Mo. Code Regs. Ann. tit. 10, § 25-8.124
PURPOSE: This rule reflects the requirements of the federal regulations in 40 CFR part 124, with modifications and additional requirements established by the Revised Statutes of Missouri. This rule establishes the requirements for public notice and public participation in the issuance, denial, modification, and revocation of hazardous waste management facility permits, appeal hearings, variance petitions, and closure and post-closure activities. This rule also specifies procedures for the issuance, modification, and revocation of resource recovery facility certifications and the issuance and revocation of transporter licenses.
(1) Except as provided otherwise in this rule, the substitution of terms set forth in 10 CSR 25-3.260(1)(A) apply in this rule, in addition to any other modifications established in paragraph (1)(A)2. of this rule. Where conflicting rules exist in 10 CSR 25, the more stringent rules control. (Comment: This section has been organized so that Missouri requirements analogous to a particular lettered subpart in 40 CFR part 124 are set forth in the corresponding lettered subsection of section (1) of this rule. For example, the general program requirements in 40 CFR part 124 subpart A, with Missouri modifications, are found in subsection (1)(A) of this rule.)
(A) This subsection sets forth requirements that correspond to those requirements in 40 CFR part 124 subpart A.
contains procedures for the review, issuance, class 3 or department-initiated modification, total modification, or revocation of all permits issued pursuant to sections 260.350 through 260.434, RSMo. This subsection also contains procedures for the denial of a permit, either in its entirety or as to the active life of a hazardous waste management facility or unit, under 40 CFR 270.29, as incorporated in 10 CSR 25-7.270. Interim status is not a permit and is covered by specific provisions in 10 CSR 25-7.265 and 10 CSR 25- 7.270. Class 1 or class 2 permit modifications, as defined in 40 CFR 270.42 as incorporated in 10 CSR 25-7.270, are not subject to the requirements of this subsection.
tions given in 40 CFR 270.2, as incorporated in 10 CSR 25-7.270, the definitions below apply to this rule:
prepared under paragraph (1)(A)6. of this rule indicating the department’s tentative decision to issue, deny, modify in part or in total, revoke, or reissue a “permit.” A notice of intent to revoke, as discussed in subparagraph (1)(A)5.D. of this rule, and a notice of intent to deny, as discussed in subparagraph (1)(A)6.B. of this rule, are types of draft permits. A denial of a request for modification, total modification, or revocation of a permit, as discussed in subparagraph (1)(A)5.B. of this rule, is not a type of “draft permit”;
tested case held under section 260.400, RSMo;
U.S. Environmental Protection Agency standard national forms for applying for a permit, including any additions, revisions, or modifications to the forms; or forms approved by the U.S. Environmental Protection Agency for use in Missouri, including any approved modifications or revisions. It also includes the information specified by the department under 40 CFR 270.14–270.29, as incorporated into 10 CSR 25-7.270;
ing on a tentative decision at which any member of the public is invited to give oral or written comments;
tion of a permit;
schedule of remedial measures in a permit, including an enforceable sequence of interim 10 CSR 25-8
requirements (for example, actions, operations, or milestone events) leading to compliance with sections 260.350 through 260.434, RSMo;
revocation and reissuance of a permit;
area where any “facility or activity” is physically located or conducted, including adjacent land used in connection with the facility or activity; and
from the Missouri Hazardous Waste Management Law as defined in section 260.405, RSMo.
3. Application for a permit.
shall complete, sign, and submit to the department a permit application for each permit required under 40 CFR 270.1, as incorporated in 10 CSR 25-7.270. Permit applications are not required for permits by rule per 40 CFR 270.60, as incorporated in 10 CSR 25-7.270. The department shall not begin the processing of a permit until the applicant has fully complied with the permit application requirements for that permit, as provided under 40 CFR 270.10 and 270.13, as incorporated in 10 CSR 25-7.270. Permit applications shall comply with the signature and certification requirements of 40 CFR 270.11, as incorporated in 10 CSR 25-7.270(2)(A)1., and 10 CSR 25-7.270.
completeness every permit application. Each permit application submitted by a new facility should be reviewed for completeness by the department within thirty (30) days of its receipt. Each permit application submitted by an existing facility should be reviewed for completeness by the department within sixty (60) days of its receipt. Upon completing the review, the department will notify the applicant in writing whether the permit application is complete. If the permit application is incomplete, the department will list the information necessary to make the permit application complete. When the permit application is for an existing facility, the department will specify, in the notice of deficiency, a date for submitting the necessary information. The department will notify the applicant that the permit application is complete upon receiving the required information. After the permit application is complete, the department may request additional information from an applicant, but only as necessary to clarify, modify, or supplement previously submitted material. Requests for such additional information will not render a permit application incomplete.
correct deficiencies in the permit application, the permit may be denied and enforcement actions may be taken under the applicable statutory provisions of sections 260.350 through 260.434, RSMo.
application is the date the department notifies the applicant that the permit application is complete, as provided in subparagraph (1)(A)3.B. of this rule.
department will, no later than the effective date of the permit application, prepare and mail to the applicant a project decision schedule. The schedule will specify target dates by which the department intends to—
period, including any public hearing; and
visit is necessary for any reason in conjunction with the processing of a permit application, the department will notify the applicant and a date will be scheduled.
requires more than one (1) type of environmental permit from the state, the applicant may request, or the department may offer, a unified permitting schedule that covers the timing and order to obtain such permits, as provided in section 640.017, RSMo, and 10 CSR 1-3.010.
revocation of permits.
in total, or revoked, either at the request of the permittee or of any interested person or upon the department’s initiative. However, permits may only be modified or revoked for the reasons specified in 40 CFR 270.41 or 40 CFR 270.43, as incorporated in 10 CSR 25- 7.270. All requests shall be in writing and shall contain facts and reasons supporting the request.
request is not justified, a brief written response giving a reason for the decision shall be sent to the person requesting the permit modification and to the permittee. Denial of a request for modification, in part or in total, or revocation of a permit is not subject to public notice, comment, or hearing, and is not appealable under section (2) of this rule.
C. Tentative decision to modify.
decides to modify a permit in part or in total, a draft permit incorporating the proposed changes will be prepared according to paragraph (1)(A)6. of this rule. The department may request additional information and, in the case of a partial permit modification, may require the submission of an updated permit application. In the case of a total permit modification, the department will require the submission of a new permit application.
modified under this paragraph, only the conditions being modified are reopened. All other conditions of the original permit remain in effect for the duration of the existing permit. When a permit is totally modified under this paragraph, the entire permit is reopened just as if the permit had expired and was being reissued. During any total modification, the permittee complies with all conditions of the existing permit until a new, final permit is issued.
modifications” as defined in 40 CFR 270.42, as incorporated in 10 CSR 25-7.270, are not subject to the requirements of this paragraph.
decides to revoke a permit, the department will issue a notice of intent to revoke. A notice of intent to revoke is a type of draft permit and follows the same procedures as any draft permit decision prepared under paragraph (1)(A)6. of this rule.
6. Draft permits.
mit application is complete, the department shall tentatively decide whether to prepare a draft permit, or deny the permit application.
decides to deny the permit application, a notice of intent to deny shall be issued. A notice of intent to deny is a type of draft permit and follows the same procedures as any draft permit decision prepared under this paragraph. If the department’s final decision under paragraph (1)(A)15. of this rule is that the tentative decision to deny the permit application was incorrect, the department shall withdraw the notice of intent to deny and prepare a draft permit under this paragraph.
decides to prepare a draft permit, the department will prepare a draft permit that contains the following information:
270.30 and 270.32, as incorporated in 10 CSR 25-7.270;
under 40 CFR 270.33, as incorporated in 10 CSR 25-7.270;
under 40 CFR 270.31, as incorporated in 10 CSR 25-7.270; and
age, and/or disposal and other permit conditions under 40 CFR 270.30, as incorporated in 10 CSR 25-7.270.
this paragraph will be accompanied by a fact sheet per paragraph (1)(A)8. of this rule, publicly noticed per paragraph (1)(A)10. of this rule, and made available for public comment per paragraph (1)(A)11. of this rule. The department will give notice of opportunity for a public hearing per paragraph (1)(A)12. of this rule, issue a final decision per paragraph (1)(A)15. of this rule, and respond to comments per paragraph (1)(A)17. of this rule. An appeal may be filed under section (2) of this rule.
available for public comment, the department shall deliver the draft permit to the applicant for review, as provided in section 640.016.2, RSMo. The applicant shall have ten (10) days to review the draft permit for nonsubstantive drafting errors. The department shall make the applicant’s changes to the draft permit within ten (10) days of receiving the applicant’s review and then submit the draft permit for public comment. The applicant may waive the opportunity to review the draft permit prior to public notice.
8. Fact sheet.
every draft permit. The fact sheet will briefly set forth the principal facts and the significant factual, legal, methodological, and policy questions considered in preparing the draft permit. The department will send this fact sheet to the applicant and to any person who requests a copy.
applicable:
of facility or activity which is the subject of the draft permit;
wastes, fluids, or pollutants which are proposed to be or are being treated, stored, disposed of, injected, emitted, or discharged;
for the draft permit conditions including references to applicable statutory or regulatory provisions.
variances or alternatives to applicable standards do or do not appear justified;
for reaching a final decision on the draft permit including:
dates of the public comment period under paragraph (1)(A)10. of this rule and the address where comments will be received;
hearing and the nature of that hearing; and
which the public may participate in the final decision; and
of a department contact for additional information.
public comment period.
A. Scope.
notice that the following actions have occurred:
permit application has been prepared under subparagraph (1)(A)6.B. of this rule;
pared under subparagraph (1)(A)6.C. of this rule;
under paragraph (1)(A)12. of this rule; or
permit has been prepared under subparagraph (1)(A)5.D. of this rule.
when a request for permit modification, in part or in total, or revocation is denied. A brief written response giving a reason for the decision will be sent to the requester and to the permittee.
more than one (1) permit or permit action.
B. Timing.
of a draft permit (including a notice of intent to deny a permit application and a notice of intent to revoke a permit) under subparagraph (1)(A)10.A. of this rule will allow at least forty-five (45) days for public comment.
ing will be given at least thirty (30) days before the hearing. Public notice of the hearing may be given at the same time as the public notice of the draft permit, and the two (2) notices may be combined.
ties described in part (1)(A)10.A.(I) of this rule will be given by the following methods:
the following persons (any person otherwise entitled to receive notice under this part may waive their rights to receive notice for any permit):
with jurisdiction over fish, shellfish, and wildlife resources, natural resource management plans, and state historic preservation officers, including any affected states (Indian tribes); and
maintained by the facility which is developed by—
to be on the list;
lists” from participants in past permit proceedings in that area;
opportunity to be put on the mailing list through periodic publication in the public press and in such publications as regional and state funded newsletters, environmental bulletins, or state law journals. The facility shall be responsible for maintaining and updating the mailing list. The department may require the facility to update the mailing list from time-to-time by requesting written indication of continued interest from those listed. The facility may remove from the list the name of any person who fails to respond to such a request;
ers of real property adjacent to the current or proposed facility, in accordance with section 260.395.8, RSMo;
sure disposal facility, all record owners of real property which overlie any known plume of contamination originating from the facility; and
ing disposal facility, all record owners of real property located within one (1) mile of the outer boundaries of the current or proposed facility, in accordance with section 260.395.8, RSMo;
also be sent to the highest elected official of the county and the highest elected official of the city, town, or village having jurisdiction over the area where the facility is currently or proposed to be located, in accordance with section 260.395.8, RSMo, and each state agency having any authority under state law with respect to the construction or operation of such facility; and
be sent to any other department program or federal agency which the department knows has issued or is required to issue a Resource Conservation and Recovery Act (RCRA), Hazardous and Solid Waste Amendments (HSWA), Underground Injection Control (UIC), Prevention of Significant Deterioration (PSD), (or other permit issued under the Clean Air Act), National Pollutant Discharge Elimination System (NPDES), 404, or sludge management permit for the same facility or activity (including the U.S. Environmental Protection Agency);
(II) Other publication. 10 CSR 25-8
daily or weekly major local newspaper of general circulation and broadcast over local radio stations.
includes active land disposal of hazardous waste, issue a news release to the media serving the area where the facility is currently or proposed to be located, in accordance with section 260.395.8, RSMo.
calculated to give actual notice of the activity to the persons potentially affected by it, including news releases or any other forum or medium to elicit public participation.
copy of the legal notice, fact sheet, and draft permit to a location accessible to the public, in the vicinity of the facility, where the documents can be viewed and copied.
this paragraph shall contain the following minimum information:
ment;
mittee or applicant and, if different, of the facility or activity regulated by the permit;
ness conducted at the facility or activity described in the permit application or the draft permit;
number of a department contact person from whom interested persons may obtain additional information;
ment procedures, the date, time, and place of any hearing that will be held, a statement of procedures for requesting a hearing (unless a hearing has already been scheduled), and any other procedures by which the public may participate in the final permit decision;
considered necessary or proper by the department;
mation listed in subpart (1)(A)10.C.(I)(e) of this rule was placed for public review; and (VIII) In addition to the information listed above, the public notice of a public hearing under paragraph (1)(A)12. of this rule shall contain the following information:
vious public notices relating to the draft permit;
hearing; and
nature and purpose of the hearing, including the applicable rules and procedures.
in subparagraph (1)(A)10.D. of this rule, the department shall mail a copy of the permit application (if any), draft permit, and fact sheet to all persons identified in subparts (1)(A)10.C.(I)(a), (b), and (f) of this rule.
public hearings. During the public comment period provided under paragraph (1)(A)10. of this rule, any interested person may submit written comments on the draft permit and may request a public hearing, if no hearing has already been scheduled. A request for a public hearing shall be in writing and state the nature of the issues to be raised in the hearing. All written comments and oral comments given at the public hearing, if one is held, are considered by the department in making the final permit decision and are answered as provided in paragraph (1)(A)17. of this rule.
12. Public hearings.
260.395.8, RSMo, the department will hold a public hearing whenever a written request for a hearing is received within forty-five (45) days of the public notice under part (1)(A)10.B.(I) of this rule. In accordance with section 260.395.8, RSMo, for any permit that includes active land disposal of hazardous waste, the department shall hold a public hearing after public notice, as specified in paragraph (1)(A)10. of this rule, before issuing, modifying in total, or renewing the permit; and before any Class 3 or department-initiated permit modification related to the hazardous waste land disposal unit(s), including those necessary due to the department’s five- (5-) year review.
hearing at its own discretion whenever there is significant public interest in a draft permit or when one (1) or more issues involved in the permit decision requires clarification.
ment will schedule a public hearing under this paragraph at a location convenient to the nearest population center to the current or proposed facility.
will be given as specified in paragraph (1)(A)10. of this rule.
comments or data concerning the draft permit. The department will accept oral comments during the public hearing. Reasonable limits may be set on the time allowed for oral comments. Any person who cannot present oral comments due to time limitations will be provided an opportunity to present written comments. The public comment period under paragraph (1)(A)10. of this rule will automatically be extended to the close of any public hearing if the public hearing is held later than forty-five (45) days after the start of the public comment period.
script of the public hearing shall be made available to the public.
vide information during the public comment period. All persons, including the applicant, who believes any condition of a draft permit is inappropriate or that the department’s tentative decision to deny a permit application, prepare a draft permit, or revoke a permit is inappropriate, shall raise all ascertainable issues and submit all relevant arguments supporting their position by the close of the public comment period under paragraph (1)(A)10. of this rule. Any supporting materials that are submitted shall be included in full and may not be incorporated by reference, unless the supporting materials are state or federal statutes and regulations, EPA documents of general applicability, or other generally available reference materials.
mit.
final permit decision means the issuance, denial, Class 3 or department-initiated modification, total modification, or revocation of a permit. After the close of the public comment period under paragraph (1)(A)10. of this rule, the department will issue a final permit decision (or a decision to deny a permit for the active life of a hazardous waste management facility or unit under 40 CFR 270.29, as incorporated in 10 CSR 25-7.270). The department will notify the applicant and each person who submitted written comments, gave oral comments at the public hearing, or requested notice of the final permit decision. This notice will include reference to the procedures for appealing a final permit decision under section (2) of this rule. The department will mail a copy of the final permit decision to the location where the draft permit was placed for public review under subpart (1)(A)10.C.(II) of this rule. The department will also send a news release announcing the final permit decision to the media serving the area where the facility is currently or proposed to be located.
modification decision (or a decision to deny a permit either in its entirety or as to the active life of a hazardous waste management facility or unit under 40 CFR 270.29, as incorporated in 10 CSR 25-7.270) will become effective on the date the decision is signed by the department. A final permit revocation decision will become effective thirty (30) days after the department signs the decision, unless no comments requested a change in the draft permit revocation decision, in which case the final permit revocation decision will become effective on the date the decision is signed by the department.
17. Response to comments.
permit decision is issued under paragraph (1)(A)15. of this rule, the department will issue a response to comments. This response shall—
of the draft permit have been changed in the final permit decision and the reasons for the change; and
all significant comments on the draft permit raised during the public comment period and public hearing, if one was held.
made available to the public.
20. Computation of time.
begin on the occurrence of an act or event begins on the day after the act or event.
before the occurrence of an act or event ends on the last working day before the act or event.
falls on a weekend or legal holiday, the time period is extended to the next working day.
person has the right or is required to act within a specific time period after he or she receives notice by mail, three (3) days is added to the time period to allow for mail delivery.
(B) This subsection sets forth requirements that correspond to the requirements in 40 CFR part 124 subpart B.
1. Applicable permit procedures.
apply to all new permit applications and permit applications for renewal of permits where a significant change in facility operations is proposed. For purposes of this paragraph, a “significant change” is any change that would qualify as a class 3 permit modification under 40 CFR 270.42, as incorporated in 10 CSR 25-7.270. The requirements of this paragraph do not apply to class 1 or class 2 permit modifications, as defined in 40 CFR 270.42, as incorporated in 10 CSR 25-7.270, or permit applications submitted for the sole purpose of conducting post-closure activities or post-closure activities and corrective action at a facility.
submitting a permit application to construct, substantially alter, or operate a hazardous waste disposal facility, the applicant shall submit to the department a letter of intent, in accordance with section 260.395.7, RSMo. The department will publish the letter within ten (10) days of receipt. The letter will be published as specified in section 493.050, RSMo. The letter will be published once a week for four (4) consecutive weeks in a newspaper of general circulation serving the county in which the facility is currently or proposed to be located.
cation for a facility, the applicant shall hold at least one (1) public meeting to solicit questions from the community and inform the community of proposed hazardous waste management activities. The applicant shall post a sign-in sheet or otherwise provide an opportunity for attendees to voluntarily provide their names and addresses.
mary of the meeting, the list of attendees and their addresses developed under subparagraph (1)(B)1.C. of this rule, and copies of any written comments or materials submitted at the meeting to the department as a part of the permit application, in accordance with 40 CFR 270.14(b), as incorporated in 10 CSR 25-7.270.
notice of the pre-application meeting at least thirty (30) days prior to the meeting. The applicant shall maintain, and provide to the department as part of the permit application, documentation of the notice.
lic notice in all of the following forms:
The applicant shall publish a notice as a display advertisement in a newspaper of general circulation serving the county or equivalent jurisdiction where the current or proposed facility is located. In addition, the applicant shall publish the notice in newspapers of general circulation serving adjacent counties or equivalent jurisdictions;
The applicant shall post a notice on a clearly marked sign at or near the facility. If the applicant places the sign on the facility property, the sign shall be large enough to be read from the nearest point where the public would pass by the site;
ment. The applicant shall broadcast a notice as a paid advertisement at least once on at least one (1) local radio station or television station. The applicant may employ another medium with the prior written approval of the department; and
ment, the applicant shall send a copy of the newspaper advertisement to the units of state and local government described in subpart (1)(A)10.C.(I)(d) of this rule.
graph shall include:
of the meeting;
purpose of the meeting;
facility and proposed operations, including the address or a map (e.g., a sketched or copied street map) of the current or proposed facility location;
people to contact the facility at least seventytwo (72) hours before the meeting if they need special access to participate in the meeting; and
phone number of a contact person for the applicant.
mit application stage.
this paragraph apply to all new permit applications for hazardous waste management units and permit applications for renewal of permits for such units under 40 CFR 270.51, as incorporated in 10 CSR 25-7.270. The requirements of this paragraph do not apply to permit modifications, as defined in 40 CFR 270.42, as incorporated in 10 CSR 25- 7.270, or permit applications submitted for the sole purpose of conducting post-closure activities or post-closure activities and corrective action at a facility.
submittal.
public notice as set forth in subpart (1)(A)10.C.(I)(c) of this rule, and notice to the appropriate units of state and local government as set forth in subpart (1)(A)10.C.(I)(d) of this rule, that a complete permit application has been submitted to the department and is available for review.
within a reasonable period of time after the department determines that the permit application is complete. The notice must include:
number of the applicant’s contact person;
number of the department contact person and a mailing address to which information and inquiries may be directed throughout the permitting process;
can write in order to be put on the facility mailing list;
the permit application and any supporting documents can be viewed and copied;
facility and proposed operations, including the address or a map (e.g., a sketched or copied street map) of the current or proposed facility location on the front page of the notice; and
application was submitted.
subparagraph (1)(B)2.B. of this rule, the department will place the permit application and any supporting documents in a location accessible to the public in the vicinity of the facility or at the department’s office as identified in the notice.
3. Information repository.
this paragraph apply to all applicants seeking hazardous waste management facility permits.
need, on a case-by-case basis, for a local information repository. When assessing the need for a local information repository, the department will consider a variety of factors, including the level of public interest, the type of facility, and the presence of an existing repository. If the department determines, at any time after submittal of a permit application, that there is a need for a local repository, then the department will notify the facility that it must establish and maintain a local information repository.
contain all documents, reports, data, and information deemed necessary by the department to fulfill the purposes for which the repository is established. The department will have the discretion to limit the contents of the repository.
be located and maintained at a location chosen by the facility. If the department finds the location unsuitable for the purposes and persons for which it was established, due to problems with the location, hours of availability, access, or other relevant considerations, the department will specify a more appropriate location.
requirements the applicant must meet for informing the public about the local information repository. At a minimum, the department will require the applicant to provide a written notice about the information repository to all individuals on the facility mailing list.
for maintaining and updating the repository with appropriate information throughout the time period specified by the department. The department may close the repository at its discretion, based on the factors in subparagraph (1)(B)3.B. of this rule.
(2) Appeal of Final Decision.
(D) Any party described in subsection (2)(G) of this rule may petition the Administrative Hearing Commission for an interlocutory order staying the effectiveness of a final permit decision, a closure plan approval, a post-closure plan approval, or any condition of a final permit decision or approval which is subject to an appeal, until the Missouri Hazardous Waste Management Commission enters its final order upon the appeal. At any time during the proceeding, the applicant may apply to the Administrative Hearing Commission for relief from a stay order previously issued.
or relief from a stay, the Administrative Hearing Commission will consider the likelihood that the petition will eventually succeed on the merits, the potential for harm to the applicant, business, industry, public health, or the environment if the requested stay or relief is or is not granted, and the potential magnitude of the harm.
for a stay or relief from a stay is not considered a contested case or a final order and is made by a majority of the sitting quorum of the Administrative Hearing Commission.
pending appeal to the Administrative Hearing Commission has the effect of continuing the effect and enforceability of any existing permit until the Missouri Hazardous Waste Management Commission issues a final order upon the appeal, unless the stay is lifted sooner by the Administrative Hearing Commission. During the appeal proceeding, the stay of any condition of a final permit decision pending appeal does not relieve the applicant of complying with all conditions of the final permit decision not stayed.
from a stay order shall be presented to the Administrative Hearing Commission on less than ten (10) days’ notice to all other parties to the proceeding.
(G) The participants in an appeal hearing shall be—
written petition of appeal; and
cation for intervention and is granted leave to intervene of right or permissive intervention. Any person desiring to intervene in an appeal shall file with the Administrative Hearing Commission, an application to intervene according to the procedures of Rule 52.12, Supreme Court Rules of Civil Procedure.
state the interests of the intervener, the grounds upon which intervention is sought, and a statement of the position which the intervener desires to take in the proceeding. The intervener shall serve a copy of the application to intervene on each of the parties to the proceeding as determined under part (1)(A)10.C.(II) of this rule.
Commission or duly appointed hearing officer will grant or deny the application to intervene pursuant to Rule 52.12, Supreme Court Rules of Civil Procedure. The Administrative Hearing Commission or hearing officer may condition any grant of intervention as the circumstances may warrant.
(3) Transporter License.
(A) Issuance or Denial of a Transporter License.
tion for a transporter license, the department will determine whether the application conforms to the requirements of sections 260.385 and 260.395, RSMo, and 10 CSR 25-6. The department will notify the applicant of its decision to issue, with or without conditions, or denying the license. If the license is denied, the department will specify the reasons for the denial. No license will be issued until the fees specified in section 260.395.1, RSMo, have been paid.
issuance, denial, or any condition of a license is the same as the procedure for appealing a final permit decision under section (2) of this rule.
(B) Revocation of a Transporter License.
for the reasons specified in sections 260.379.2, 260.395.3, 260.410.3, and 260.410.4, RSMo, or for failure to comply with sections 260.395.1(2) and 260.395.1(3), RSMo.
ings to revoke a transporter license. If the department proposes to revoke a transporter license, it will send a notice of intent to revoke by certified mail to the licensee, specifying the provisions of sections 260.350– 260.434, RSMo, 10 CSR 25-6, the conditions of the license or the provisions of an order issued to the licensee that the licensee has violated, the manner in which the licensee misrepresented or failed to fully disclose relevant facts, or the manner in which the activities of the licensee endanger human health or the environment or are creating a public nuisance.
revocation is the same as the procedure for appealing a permit revocation under section (2) of this rule. A timely written petition for appeal stays the effectiveness of a license revocation. If a timely written petition for appeal is not filed, the revocation is effective thirty (30) days after the department signs the revocation decision.
(4) Variances.
(C) Substantive Variance. If a variance petition is deemed substantive, the department will—
1. Upon receipt—
of real property located within one (1) mile of the outer boundaries of the facility, the highest elected official of the county, and the highest elected official of the city, town, or village having jurisdiction over the area where the facility is located; and
and publish a legal notice in a newspaper of general circulation serving the area where the facility is located;
2. Within sixty (60) days of receipt—
whether the variance should be granted, granted with conditions, or denied;
Missouri Hazardous Waste Management Commission;
mendation;
the recommendation in a newspaper of general circulation serving the area where the facility is located; and
mendation to all record owners of real property adjacent to the facility, the highest elected official of the county, and the highest elected official of the city, town, or village having jurisdiction over the area where the facility is located; and
Missouri Hazardous Waste Management Commission or a duly appointed hearing officer on the variance petition and the department’s recommendation, as provided in section 260.400, RSMo.
(F) Hearing Procedures. Any hearings under this section are a contested case pursuant to section 260.400 and Chapter 536, RSMo. The participants are the department, the petitioner, any aggrieved person who requests a formal hearing, and any person who files a timely application for intervention and is granted leave to intervene. Any person desiring to intervene shall file an application to intervene with the Missouri Hazardous Waste Management Commission secretary within thirty (30) days from the date the legal notice regarding the recommendation is published.
state the interests of the intervener, the 10 CSR 25-8
grounds upon which intervention is sought, and a statement of the position that the intervener desires to take in the proceeding. The intervener shall serve a copy of the application to intervene on each of the parties listed in subsection (5)(F) of this rule.
Management Commission or duly appointed hearing officer will grant or deny the application to intervene pursuant to Rule 52.12, Supreme Court Rules of Civil Procedure. The Missouri Hazardous Waste Management Commission or hearing officer may condition any grant of intervention as the circumstances may warrant.
AUTHORITY: sections 260.370, 260.400, 260.405, and 260.437, RSMo 2016.* Original rule filed June 1, 1998, effective Jan. 30, 1999. Amended: Filed Feb. 1, 2001, effective Oct. 30, 2001. Amended: Filed April 15, 2011, effective Dec. 30, 2011. Amended: Filed April 15, 2015, effective Dec. 30, 2015. Amended: Filed June 14, 2018, effective March 30, 2019.
*Original authority: 260.370, RSMo 1977, amended 1980, 1988, 1993, 1995, 2004, 2010; 260.400, RSMo 1977, amended 1980, 1993; 260.405, RSMo 1977, amended 1980; and 260.437, RSMo 1983, amended 1995.