Zutt v. StateZutt v. State
APPEARANCES OF COUNSEL
Daniels and Porco, LLP, Carmel (Robert C. Lusardi of counsel), for respondents.
OPINION OF THE COURT
Angiolillo, J.P.
More than a decade ago, homeowners William A. Zutt and Diane Zutt (hereinafter together the Zutts) commenced the first in a series of actions and proceedings to prevent the State of New York from draining stormwater over their property. The Zutts have prevailed in all previous litigation, collecting damages for trespass and obtaining injunctive relief. Nevertheless, in 2010, the State invoked its powers of eminent domain and sought to condemn a portion of the Zutts’ property for a drainage easement. The Zutts commenced this proceeding pursuant to
Factual Background and Previous Litigation
In April 2000 the Zutts purchased their home in an environmentally sensitive, historic area on New York State Route 9D in Garrison, a New York scenic byway. In September 2000 their property was damaged by stormwater discharged from a culvert under Route 9D; the water had been directed into the culvert by a drainage system of catch basins and pipes. After consulting an engineer, the Zutts repaired the damage and installed a gabion retaining wall on their property.
In June 2001 the Zutts’ property was again damaged by stormwater discharged from the culvert. The Zutts contacted the New York State Department of Transportation (hereinafter the DOT), which sent an engineer to assess the damage. In November 2001 the DOT informed the Zutts that the State would not undertake remedial or corrective measures.
Consequently, in January 2002, the Zutts filed a claim against the State in the Court of Claims to recover damages for trespass and nuisance. In defense, the State asserted that it had a prescriptive easement based upon its installation in 1984 of the drainage system of catch basins and underground pipes, and the existence of the culvert under Route 9D since, at the latest, 1928.
In a decision after trial dated July 27, 2006 (hereinafter Zutt I), the Court of Claims (19 Misc 3d 1131[A], 2006 NY Slip Op 52611[U] [2006, Scuccimarra, J.]) explained that the State failed to establish a prescriptive easement by clear and convincing evidence, and that stormwater drainage over the Zutts’ property constituted a continuing trespass. The Court of Claims noted that “the State [had] altered drainage conditions by the use of pipes and catch basins, thus increasing the velocity of any water collected, and increasing the erosion potential of any water discharged,” while failing to improve the culvert, abate the flow, maintain the channel emanating from the culvert, or control potential damage (2006 NY Slip Op 52611[U], *13). “[W]ithout maintenance efforts, the channel became deeper and wider, and
Meanwhile, after Zutt I, but prior to the entry of the final judgment, the Zutts wrote to the State, requesting that it take measures to ameliorate the continuing trespass in order to avoid further litigation. When the State failed to respond, the Zutts commenced an action in the Supreme Court, Putnam County, seeking injunctive relief and damages for inverse condemnation. On January 31, 2007, upon granting the State‘s pre-answer motion, the Supreme Court (O‘Rourke, J.) dismissed the complaint for lack of subject matter jurisdiction (hereinafter Zutt II). The Zutts appealed from so much of Zutt II as dismissed the cause of action for permanent injunctive relief, and we reversed, reinstating that cause of action (see Zutt v State of New York, 50 AD3d 1131 [2008]).
Thereafter, the State answered the complaint, asserting once again, among other things, the defense of prescriptive easement, a defense rejected by the Court of Claims and this Court in Zutt I. The Zutts moved for summary judgment, and the State opposed the motion. The parties each submitted affidavits of their respective experts. The Zutts’ expert, civil engineer Todd W. Atkinson, submitted a proposal for the State to run additional subsurface piping for approximately 250 feet within its right-of-way on Route 9D to divert the stormwater to a natural stream north of the Zutts’ property. In an order entered October 20, 2009 (hereinafter Zutt III), the Supreme Court (O‘Rourke, J.) granted the Zutts’ motion for summary judgment on the cause of action for a permanent injunction, and directed the State to implement Atkinson‘s stormwater diversion plan. The Supreme Court noted that, in Zutt I, the issues of the State‘s continuing trespass and lack of a prescriptive easement had been finally determined in favor of the Zutts; the State had “known of the condition and resulting damage to [the Zutts‘] property for many years and had done nothing to prevent the continuing trespass.”
The State appealed from Zutt III, thus invoking the automatic stay provision of
On May 4, 2010, two months after Zutt IV, more than six months after Zutt III, and while the appeal from Zutt III was pending, the State issued a notice of condemnation to the Zutts for a “permanent easement” over their property. The notice stated that the DOT
“ha[d] determined that reconstruction and reconfiguration of the drainage ditch over [the Zutts‘] property, along basically the same drainage course these storm waters have flowed for decades, remains the safest, most efficient, most cost-effective, and least disruptive means to address the State‘s ongoing Rt. 9D safety and maintenance responsibilities to the traveling public.”
The proposed permanent easement is “irregular in shape,” “[l]ong and narrow,” with “various widths,” and consists of a total area measuring approximately 15,411 square feet. With the notice, the State enclosed a copy of its proposed Appropriations Map No. 36R-1, and a copy of the preliminary design of the drainage course. The Zutts were offered compensation in the amount of $87,900 for damages to “land improvements including: two foot bridges, stone pathways, nine trees and an 18” corrugated metal pipe.”
The State had started planning for the condemnation prior to the injunction issued in Zutt III. On September 30, 2009, the DOT approved its initial project proposal for the condemnation, which recited that the project was undertaken in response to Zutt I to “rectify erosion and . . . trespass” on the Zutts’ property and to address “other issues as per lawsuit settlement.” The proposal stated that a public hearing was not necessary, and that the only “planned public involvement” was “coordination
Thereafter, on December 1, 2009, and subsequent to the injunction issued in Zutt III, the DOT completed a design approval for a “temporary easement” over the Zutts’ property, and, on February 12, 2010, completed a revised design approval for a “permanent easement.” Internal DOT memoranda bearing those dates stated that the condemnation was “being progressed as an exempt project” under SEQRA, that the easement was “needed to allow for the continued flow of stormwater across the [Zutts‘] property,” and that the easement was “being requested by the Office of Legal Affairs to satisfy the requirements of” Zutt III.
On May 26, 2010, which was shortly after the notice of condemnation dated May 4, 2010, but prior to the completion of the State‘s final design report on the project, the Zutts commenced an original proceeding in this Court pursuant to, inter alia, section 207 of the
Meanwhile, on June 15, 2010, prior to dismissal of the original proceeding in this Court, the State completed a final design
With respect to SEQRA, the final design report departed from the initial proposal‘s classification of the project as “exempt” from environmental review, finding instead that the project was a Type II action which presumptively does not require the preparation of an EIS because it involved merely the reconstruction of an existing structure or expansion of an existing waterway maintenance site by less than 50%, with no significant effect on the environment. In support of its determination that the project was a Type II action, the DOT stated that the project would not cause more than minor social, economic, or environmental effects upon occupied dwellings, abutting properties or other established human activities, or entail more than minor alteration of, or adverse effect upon, any protected area, including wetlands, prime or unique agricultural land, water resources including streams, or unique ecological natural wooded or scenic areas. The report stated that water had flowed along this course for approximately 80 years in essentially the same manner, and that the current channel would simply be widened and deepened slightly to prevent occasional overflows and erosion damage. Appended to the final design report was an “environmental checklist” form identifying 7 out of 30 enumerated factors
In July 2010, shortly after the completion of the final design report, the Zutts commenced the instant hybrid proceeding and action in the Supreme Court, Putnam County, seeking to enjoin the condemnation. Several months later, on January 25, 2011, we affirmed Zutt III, holding that the “conclusory assertions” of the State‘s expert witness failed to raise a triable issue sufficient to defeat the Zutts’ motion for summary judgment on their cause of action for a permanent injunction against the State (Zutt v State of New York, 80 AD3d 758, 759 [2011]). We further held that the Supreme Court, in directing the State to implement Atkinson‘s stormwater diversion plan, had appropriately complied with the duty of an equity court “to go no further than absolutely necessary to protect the rights of the complaining parties” by framing the injunction “as narrowly as possible” (id. [internal quotation marks omitted]).
The Instant Matter
In this hybrid proceeding and action, the Zutts sought, among other things, review of the DOT‘s condemnation determination, pursuant to
In their petition/complaint, the Zutts alleged that the State refused to comply with the injunction in Zutt III, failed to conduct a public hearing as required by
In its answer to the petition/complaint, the State denied that it had acted in bad faith, contending that its assertion of a prescriptive easement was not finally refuted until Zutt I was affirmed on appeal in 2008, no injunction had been issued until Zutt III in 2009, and it had complied with the EDPL and SEQRA. The State contended that any loss to the Zutts was purely economic and compensable with damages and, thus, that the Zutts had not shown a clear right either to a permanent injunction or, to the extent that the petition/complaint could be construed as requesting such relief, to the extraordinary relief of prohibition. Further, the State contended that the proposed condemnation had a rational basis, was not arbitrary and capricious, and was necessary to fulfill a proper public purpose.
In support of its verified answer, the State submitted an affirmation of the DOT attorney responsible for coordinating the investigation, development, and design of the proposed drainage easement, along with exhibits including the initial project proposal and the final design report. Citing the final design report, the DOT attorney averred that the proposed taking was de minimis and properly classified as a Type II action under SEQRA, and that compliance with Zutt III by means of diverting the runoff to the natural stream north of the Zutts’ property would cost $754,699, involve extensive reconstruction, require the creation or purchase of easements across neighboring property, and create a greater risk of flooding along Route 9D because the natural stream did not have sufficient capacity.
In reply, the Zutts and engineer Atkinson submitted affidavits, averring that the State had excluded them from its review process and had incorrectly characterized Alternative No. 2 in the final design report as the equivalent of Atkinson‘s proposal. As the Zutts and Atkinson explained it, contrary to the State‘s Alternative No. 2, the Atkinson proposal required no additional easements and posed no risk of flooding or involvement of historic church property on the west side of Route 9D. Instead, they explained that, under the Atkinson proposal, the drainage system was to be extended within the State‘s existing right-of-way on the eastern side of Route 9D to the northern culvert, and the additional drainage into the natural stream would
In addition, the Zutts and Atkinson averred that the proposed taking was not de minimis, and that the State‘s SEQRA determination was based on the faulty premise that the project involved an existing waterway or DOT structure. According to the Zutts and Atkinson, no such structure or waterway exists, and the drainage across the Zutts’ property is a continuing trespass. Moreover, the Zutts and Atkinson explained their understanding that the proposed project failed to meet several of the criteria for Type II actions articulated in the DOT‘s regulations at
Finally, the Zutts contended that, given the history of the underlying dispute, the State‘s failure to comply with required procedures under the EDPL and SEQRA and its pursuit of condemnation to avoid the permanent injunction issued by the Supreme Court establish that the State acted in bad faith. They argued that an additional indication of bad faith was the State‘s failure to render any SEQRA analysis until after they had commenced the original EDPL proceeding in the Appellate Division, precipitating the generation of the State‘s final design report and the incomplete “environmental checklist,” which failed to review the project‘s impact on the seven environmental factors identified on the environmental assessment form.
The Order and Judgment of the Supreme Court
In an order and judgment dated September 27, 2010, the Supreme Court held that the proposed condemnation was not de minimis, that the State acted in bad faith and in violation of
Analysis
The Public Hearing Requirement of the EDPL
Here, however, the State invoked a statutory exemption from the public hearing requirement that is applicable “when in the opinion of the condemnor the acquisition is de minimis in nature so that the public interest will not be prejudiced by the construction of the project” (
On this record, we conclude that the State‘s determination to invoke the exemption pursuant to
The Legislature‘s “primary goals” in enacting the procedure for eminent domain proceedings were to provide
” ‘a uniform and equitable procedure which assures that the public will be adequately informed through hearings of proposed public projects requiring the acquisition of land; that environmental and community impact will be weighed before the acquisition can go forward; and that every effort will be made to negotiate with owners for the acquisition of their property’ ” (Matter of County of Cortland [Miller], 72 AD3d 1436, 1437-1438 [2010], quoting Governor‘s Mem approving L 1977, ch 839, 1977 McKinney‘s Session Laws of NY at 2529 [emphasis added]).
Against this backdrop we consider the specific contention that the State improperly invoked an exemption to the EDPL. The record clearly does not support the State‘s “opinion” that the proposed taking is “de minimis” (
Under the totality of the circumstances, the nature of the proposed condemnation is obviously not de minimis, as that term has been interpreted in the context of the exemption pursuant to
Generally, a determination that the condemnor has improperly invoked an exemption to the EDPL would entitle the aggrieved property owner to an order or judgment annulling the determination and/or mandating the condemnor‘s compliance with the applicable procedures (see e.g. Matter of Spittler v Town of Hamburg, 4 AD3d 735 [2004]; Matter of Marshall v Town of Pittsford, 105 AD2d at 1141). Under the particular circumstances of this case, however, we conclude, as more fully set forth below, that the State has acted in bad faith, as manifested by a combination of factors, including the unique litigation history of this matter and the State‘s violation of the EDPL and SEQRA. Therefore, the Zutts not only are entitled to relief pursuant to
SEQRA
“SEQRA‘s fundamental policy is to inject environmental considerations directly into governmental decision making” (Matter of Coca-Cola Bottling Co. of N.Y. v Board of Estimate of City of N.Y., 72 NY2d 674, 679 [1988]). Since SEQRA contains no provision regarding judicial review, courts apply the standard governing proceedings pursuant to
“is limited to reviewing whether the determination was made in violation of lawful procedure, was affected by an error of law or was arbitrary and capricious or an abuse of discretion. The relevant question before the court is whether the agency identified the relevant areas of environmental concern, took a hard look at them, and made a reasoned elaboration of the basis for its determination” (Matter of Gernatt Asphalt Prods. v Town of Sardinia, 87 NY2d 668, 688 [1996] [internal quotation marks omitted]; see Matter of Riverkeeper, Inc. v Planning Bd. of Town of Southeast, 9 NY3d 219, 231-232 [2007]; Matter of Jackson v New York State Urban Dev. Corp., 67 NY2d at 417; Matter of Thorne v Village of Millbrook Planning Bd., 83 AD3d 723, 724 [2011]).
Here, the State contends that the proposed project was a Type II action without significant impact on the environment and, thus, presumptively does not require the preparation of an EIS under SEQRA (see
On this record, we can find no “reasoned elaboration of the basis for [the State‘s] determination” (Matter of Gernatt Asphalt Prods. v Town of Sardinia, 87 NY2d at 688 [internal quotation marks omitted]). The area in question on the Zutts’ property is neither a “waterway maintenance site” nor an “existing . . . culvert[ ]” under the jurisdiction of the DOT (
Even if the definitions in the DOT‘s regulations are deemed to encompass the project at hand, the DOT failed to satisfy the express proviso in its regulations applicable to each of these Type II actions, which requires the satisfaction of all criteria listed in subdivision (d) of
“no more than minor alteration of, or adverse effect upon, any property, protected area, or natural or man-made resource of national, State or local significance, including but not limited to . . . prime or unique agricultural land; . . . water resources, including lakes, reservoirs, rivers, streams; . . . designated wild, scenic and recreational rivers; [and] unique ecological, natural wooded or scenic areas” (
17 NYCRR 15.14 [d] [3] ,[6] ,[7] [iii] ,[v] ,[vii] ,[viii] ).
The State failed to take a “hard look” at any of these criteria or to give any “reasoned elaboration of the basis for its determination” that the project, as proposed, will not have a significant impact on these environmental resources.
Accordingly, the record reflects that the State failed to take the requisite “hard look” at whether the project would go beyond the ambit of any of the Type II criteria set forth in
A petitioner prevailing in a proceeding pursuant to
Bad Faith
The concept of bad faith is frequently discussed but rarely, if ever, found to exist in appeals from administrative determinations. We have previously stated that “[i]n the exercise by a body or agency of its condemnation power, the courts may interfere only on a clear showing of bad faith or conduct which is irrational, baseless or palpably unreasonable” (Matter of Dowling Coll. v Flacke, 78 AD2d 551, 552 [1980] [internal quotation marks omitted]). The “clear showing” standard has been repeated in numerous reported decisions involving allegations of bad faith in condemnation proceedings, yet none of these cases has resulted in a finding of bad faith (see Cuglar v Power Auth. of State of N.Y., 3 NY2d 1006 [1957], affg 4 AD2d 801 [1957], affg on op at 4 Misc 2d 879, 895 [1957]; Matter of 49 WB, LLC v Village of Haverstraw, 44 AD3d 226, 239 [2007]; Matter of Stankevich v Town of Southold, 29 AD3d 810, 811 [2006]; Matter of Faith Temple Church v Town of Brighton, 17 AD3d 1072, 1073 [2005]; Greenwich Assoc. v Metropolitan Transp. Auth., 152 AD2d 216, 221 [1989]; Village Auto Body Works v Incorporated Vil. of Westbury, 90 AD2d 502, 502 [1982]; Saso v State of New York, 20 Misc 2d 826, 829 [1959]).
Other cases, while not expressly articulating or applying the “clear showing” standard, have considered allegations of bad faith and found them unsubstantiated by the record (see Matter of Woodfield Equities LLC v Incorporated Vil. of Patchogue, 28 AD3d 488, 490 [2006]; Matter of Rafferty v Town of Colonie, 300 AD2d 719, 721 [2002]; Matter of Ranauro v Town of Owasco, 289 AD2d 1089, 1090 [2001]). The concept of bad faith is also frequently stated in the formulation of the arbitrary and capricious standard governing review of administrative determinations pursuant to
In eminent domain proceedings, an allegation of bad faith is often one and the same as a contention that the condemnor is acting without an appropriate public purpose or pretextually to benefit a private individual or entity. In such cases, the bad faith allegation must fail where objective data support a legitimate public purpose (see Matter of Kaur v New York State Urban Dev. Corp., 15 NY3d 235, 255 [2010], cert denied sub nom. Tuck-It-Away, Inc. v New York State Urban Dev. Corp., 562 US —, 131 S Ct 822 [2010]). Where the allegations of bad faith and lack of public purpose are separate and distinct, however, we review them independently (see e.g. Salvation Army v Central Islip Fire Dist., 230 AD2d 841 [1996]). We have also noted that allegations of bad faith can be based on conduct irrespective of any challenge to the condemnor‘s asserted legitimate public purpose, since “[b]ad faith is a concept separate and distinguishable from pretextual condemnations” (Matter of 49 WB, LLC v Village of Haverstraw, 44 AD3d at 239). Such is the case here. The State contends, and the Zutts do not seriously contest, that the State has a valid public purpose for the proposed condemnation, namely, the need to drain stormwater runoff to maintain safety on a public highway. Thus, we review the Zutts’ claim of bad faith by considering circumstances independent of this legitimate public purpose.
Some of the underpinnings of the bad faith allegation here, taken in isolation, have previously been rejected by courts in other contexts. For example, an allegation of bad faith will not be sustained merely because of the “suspicious timing” of a condemnation proceeding (Matter of Woodfield Equities LLC v Incorporated Vil. of Patchogue, 28 AD3d at 490; Matter of Broadway Schenectady Entertainment v County of Schenectady, 288 AD2d at 673). Nor is bad faith shown with “unsupported allegations” that the taking was “for purposes other than those stated” (Matter of Stankevich v Town of Southold, 29 AD3d at 811; see Matter of Rafferty v Town of Colonie, 300 AD2d at 721). The condemnor has broad discretion to decide what land is necessary to fulfill an appropriate public purpose, and a condemnation will not be enjoined merely because an alternate site is available to fulfill that purpose (see Matter of Stankevich v Town of Southold, 29 AD3d at 811; Matter of Gyrodyne Co. of Am., Inc. v State Univ. of N.Y. at Stony Brook, 17 AD3d 675, 676 [2005]; Matter of Neptune Assoc. v Consolidated Edison Co. of N.Y., 125 AD2d 473, 475 [1986]).
However, as a “general principle . . . there is no right to condemn land in excess of the need for public purposes, and . . . no more may be taken than is required for the particular public purpose” (Hallock v State of New York, 32 NY2d 599, 605 [1973]; see Matter of Gyrodyne Co. of Am., Inc. v State Univ. of N.Y. at Stony Brook, 17 AD3d at 676). Applying this principle, even in cases involving no bad faith on the part of the condemnor, we have modified determinations of condemnation when
As we have shown, while generally no single consideration might be sufficient to establish a “clear showing” of bad faith, we are faced here with a unique set of circumstances which we deem sufficient to satisfy this weighty burden. On the record presented, the State is not entitled to the usual deference it should be accorded in selecting an appropriate site for a condemnation to fulfill a legitimate public purpose.
In Zutt III, the Supreme Court directed the State to implement the Atkinson stormwater diversion plan. We affirmed that order, upon concluding that the State‘s expert witness had offered mere “conclusory assertions” that the Atkinson plan was not feasible (Zutt v State of New York, 80 AD3d at 759). While generally the condemnor has no obligation to explain its preference of one site over another in fulfilling a public purpose (see e.g. Matter of Neptune Assoc. v Consolidated Edison Co. of N.Y., 125 AD2d at 475), under the extraordinary circumstances presented here, in which the State deliberately ignored a court mandate in making its site selection, it was incumbent upon the State to offer some reasoned basis for its determination. This, it failed to do. In opposition to the petition/complaint, the State proffered only an attorney‘s affirmation, making reference to the unsworn design plans prepared by the DOT‘s engineers. The State has proffered no evidence or expert affidavit to refute the feasibility, cost-effectiveness, and engineering soundness of the Atkinson plan, which requires no condemnation of any private lands, and poses no adverse environmental impacts. The State‘s alleged reasons for its decision not to comply with the court‘s directive in Zutt III are based upon a cost analysis with .no factual support and a final design plan which did not even consider the Atkinson plan.
In addition, the State has unreasonably persisted in advancing the theory of prescriptive easement in two litigations subsequent to a determination against it after trial in 2006 that there was no prescriptive easement, and proceeded with planning for the proposed condemnation after Zutt III without involving the public, the Zutts, or Atkinson in the process. The State violated the spirit and letter of the
In sum, we conclude that the Zutts have made a “clear showing” that the State acted in bad faith (cf. Matter of 49 WB, LLC v Village of Haverstraw, 44 AD3d at 239). This showing of bad faith establishes the Zutts’ entitlement to relief pursuant to
Scope of Injunctive Relief
The Supreme Court enjoined the State from “pursuing any condemnation” of the Zutts’ property. However, the State sought only to condemn a particular portion of the Zutts’ property for a permanent drainage easement as specifically set forth in its Appropriations Map No. 36R-1. This is the only proposed condemnation under review, and we cannot render an advisory opinion as to any different circumstances which may or may not arise in the future. In keeping with our obligation to go no further than necessary to protect the rights of the petitioners/plaintiffs, we conclude that the order rendered by the Supreme Court was too broadly stated (see Zutt v State of New York, 80 AD3d at 759; Antinelli v Toner, 74 AD2d 996, 997-998 [1980]). Accordingly, we modify the terms of the injunction imposed by the Supreme Court to prohibit the State from pursuing the proposed condemnation of the drainage easement across the Zutts’ property, as depicted on its Appropriations Map No. 36R-1.
Dickerson, Leventhal and Hall, JJ., concur.
Ordered that the order and judgment is modified, on the law, by deleting the words, “The respondent is enjoined from pursuing any condemnation of petitioners’ property,” and substituting therefor the words, “The respondent/defendant is permanently enjoined from pursuing condemnation of the drainage easement across the petitioners/plaintiffs’ property, as depicted on its Appropriations Map No. 36R-1“; as so modified, the order and judgment is affirmed, with costs to the petitioners/plaintiffs.