In re Diverging Diamond Interchange Act 250 (R.L. Vallee, Inc., Appellant)
No. 2020-147
Supreme Court of Vermont
September Term, 2020
2020 VT 98
Thomas G. Walsh, J.
On Appeal from Superior Court, Environmental Division
NOTICE: This opinion is subject to motions for reargument under
Jon T. Anderson of Primmer Piper Eggleston & Cramer, and Alexander J. LaRosa of MSK Attorneys, Burlington, for Appellant.
Thomas J. Donovan, Jr., Attorney General, and Justin Kolber and Jenny E. Ronis, Assistant Attorneys General, Montpelier, for Appellees State of Vermont, Agency of Transportation, Natural Resources Board, and Agency of Natural Resources.
PRESENT: Reiber, C.J., Robinson, Eaton, Carroll and Cohen, JJ.
¶ 2. In June 2018, the Environmental Division granted VTrans‘s application for an Act 250 permit for the project. Vallee and Timberlake Associates, LLP, appealed.1 In August 2019, this Court reversed the issuance of the Act 250 permit and remanded the matter for the Environmental Division to consider whether the project would cause undue water pollution due to increased phosphorus and chloride discharges. In re Diverging Diamond Interchange SW Permit, 2019 VT 57, ¶ 1, __Vt. __, 218 A.3d 564. The Environmental Division held a three-day trial considering these questions. In April 2020, the court issued the decision on appeal, in which it concluded that the project would not cause undue water pollution and granted VTrans‘s application for the Act 250 permit.
¶ 3. In its decision, the Environmental Division found the following facts, which are undisputed. The project involves a proposed diverging diamond interchange at Exit 16 off I-89 in Colchester and related construction on U.S. Route 2/7. The project will increase the impervious surface by 1.2 acres and will increase the roadway by 0.38 lane miles.2 Of the 0.38 new lane miles, VTrans owns and is responsible for winter maintenance of 0.29 lane miles and the Town of Colchester owns and is responsible for maintenance of 0.09 lane miles. The project area discharges stormwater runoff to Sunnyside Brook, which ultimately flows to Lake Champlain. Stormwater runoff contains phosphorus and chloride, among other constituents. Currently, there is no permitted stormwater treatment system in the project area. The project will install a stormwater treatment system. The Vermont Department of Environmental Conservation (DEC) issued a stormwater discharge permit for the project to address new discharges.
¶ 4. Because the project increases impervious surface, it will increase the discharge of phosphorus into Sunnyside Brook and, ultimately, to Lake Champlain.
¶ 5. Sunnyside Brook is not currently listed as impaired for phosphorus. Lake Champlain, however, is currently listed as impaired for phosphorus. In total, the main lake segment of Lake Champlain receives about 359,000 pounds of phosphorus each year. In 2016, the United States Environmental Protection Agency (EPA) adopted a Total Maximum Daily Load (TMDL) for phosphorus entering Lake Champlain. A TMDL creates a “pollution budget” that calculates how much pollution a water body can manage while maintaining appropriate water quality standards. The Lake Champlain phosphorus TMDL does not prohibit future development or discharges, but it does require “developed land” to reduce discharges in a manner that offsets future growth. The State of Vermont has adopted an Implementation Plan to comply with the phosphorus TMDL. While neither regulation binds the project, the Environmental Division acknowledged that they “provide helpful context on Vermont‘s approach to phosphorus pollution, and guidance on [the Vermont Agency of Natural Resources‘] current policies and priorities.”
¶ 6. The project will also cause an increased discharge of chloride into Sunnyside Brook. Both VTrans and the Town of Colchester use chloride as part of routine winter maintenance to remove snow and ice from the roadways. Once applied to the roads, chloride is discharged into waterways as a part of stormwater runoff. Chloride cannot be removed from stormwater.
¶ 7. Sunnyside Brook is currently listed as impaired for chloride. The 2011 Vermont Water Quality Standards do not specifically address chloride. There is no chloride TMDL in effect for the Sunnyside Brook watershed, although the DEC is currently preparing one. In 2014, Vermont adopted two chloride standards set by the EPA. The acute standard, at 860 mg/L, is the highest concentration of chloride to which aquatic life can be exposed for a short period—usually one hour, once every three years—without deleterious results. The chronic standard, at 230 mg/L, is the highest concentration of chloride to which aquatic life can be exposed for an extended period—usually four days, once every three years—without deleterious effects.
¶ 8. In its analysis, the Environmental Division first considered whether the project would cause undue phosphorus pollution in Lake Champlain. It defined “undue” to mean “more than necessary—exceeding what is appropriate or normal.” The court found that the project complied with all applicable regulations, weighing in favor of compliance with Criterion 1.
¶ 9. The court next determined that the project would create an “exceedingly small amount” of additional phosphorus pollution when compared to the total amount of phosphorus discharged into Lake Champlain on a yearly basis. In making this determination, the court acknowledged conflicting testimony by VTrans‘s and Vallee‘s experts as to the amount of additional phosphorus discharge created by the project. Based on their different projections, VTrans‘s expert calculated that the project would increase phosphorus discharge by 0.11 pounds per year, while Vallee‘s expert found that the project would increase phosphorus discharge by 1.62 pounds per year. While the court “found both experts credible,” it held that Vallee‘s expert failed to refute VTrans‘s claim that his estimate was overinclusive or explain why VTrans‘s method was inaccurate. However, it concluded that under either estimate, the likely
¶ 10. The court next looked to the floodplains and their ability to support phosphorus disposal. Again, the experts presented conflicting evidence about the capacity of wetlands and floodplains to retain phosphorus, but they agreed that phosphorus could be retained in some circumstances. Based on this evidence, the court found that the floodplain had capacity to retain phosphorus on some occasions, but “afford[ed] little weight to this conclusion.”
¶ 11. The court next looked to mitigation measures that could reduce the amount of pollution discharged. VTrans‘s experts testified that the grass channels could remove forty percent of the phosphorus discharge, while Vallee‘s expert testified that the channels could remove around nine percent. Even accepting Vallee‘s expert‘s conclusion, the court found that the channels effectively reduced phosphorus pollution. Vallee‘s expert also presented evidence that additional mitigation measures were available, but the court afforded little weight to this evidence for two reasons. First, Vallee‘s expert testified that using a different filter material in the channels would increase mitigation, but he did not quantify the amount of additional phosphorus that could be removed through this measure. Second, Vallee introduced a memorandum that discussed additional off-site treatment practices but argued that these practices would require an amended Act 250 application and remand. Accordingly, the court determined that these measures were not “reasonably available” to VTrans. As such, the court determined that VTrans presented evidence of sufficient mitigation measures, and Vallee failed to demonstrate that additional mitigation was needed.
¶ 12. Finally, the court considered the nature of the pollution and the affected area. The court noted that while the goal of Act 250 is to protect and conserve Vermont‘s environment, the statute balances environmental protection against the need for development and does not prohibit all discharges of pollutants. Even though Lake Champlain is impaired for phosphorus, the Phosphorus TMDL likewise does not prohibit all discharges. Accordingly, the court determined that Vallee‘s argument that any phosphorus discharge into Lake Champlain is necessarily undue “direct[ly] contraste[ed] with the governing law and policy on the matter.” Instead, the court weighed the Criterion 1 factors and determined that “[t]he cumulative evidence . . . weighs in VTrans‘[s] favor,” concluding that the project‘s phosphorus discharges did not create undue water pollution.
¶ 13. The court next considered whether the project would cause undue chloride pollution in Sunnyside Brook. As with phosphorus, the project is not bound by specific chloride discharge standards. The court‘s analysis of chloride pollution differed from its phosphorus analysis, however, because no chloride TMDL existed and the court had “no information regarding Vermont‘s present or future chloride pollution plans or policies.” The court thus weighed the project‘s chloride discharges in the context of VTrans‘s duty to maintain safe roads during the winter and Sunnyside Brook‘s status as impaired for chloride.
¶ 14. Vallee‘s expert studied Sunnyside Brook‘s chloride levels for two years. He found that chloride levels in the brook nearly always exceed the chronic standard
¶ 15. The court found that VTrans uses chloride in winter road maintenance to fulfill its statutory duty to keep state highways safe for travel. In carrying out this duty, VTrans presented evidence showing its “history of chloride reduction and a commitment to further improvement.” VTrans‘s Snow and Ice Control Plan contains several best management practices to reduce chloride, and implementation of the plan corresponded with a nine-percent reduction in VTrans‘s average salt use. The project‘s Chloride Management Plan was created in accordance with the statewide Snow and Ice Control Plan, and the court found that VTrans‘s expert testified credibly about VTrans‘s compliance with the plan and ongoing commitment to reduce chloride use. The court also found that the Chloride Management Plan was developed in accordance with the Town of Colchester‘s Snow and Ice Removal Plan.
¶ 16. Vallee argued that VTrans had additional mitigation measures available to reduce chloride discharges and had to implement these measures to show that the project would not cause undue water pollution. VTrans‘s expert testified that VTrans was currently implementing or testing several of these measures. However, he also explained that some of the proposed site-specific best management practices posed safety concerns. Because VTrans‘s expert was “directly responsible for VTrans‘[s] winter maintenance activities,” the court gave great weight to his testimony. The court reiterated that permit applicants are not required to take all available mitigation measures to show that pollution is not undue. Further, Vallee did not present evidence quantifying the amount of chloride reduction that would result from implementing these measures. In weighing these factors, the court concluded that the project‘s chloride discharges did not create undue water pollution. Accordingly, the court found that the project complied with Criterion 1 and granted VTrans‘s application for an Act 250 permit for the project. This appeal followed.
¶ 17. On appeal, Vallee argues that (1) the Environmental Division improperly applied a de minimis standard in evaluating phosphorus pollution under Criterion 1 and accordingly erred in finding that the phosphorus discharge would not cause undue pollution, and (2) the Environmental Division erred in finding that the chloride discharge would not cause undue pollution.
¶ 18. “We review the Environmental Division‘s legal conclusions de novo and its finding of facts for clear error.” In re N.E. Materials Grp., LLC, 2019 VT 55, ¶ 6, ___ Vt. ___, 217 A.3d 541. We give significant deference to the Environmental Division‘s factual findings. In re Route 103 Quarry, 2008 VT 88, ¶ 4, 184 Vt. 283, 958 A.2d 694. We will determine that the court‘s factual findings are clearly erroneous only if there is no credible evidence to support them. In re Korrow Real Estate, LLC Act 250 Permit Amendment Application, 2018 VT 39, ¶ 17, 207 Vt. 274, 187 A.3d 1125.
¶ 19. Under Criterion 1, Act 250 permit applicants must show that the development will not cause “undue water or air pollution.”
the elevation of land above sea level; and in relation to the flood plains, the nature of soils and subsoils and their ability to adequately support waste disposal; the slope of the land and its effect on effluents; the availability of streams for disposal of effluents; and the applicable Health and Environmental Conservation Department regulations.
¶ 20. We begin with Vallee‘s argument that the court erroneously applied a de minimis standard under Criterion 1. Vallee contends that because the court characterized the amount of phosphorus discharged by the project as “exceedingly small,” the court improperly created a de minimis exception to the analysis under
¶ 21. Thus, the court did not apply a de minimis standard, and Vallee‘s argument mistakenly characterizes the court‘s factual finding as a legal standard.3 In fact, the court agreed with Vallee that “there is no . . . automatic allowance for de minimis water pollution under Criterion 1.” The court properly engaged in a multi-factor inquiry to determine whether the project caused undue phosphorus pollution.4 See N.E. Materials Grp., LLC, 2019 VT 55, ¶ 28 (listing factors). The court‘s finding that the project would cause an “exceedingly small” increase in phosphorus discharge was only one factor supporting the court‘s conclusion. The court also weighed the project‘s compliance with applicable regulations, the ability of the floodplains to retain phosphorus, and available mitigation measures. Based on the evidence presented by both parties’ experts, the court found that the project would discharge a small amount of phosphorus and VTrans planned to implement measures to effectively mitigate some of this discharge.
¶ 22. Vallee does not challenge these findings as erroneous. Instead, Vallee argues that any additional amount of phosphorus discharge represents “an unnecessary increase in impairment” and that all mitigation measures must be employed to find that pollution is not undue. This misstates applicable precedent. It is undisputed that Lake Champlain is impaired for phosphorus. However, the plain language of
¶ 23. We further disagree that the mere possibility of additional mitigation measures, without more, necessarily requires a finding that pollution is undue in this instance. Under Criterion 1, courts may consider, among other factors, “whether effective measures will be taken to reduce the pollution.” N.E. Materials Grp., LLC, 2019 VT 55, ¶ 28. In this case, VTrans provided evidence of a “carefully designed stormwater treatment system” that uses grass channels to remove phosphorus. Vallee‘s expert testified that additional mitigation measures were available but could not quantify the expected reduction in phosphorus load or offer an opinion as to the effect of the reductions. The Environmental Division properly weighed this evidence and determined that VTrans‘s proposal will effectively mitigate phosphorus pollution. Vallee‘s argument provides no grounds to disturb this conclusion.
¶ 24. We next consider Vallee‘s argument that the Environmental Division erroneously found that the project would not cause undue chloride pollution. Vallee first asserts that the court improperly afforded VTrans a presumption of compliance based on the stormwater permit. We disagree. The project‘s stormwater permit vested in regulations that did not include
¶ 25. Vallee next argues that the court improperly shifted the burden of proof to Vallee. However, the court‘s decision shows that it properly assigned the burden of proof to VTrans. The court considered all the evidence presented by VTrans, including the statewide Snow and Ice Control Plan, the project‘s Chloride Management Plan, and “extensive expert testimony.” Based on this evidence, the court concluded that VTrans satisfied its burden. The court then considered Vallee‘s evidence, and concluded that it was insufficient to disturb that conclusion. This reasoning did not erroneously shift the burden of proof to Vallee. In essence, Vallee seeks to revive its argument that any discharge to an impaired water body is categorically undue. For the same reason that this argument failed with phosphorus, it also fails with chloride.
¶ 26. Vallee next contends that the court lacked evidence about the Town of Colchester‘s chloride use and thus could not evaluate the project‘s chloride pollution. The town is responsible for maintaining 0.09 lane miles of the project. The court did not make specific findings about the town‘s chloride application. During the hearing, VTrans tried to admit the town‘s Snow and Ice Removal Plan, but Vallee objected because VTrans provided no witness from the Town to go through the details of the plan, and the court sustained that objection.
¶ 27. However, the court found that the project‘s Chloride Management Plan incorporated by reference the town‘s Snow and Ice Removal Plan, and that the project‘s plan was consistent with the town‘s plan. A VTrans witness testified that the town‘s plan was reasonable and accords with VTrans‘s statewide Snow and Ice Control Plan. VTrans also has a finance and maintenance agreement with the Town of Colchester, which details the town‘s responsibility to perform winter maintenance on its roads. Moreover, the order granting the project‘s Act 250 permit provides that the project must abide by the conditions imposed by the District Commission. Condition 2 requires the project to comply with “the permit application, plans, and exhibits on file with the [DEC] and other material representations,” which includes the Chloride Management Plan. In sum, we conclude that the Environmental Division had a sufficient evidentiary basis to consider the town‘s chloride application. Further, the above evidence belies Vallee‘s claim that the town‘s chloride use is “unregulated.” Based on this evidence, the court did not clearly err in finding that the project will not cause undue water pollution.
¶ 28. Vallee‘s final argument is that the Environmental Division failed to join the Town of Colchester as a necessary co-applicant. Act 250 Rule 10 provides that the record owner of a tract of land shall be a co-applicant, “unless good cause is shown to support waiver of this requirement.” Act 250 Rules, Rule 10(A), Code of Vt. Rules 12 004 060, http://www.lexisnexis.com/hottopics/codeofvtrules. Good cause can include a showing that the applicant “effectively controls” part of the land at issue through an agreement that “allow[s] the imposition of appropriate permit conditions by the District Commission to mitigate adverse impacts under [Act 250].” Id. If the applicant is a state agency with the power to condemn the land, no other parties need be joined. Id. The District Commission may also join a non-record owner if that person‘s property interest “is of such significance, therefore demonstrating a
¶ 29. The District Commission has discretion to join a party as a necessary co-applicant. See In re Pilgrim P‘ship, 153 Vt. 594, 597, 572 A.2d 909, 911 (1990) (finding that Board acted within its discretion to order joinder). In appeals to the Environmental Division, the court “appl[ies] the substantive standards that were applicable before the [District Commission].”
¶ 30. In its order, the Environmental Division reasoned that, as a state agency with the power to condemn, Rule 10(A) permits VTrans to proceed as the sole applicant. The court also determined that the portion of the project controlled by the town is not sufficiently significant to require joinder. The court concluded that VTrans can adequately manage water quality for the project without the Town‘s involvement in the proceedings.
¶ 31. We conclude that the court did not abuse its discretion in denying Vallee‘s motion to join the Town of Colchester, but for a different reason than relied upon by the court. See Caledonian-Record Pub. Co. v. Vt. State Colls., 2003 VT 78, ¶ 7, 175 Vt. 438, 833 A.2d 1273 (affirming trial court‘s decision “based on different reasoning“). The record showed that VTrans effectively controlled the land such that appropriate permit conditions could be imposed on the project. The court found that the project‘s Chloride Management Plan accords with VTrans‘s statewide Snow and Ice Control Plan, and also incorporates the town‘s Snow and Ice Removal Plan by reference. VTrans‘s expert testified that the town‘s plan was reasonable. The project‘s Act 250 permit requires VTrans to perform winter road management in accordance with the Chloride Management Plan. In turn, the finance and management agreement requires the town to
abide by the Chloride Management Plan. As such, the facts demonstrate that the agreement will ensure the town‘s compliance with the permit conditions. The court therefore did not abuse its discretion in not joining the town.
Affirmed.
Chief Justice