, Vol. V—Coal Mines, MSHA, 4 (June 28, 2013), http://www.msha.gov/REGS/COMPLIAN/PPM/PDFVersion/PPM%20Vol%20V.pdf.19 The manual indicates that an operator may contest MSHA‘s decision by notifying MSHA and receiving a citation. “Where the operator disagrees with MSHA and indicates the desire to seek a citation to contest before the Federal Mine Safety and Health Review Commission, a citation should be issued.” Id. The manual suggests ways of obtaining the necessary citation and explains that review will be before an ALJ:
[In t]he case of a new mine plan with a provision that cannot be approved ... [t]he operator could indicate that mining operations will begin on a particular date, using the plan that contains the provision which is not approved. On the date indicated for starting operations, a citation would be issued for failure to adopt and follow an approved plan, as required by the applicable standard. Abatement would be achieved by the operator promptly adopting provisions that satisfy MSHA‘s previously documented concerns.
Id. at 5. In each of these cases, the operator would have the option of contesting the citation issued and presenting to an administrative law judge the reasons why the disputed plan provision should have been approved. “Likewise, [MSHA] would present [its] reasons for revoking or denying approval.” Id. The manual‘s description of the hearing before the ALJ does not indicate the standard of review to be applied.
This analysis of the historical development of the statutory provisions at issue establishes that the “technical violation” method of seeking review of an impasse in the development of a ventilation plan developed first through judicial suggestion and then through custom and agency practice. Congressional approval came obliquely at first through mention in legislative history and then more directly through somewhat parallel legislation governing emergency response plans. Nevertheless, the issue of the appropriate standard of review to apply to the conclusion of this process has not been addressed.
3.
Our examination of the overall text of the statute reveals that it is not at all clear that Congress ever focused explicitly on the appropriate standard of review for the Secretary‘s refusal to approve a mine ventilation plan. The statutory text, read as a whole, makes clear that the process of approving a ventilation plan proposed by the mine operator is a significantly different task than issuing a citation for the violation of an established standard. Put in its simplest terms, it involves the formulation of a standard, not the enforcement of a standard. It requires the gathering of information by the mine operator and its presentation to the district manager, the manager‘s examining and assessing that material and considering the views of the operator on the appropriateness of the plan. At bottom, it entails the exercise of the Secretary‘s independent judgment as to the appropriateness of the plan to ensure the health and safety of the miners. There is, in other words, a congressional mandate that the Secretary exercise independent judgment that the plan safeguards those whom it is designed to protect. The plan as finally implemented must reflect the Secretary‘s best judgment that the mine is indeed safe for miners. See
As part of their argument, Mach points us to
In our view, the use of a de novo standard to review such secretarial refusals runs into a substantial statutory barrier. Use of such a de novo standard of review in the ventilation plan situation would undermine—substantially—the specific statutory language of
In light of the statutory text and its history, we conclude that the majority of the members of the Commission correctly determined that the decision of the Secretary to withhold approval of the ventilation plan is reviewable under the abuse of discretion standard. To permit the Commission to substitute its view for that of the Secretary simply would displace entirely the expertise of the Secretary from the determination of the appropriate safety standards for mine ventilation, a situation clearly contrary to the intent of the statutory scheme mandated by Congress.21
Our conclusion is consistent with the Supreme Court‘s discussion of the roles of the Secretary and OSHRC in Martin v. OSHRC, 499 U.S. 144 (1991). In determining that the Secretary‘s interpretation, rather than OSHRC‘s, should receive deference, the Supreme Court noted that the Secretary, as the entity responsible for promulgating and enforcing the statute, has policymaking expertise and is in a better position than is the Commission to reconstruct the purpose of the regulations in question. Moreover, by virtue of the Secretary‘s statutory role as enforcer, the Secretary comes into contact with a much greater number of regulatory problems than does the Commission, which encounters only those regulatory episodes resulting in contested citations.... Because historical familiarity and policymaking expertise account in the first instance for the presumption that Congress delegates interpretive lawmaking power to the agency rather than to the reviewing court, we presume here that Congress intended to invest interpretive power in the administrative actor in the best position to develop these attributes.
For the same reason, we reject the Court of Appeals’ inference that Congress intended to endow the Commission with the normal complement of adjudicative powers possessed by traditional administrative agencies. Id. at 152-54 (citations omitted) (internal quotation marks omitted).
B.
Having determined that the Commission was correct in its conclusion that the Secretary‘s decision ought to be reviewed deferentially, we must determine whether the Commission‘s decision can be sustained on review before this court. Unlike the situation that has occupied us in
1.
Mach contends that the ALJ‘s incorrect application of an arbitrary and capricious standard of review led her to exclude or unfairly discount its evidence and the testimony of its experts, thus preventing Mach from fully presenting its case. Appellant‘s Br. 38. Our earlier discussion and conclusion forecloses this line of argument. We note that the ALJ did allow Mach‘s witnesses to testify, considered their testimony and provided a reasoned explanation both for discounting their testimony and for accepting the testimony of the Secretary‘s witnesses.22
2.
Examining the merits, although Mach contends that it was entitled to a de novo review before the ALJ, it does not argue that, if the arbitrary and capricious standard applies, there is insufficient evidence to sustain the decision of the district manager.23 It also does not maintain that the district manager failed to follow the general regulations with respect to mines or the various directives promulgated by the Secretary to ensure comprehensive review of a submitted plan. Nor does it contend that the district manager acted arbitrarily in refusing to review any information that Mach submitted to him.
Mach does submit, however, that it was unaware “of the full range of disagreements MSHA would have with its ventilation plan for panel 3.” Appellant‘s Br. 42. It alleges that MSHA never fully articulated its rationale for rejecting Mach‘s ventilation plan during informal negotiations, which prejudiced Mach at the hearing before the ALJ. At bottom, Mach claims that the district manager failed to negotiate in good faith, see Sec‘y of Labor v. C.W. Mining Co., 18 FMSHRC 1740, 1747 (1996) (explaining that good faith negotiations include “notice of a party‘s position and adequate discussion of disputed provisions“), contrary to the negotiation procedures required by the Commission, see Sec‘y of Labor v. Carbon Cnty. Coal Co., 7 FMSHRC 1367, 1371 (1985). However, the ALJ found that the negotiations between Mach and the district manager did satisfy the good faith requirement. Specifically, she noted “that the Secretary and Mach had extensive back and forth discussions over a period of eight months” and that those discussions “included telephone calls, emails, letters and meetings, at both the district and national level. During the
We thus affirm the Commission‘s decision on the evidentiary issue and on the merits.
Conclusion
For the above reasons, we must deny the petition for review.
PETITION DENIED
Notes
Upon petition by the operator or the representative of miners, the Secretary may modify the application of any mandatory safety standard to a coal or other mine if the Secretary determines that an alternative method of achieving the result of such standard exists which will at all times guarantee no less than the same measure of protection afforded the miners of such mine by such standard, or that the application of such standard to such mine will result in a diminution of safety to the miners in such mine. Upon receipt of such petition the Secretary shall publish notice thereof and give notice to the operator or the representative of miners in the affected mine, as appropriate, and shall cause such investigation to be made as he deems appropriate. Such investigation shall provide an opportunity for a public hearing at the request of such operator or representative or other interested party, to enable the operator or the representative of miners in such mine or other interested party to present information relating to the modification of such standard. Before granting any exception to a mandatory safety standard, the findings of the Secretary or his authorized representative shall be made public and shall be available to the representative of the miners at the affected mine. The Secretary shall issue a decision incorporating his findings of fact therein, and send a copy thereof to the operator or the representative of the miners, as appropriate. Any such hearing shall be of record and shall be subject to section 554 of Title 5.