Lower Susquehanna Riverkeeper v. Keystone Protein CompanyLower Susquehanna Riverkeeper v. Keystone Protein Company
MEMORANDUM
This is a citizen suit under the Clean Water Act, which is the United States’ primary federal law governing water pollution. Before the court are cross motions: Plaintiffs’ motion for partial summary judgment, Doc. 32, and Defendant‘s motion for summary judgment, Doc. 35. For the reasons that follow, Plaintiffs’ motion will be granted in part and denied in part, and Defendant‘s motion will be denied.
PROCEDURAL HISTORY
Plaintiffs Lower Susquehanna Riverkeeper and the Lower Susquehanna Riverkeeper Association initiated this case by filing a complaint on July 29, 2019 against Defendant Keystone Protein Company (“Keystone“), which owns and operates a poultry rendering facility that generates industrial wastewater. (Doc. 1.) Keystone answered the complaint on August 21, 2019. (Doc. 7.) In the complaint, Plaintiffs allege that Keystone “has discharged and continues to discharge pollutants into waters of the United States in violation of” the Clean Water Act as well as “the conditions and limitations” established by a related permit system. (Doc. 1 ¶ 2.) Plaintiffs request damages as well as declaratory and injunctive relief. (Id. ¶ 1.)
Keystone filed its first motion for summary judgment on October 25, 2019. (Doc. 15.) Following a conference call on May 5, 2020, and Keystone‘s filing of another motion for summary judgment on May 29, 2020, the court denied Keystone‘s first motion as moot. (Doc. 38.) Plaintiffs filed thеir motion for partial summary judgment on
The parties briefed their respective motions in May, June, and July 2020. (See Docs. 32-46.) Plaintiffs then supplemented the summary judgment record on February 1, 2021. (Doc. 48.) Both motions are now ripe for the court‘s review.
FACTUAL BACKGROUND1
A. Keystone‘s Wastewater Treatment and Nitrogen Discharges
On March 30, 2012, the Pennsylvania Department of Environmental Protection (“PADEP“) re-issued NPDES Permit No. PA0080829 (“the NPDES permit“) to Keystone. (Doc. 31 ¶ 1.) The NPDES permit authorized Keystone‘s “discharge of wаstewater in accordance with certain effluent limitations and other requirements.” (Doc. 36 ¶ 5.) The relevant limitations here are that the NPDES permit limited “Keystone‘s . . . discharges of total nitrogen from” Keystone‘s wastewater treatment plant, “Outfall 001,” “to 134 mg/l as a monthly average concentration and 194 mg/l as a daily maximum concentration.” (Doc. 31 ¶ 1.) The NPDES permit remains in effect. (Id.)
Keystone admits that it has been in continuous noncompliance with its total nitrogen limits since April 1, 2012, when the NPDES permit took effect. (Doc. 33 ¶ 1.) In particular, “Keystone violated its monthly average concentration limit for total nitrogen at Outfall 001 in 66 conseсutive months from October 2014 through March 2020.” (Doc. 31 ¶ 12.) And “Keystone violated its daily maximum concentration limit for total nitrogen at Outfall 001 on 257 days in 66 consecutive months from October 2014 through March 2020.” (Id. ¶ 13.) Further, in supplementing the record, Plaintiffs have provided evidence of “additional violations” “from April through October 2020” which “bring the total number of days of violating the daily maximum limit to 288 and the total number of months of violating the monthly average limit to 73.” (Doc. 48, pp. 1-2.2)
Keystone discharges from Outfall 001 24 hours a day and seven days a week. (Doc. 33 ¶ 2.) Keystone filed reports covering October 2014 to March 2020 with PADEP. Those reports “show that Keystone discharged wastewater flоw from Outfall 001 on every day during those 66 months except for the eighteen days on April 24-26, 2017, December 11-14, 2018, March 12-15, 2019, and January 11-17, 2020. The total number of days with discharges during those 66 months is 2,009 minus 18, or 1,991 days.” (Doc. 33 ¶ 3.)
Keystone‘s wastewater treatment plant was not designed to meet, and therefore could not meet, its permit limits for total nitrogen. (Doc. 33 ¶ 4.) In 2012, Keystone‘s engineering consultant, Mr. John Reid, designed an upgrade to Keystone‘s treatment plant so that it could meet its permit limits. (Id.) That 2012 upgrade was never built. (Id.) In 2019, Keystone began building another upgrade to its treatment plant; this upgrade was scheduled to be finished in August 2020. (Id.)3
B. The Discharge Impairs the Chesapeake Bay
The United States Environmental Protection Association (hereinafter “the EPA“) “has listed the Chesapeake Bay as impaired because of excess nitrogen, phosphorus and sediment.” In 2010, the EPA “issued a Total Maximum Daily Load (“TMDL“) under the [Clean Water Act] that established nitrogen, phosphorus, and sediment allocations for the Bay and the watersheds that flow into it, including the Susquehanna River watershed.” (Doc. 31 ¶ 14.) “Sometime after the Chesapeake Bay TMDL was issued, [PADEP] classified Keystone as a significant discharger of nitrogen to the Chesapeake Bay.” (Id. ¶ 15.) Keystone‘s wastewater treatment plants ultimately (after different twists, turns, and mergers) discharge nitrogen into the Chesapeake Bay. (See id. ¶ 16.)
Plaintiffs are “non-profit organizations that seek to protect the ecological integrity and water quality of the Lower Susquehanna River, its tributaries, and the Chesapeake Bay.” (Id. ¶ 17.) Plaintiffs’ members Ted Evgeniades, Keith Williams and Todd Kennedy “use Swatara Creek, the Susquehanna River, and the Chesapeake Bay for recreational activities.” (Id. ¶ 18.)
“The Swatara Creek, Susquehanna River, and Chesapeake Bay are downstream from Keystone‘s discharges. Excessive nutrients like total nitrogen can feed the growth of algae and slime in downstream waters and create oxygen-depleted dead zones in the Bay. All three members complain that they have seen these conditions and that those conditions have reduced their aesthetic and recreational enjoyment of the Creek, River, and Bay.” (Id. ¶ 19.)
C. PADEP and Keystone‘s Consent Orders
In 2012, PADEP and Keystone entered into an administrative Consent Order and Agreement (“the 2012 consent order“). (Doc. 31 ¶ 4.) Keystone entered into the 2012 consent order “to upgrade its existing rendering plant wastewater treatment plant in order to comply with the total nitrogen limits and other parameters in its [NPDES] permit by October 1, 2016.” (Doc. 36 ¶ 7.) The 2012 consent order “imposed stipulated penalties for the discharges that exceed the NPDES permit limits.” (Doc. 36 ¶ 8.) Plaintiffs have had actual notice of the 2012 consent order for six years. (Doc. 31 ¶ 5.)
In 2017, PADEP and Keystone entered into a second administrative Consent Order and Agreement (“the 2017 consent order“), which superseded and replaced the 2012 consent order. (Id. ¶ 6.) The 2017 consent order “requires complete construction of a new wastewater treatment facility by June 1, 2021 so that Keystone can meet its effluent limitation guidelines, and imposes stipulated penalties for discharges exceeding Keystone‘s NPDES effluent limits.” (Doc. 36 ¶ 12.) Plaintiffs have had actual notice of the 2017 consent order since at least March 4, 2019. (Doc. 31 ¶ 7.)
Both consent orders were negotiated and signеd without any prior notice to the Plaintiffs or to the public more generally. Neither the public nor Plaintiffs had an opportunity to comment on or object to the consent orders. (Id. ¶ 8.) Plaintiffs have not filed an appeal of either consent order with the Pennsylvania Environmental Hearing Board. (Id. ¶ 9; Doc. 36 ¶¶ 10, 14.)
In 2019, Keystone entered into an amendment (“the 2019 amendment“) to the 2017 consent order. (Doc. 31 ¶ 10.) The 2019 amendment “required the construction by December 31, 2020 of an interim upgrade to the existing WWTP . . . so that Keystone [could] meet its [total nitrogen] limits while it [was] in the process of constructing [a new wastewater treatment facility].” The 2019 amendment “also requires that by August 21, 2021 Keystone
JURISDICTION
As a general matter, this court has jurisdiction under
In this case, though, the parties raise two jurisdictional issues. First, Plaintiffs ask the court to hold that Plaintiffs have standing to bring their lawsuit. Second, Keystone asks the court to hold that the court is without jurisdiction to decide Plaintiffs’ lawsuit. According to Keystone, Plaintiffs’ lawsuit is precluded by PADEP‘s own enforcement action, which has been manifested through the two consent orders.
A. Standing
The parties assert that they have stipulated to the facts that provide the foundation upon which the court can base a determination that Plaintiffs have standing to bring their lawsuit. (See, e.g., Doc. 34, pp. 7-8.) But as “standing is an Article III requirement for jurisdiction, the parties do not have the power to confer such jurisdiction upon the Court by conceding the standing of certain plaintiffs.” Golden v. Gov‘t of Virgin Islands, Bureau of Internal Revenue, 47 F. App‘x 620, 622 (3d Cir. 2002) (quoting Barhold v. Rodriguez, 863 F.2d 233, 234 (2d Cir. 1988)). The court will therefore analyze whether the uncontested jurisdictional facts do, in fact, imbue Plaintiffs with standing.
Plaintiffs bring their lawsuit under Section 505(g) of the Clean Water Act. (See Doc. 1 ¶¶ 1, 3.) This provision authorizes a citizen suit by “any person or persоns having an interest which is or may be adversely affected.”
The analysis begins with “injury in fact.” “[W]here an environmental plaintiff has demonstrated that his or her use of the affected area has been curtailed or that the aesthetic аnd recreational value of the area has been or will be lessened, an injury in fact will be found.” PennEnvironment v. RRI Energy Ne. Mgmt. Co., 744 F. Supp. 2d 466, 477 (W.D. Pa. 2010). Here, the declarations of three of Plaintiffs’ members establish that they have suffered an injury in fact. As outlined in the factual background, the three members have declared that they use Swatara Creek, the Susquehanna River, and the Chesapeake Bay for recreational activities. They have also declared that that they have seen the byproducts of Keystone‘s discharges, and that those conditions have reduced their aesthetic and recreational enjoyment of the Creek, River, and Bay. Under the аbove analytical framework, these declarations suffice to establish that Plaintiffs have suffered an injury in fact.
Next is traceability. In this kind of case, traceability “may be established by
Third is redressability. Plaintiffs request a court order directing “Keystone to immediately comply with effluent limitations contained in its NPDES permit.” (Doc. 1, p. 10.) Plaintiffs also ask the court to enjoin Keystone from “operating its facilities in such a manner as will result in further violations of its NPDES permit and the” Clean Water Act. (Id. at 9.) And Plaintiffs request that Keystone be ordered “to pay appropriate civil penalties for each violation оf its NPDES permits and the” Clean Water Act.” (Id. at 10.) The court finds that, here, an injunction will redress, at least in part, the harm to the water quality. See PennEnvironment, 744 F. Supp. 2d at 481. Moreover, the imposition of civil penalties not only is likely to deter Keystone from exceeding its permit levels in the future, but also will serve to deter others as well. Id. at 482.
Finally, the court needs to determine the issue of associational standing. As the United States Supreme Court has stated, “we have recognized that an association has standing to bring suit on behalf of its members when: (a) its members would otherwise have standing to sue in their own right; (b) the interests it seeks to protect are germane to the orgаnization‘s purpose; and (c) neither the claim asserted nor the relief requested requires the participation of individual members in the lawsuit.” Hunt v. Washington State Apple Advert. Comm‘n, 432 U.S. 333, 343 (1977).
The court finds that Plaintiffs meet all three requirements for associational standing. As described above, Plaintiffs have shown that three members of the Lower Susquehanna Riverkeeper Association have standing to sue in their own right. Second, the interests that the Lower Susquehanna Riverkeeper Association seeks to protect are germane to its purpose of “protect[ing] the ecological integrity and water quality of the Lower Susquehanna River, its tributaries, and the Chesapeake Bay.” (Doc. 31 ¶ 17.) And third, the Lower Susquehanna Riverkeeper Association brings a citizen lawsuit claim under the Clean Water Act and requests civil penalties as well as declaratory and injunctive relief. As other district courts in Pennsylvania have held, it is appropriate for an association to request these remedies in the context of a Clean Water Act action. See PennEnvironment, 744 F. Supp. 2d at 482 (holding that association seeking civil penalties had satisfied requirements for associational standing); see also Citizens Coal Council v. Emerald Coal Res., LP, Civil Action No. 13-003, 2013 U.S. Dist. LEXIS 109481, at *21 (W.D. Pa. June 10, 2013) (same).
As the above analysis shows, each of the plaintiffs in this litigation has standing. Therefore, the court will grant the part of Plaintiffs’ motion for partial summary judgment related to standing.
B. Preclusion
Section 505(a)(1) of the Clean Water Act authorizes citizen suits against alleged
The relevant limitation here is that “any violation . . . with respect to which a State has commenced and is diligently prosecuting an action under a State law comparable to this subsection . . . shall not be the subject of a civil penalty action.”
Keystone contends that, by virtue of the two consent orders, PADEP has “commenced” an action against Keystone and is “diligently prosecuting” that action. Further, Keystone contends that PADEP is proceeding “under a State law comparable to” the Clean Water Act‘s relevant subsection.
The court finds that the Pennsylvania legal regime here, the
1. The “Rough Comparability” Standard is Appropriate.
“A comparable state law does not mean that its provisions are identical to the” Clean Water Act. L.E.A.D. (Lead Envtl. Awareness Dev. v. Exide Corp.), No. CIV. 96-3030, 1999 WL 124473, at *31 (E.D. Pa. Feb. 19, 1999) (citing North & South Rivers Watershed Ass‘n, Inc. v. Scituate, 949 F.2d 552, 556 (1st Cir. 1991)). There is presently a Circuit split on what finding a federal district court needs to make to determine “comparability.” The United States Court of Appeals for the Third Circuit has not articulated which standard the court should employ.
The first standard, “overall comparability,” allows more leeway. This standard asks a district court to look at the state law in a holistic manner. Key factors are whether “the state law contains comparable penalty provisions which the state is authorized to enforce, has the same overall enforcement goals as the federal [Clean Water Act], provides interested citizens a meaningful opportunity to participate at significant stages of the decision-making process, and adequately safeguards their legitimate substantive interests.” Arkansas Wildlife Fed‘n v. ICI Americas, Inc., 29 F.3d 376, 381 (8th Cir. 1994).
The second standard, “rough comparability,” is more restrictive. “Under that approach,” a federal court must “focus
For the following reasons, the court finds the “rough comparability” standard more appropriate. “First, requiring compatibility between each class of provisions makes § 1319(g)(6) easier to apply,” and prevents this court from having to “weigh incommensurable valuеs.” McAbee, 318 F.3d at 1255; see Cont‘l Carbon, 428 F.3d at 1294 (citing McAbee, 318 F.3d at 1255). Second, adopting this standard reduces uncertainty for litigants, the legislature, and administrative agencies. McAbee, 318 F.3d at 1255; see Cont‘l Carbon, 428 F.3d at 1294 (citing McAbee, 318 F.3d at 1255). And third, this standard is the most logical consequence of the text of
2. The Clean Streams Law Does Not Meet the “Rough Comparability” Standard.
Applying the “rough comparability” standard in this case, the court finds that the
Keystone argues that citizens’ “right to administratively appeal all [consent orders] and other final actions of the [PADEP] to” the Commonwealth of Pennsylvania‘s Environmental Hearing Board constitutes enough public participation. (Doc. 46, p. 13.) However, “[e]ssentially, the Clean Water Act provides for public participation in three ways: (1) a reasonable notice and opportunity to comment before the issuance of the proposed order assessing a civil penalty; (2) the right to present evidence if a hearing is held; and (3) the right to petition for a hearing if one is not held.” Paper, 428 F.3d at 1295 (citing
The court acknowledges that the word “comparable” does not indicate that public participation provisions need to be identical between federal and state law. But the Clean Water Act‘s provisions for notice
The difference here is especially clear because notice of the decision-making process itself is not provided; rather, only notice of the consent order, after the fact, is provided. The notice-and-comment process is a component that Congress expressly provided for in its construction of this administrative decision-making. To ignore this requirement and focus only on the option of an after-the-fact hearing seems to stretch the meaning of “comparability.” For example, in McAbee v. City of Fort Payne, the United States Court of Appeals for the Eleventh Circuit, in holding that a state law‘s public participation provisions were not comparable to the Cleаn Water Act, held also that “a right to pre-order participation is markedly different from the right to post-decision participation.” 318 F.3d at 1256-1257 (11th Cir. 2003); see also, e.g., Nat. Res. Def. Council, Inc. v. Vygen Corp., 803 F. Supp. 97, 101-02 (N.D. Ohio 1992) (“Congress was careful to limit preclusion of citizen enforcement actions only in those situations where the affected public had ample opportunity to participate in the process by which the administrative action was taken. . . . Public notice is fundamental to protecting citizen participation in agency decisions. If the public does not know about agency actions, it cannot avail itself of any right to participate in any action that may be taken pursuant to that statute.” (emphasis in original); Pub. Interest Research Grp. of New Jersey, Inc. v. GAF Corp., 770 F. Supp. 943, 951 (D.N.J. 1991), disagreed with on other grounds by Grp. Against Smog & Pollution, Inc. v. Shenango Inc., 810 F.3d 116 (3d Cir. 2016) (lack of notice was one factor in finding that New Jersey statute was not comparable); Pub. Interest Research Grp. of New Jersey, Inc. v. New Jersey Expressway Auth., 822 F. Supp. 174, 184 (D.N.J. 1992) (lack of notice and comment procedures was one factor in finding that New Jersey statute was not comparable).
The court finds that the
The court will
STANDARD OF REVIEW
A court may grant a motion for summary judgment when “there is no genuine dispute as to any material fact and the movant is entitled to judgment as a matter of law.”
In reviewing a motion for summary judgment, the court must view the facts in the light most favorable to the non-moving party and draw all reasonable inferencеs in that party‘s favor. Jutrowski v. Twp. of Riverdale, 904 F.3d 280, 288 (3d Cir. 2018) (citing Scheidemantle v. Slippery Rock Univ. State Sys. of Higher Educ., 470 F.3d 535, 538 (3d Cir. 2006)). The court may not “weigh the evidence” or “determine the truth of the matter.” Anderson, 477 U.S. at 249. Instead, the court‘s role in reviewing the facts of the case is “to determine whether there is a genuine issue for trial.” Id.
The party moving for summary judgment “bears the initial responsibility of informing the district court of the basis for its motion, and identifying those portions of ‘the pleadings, depositions, answers to interrogatories, and admissions on file, together with the affidavits, if any,’ which it believes demonstrate the absence of a genuine issue of material fact.” Celotex Corp. v. Catrett, 477 U.S. 317, 323 (1986) (quoting
Summary judgment is appropriate where the non-moving party “fails to make a showing sufficient to establish the existence of an element essential to that party‘s case, and on which that party will bear the burden of proof at trial.” Celotex, 477 U.S. at 322. “The mere existence of a scintilla of evidence in support of the plaintiff‘s position will be insufficient; there must be evidence on which the jury сould reasonably find for the plaintiff.” Anderson, 477 U.S. at 252. “Where the record taken as a whole could not lead a rational trier of fact to find for the non-moving party, there is no genuine issue for trial.” Matsushita Elec. Indus. Co., Ltd. v. Zenith Radio Corp., 475 U.S. 574, 587 (1986).
DISCUSSION
Having resolved the threshold jurisdictional issues of standing and preclusion, the court will now discuss additional issues on which Plaintiffs have moved for summary
The court will defer judgment on the second issue until the penalty phase of this litigation. The court is choosing to defer for two reasons. First, it is more efficient for the court to decide all penalty-related issues in the same distinct phase. For example, in its opposition to Plaintiffs’ motion, Keystone raises a number of mitigating arguments concerning the “number of violations for Keystone‘s monthly average permit limitation exceedances” that the court should impose. (Doc. 43, pp. 8-9.) Another court has observed that this determination “is interrelated with the Court‘s discretionary assessment of appropriate civil penalties.” Inland Empire Waterkeeper v. Uniweb, Inc., No. EDCV07-00480DDP FMOX, 2008 WL 6098645, at *10 (C.D. Cal. Aug. 6, 2008). The court finds this reasoning persuasive, and the court would prefer to handle all aspects of this “discretionary assessment” at one time, as opposed to piecemeal over multiple rounds of briefing and decisions.
Second, the court notes that Plaintiffs have requested summary judgment on the second issue in their reply brief. (See Doc. 45, pp. 8-9.) The court will “decline[] to consider [this] argument[] raised for the first time in a Reply brief,” as Keystone has not had the opportunity to respond to Plaintiffs’ request for summary judgment on this issue. Hayes v. Silvers, Langsam & Weitzman, P.C., 441 F. Supp. 3d 62, 67 (E.D. Pa. 2020). The court notes that both parties will have the opportunity tо fully address this issue later during the briefing of the penalty phase.
Turning to the first issue - the number of violating days for which Keystone faces liability - the court begins by outlining the guidepost standards established by the Clean Water Act. Section 505(a)(1) of the Clean Water Act authorizes citizens to bring suit for violation of any “effluent standard or limitation.”
Additionally, permits like the NPDES permit in this litigation provide for two types of effluent limitations and, consequently, two types of violations. The first effluent limitation sets a limit on the monthly average concentration of a substance. The second effluent limitation sets a limit on the daily concentration of a substance. (See Doc. 1 ¶¶ 24-25.) “[D]aily and monthly average limits are designed to avoid distinct environmental harms.” Allegheny Ludlum, 366 F.3d at 169.
Here, “Keystone violated its monthly average concentration limit for total nitrogen at Outfall 001 in 66 consecutive months from October 2014 through March 2020.” (Doc. 31 ¶ 12.) And “Keystоne violated its daily maximum concentration limit for total nitrogen at Outfall 001 on 257 days in 66 consecutive months from October 2014 through March 2020.” (Doc. 31 ¶ 13.) Further, “Keystone has provided Plaintiffs
Keystone does not dispute the total number of days in which it violated the daily maximum limit. See generally Doc. 48. Thus, the court finds that the total number of days in which Keystone has violated its daily maximum limit is 288. And the court will therefore grant the part of Plaintiffs’ motion for partial summary judgment concerning Keystone‘s liability for its daily maximum violations.7
The monthly average limit, however, presents different considerations than does the daily maximum limit. The court will defer determination of the extent of Keystone‘s violations of the monthly average limit. In United States v. Allegheny Ludlum Corp., the United States Court of Appeals for the Third Circuit held that “district courts have discretion to determine, on the facts of each case, how many violation days should be assessed for penalty purposes for the violation of a monthly average limit, based on whether violations are already sufficiently sanctioned as violations of a daily maximum limit.” 366 F.3d at 169. This holding compels the court to revisit Keystone‘s violations of the monthly average limit at the penalty phase of this litigation.8 At the penalty phase, the court will have a more fulsome factual record to consider. See generally
CONCLUSION
For the foregoing reasons, Plaintiffs’ motion for partial summary judgment will be granted in part and denied in part. Keystone‘s motion for summary judgment will be denied. An appropriate order follows.
Dated: February 18, 2021
s/Jennifer P. Wilson
JENNIFER P. WILSON
United States District Court Judge
Middle District of Pennsylvania