CHEEKS OF NORTH AMERICA, INC., Plaintiff, v. FORT MYER CONSTRUCTION CORPORATION, et al., Defendants.
Civil Action No. 10-1746 (CKK).
United States District Court, District of Columbia.
Aug. 16, 2011.
77
COLLEEN KOLLAR-KOTELLY, District Judge.
Walter T. Charlton, Walter T. Charlton & Associates, Woodsboro, MD, for Plaintiff.
Christopher McIntosh Kerns, Fort Myer Construction Corporation, Timothy Joseph Fitzgibbon, Nelson Mullins Riley & Scarborough, David H. Bamberger, Edward S. Scheideman, DLA Piper U.S. LLP, Thomas Louis Koger, Office of the Attorney General, Alex Chintella, Curtis A. Boykin, Frederick Arnold Douglas, Douglas & Boykin PLLC, Washington, DC, Elizabeth D. Horton, Leonard A. White, White & Horton, Bethesda, MD, Douglas Alan Datt, Gavett & Datt, PC, Rockville, MD, Joseph Henry Kasimer, Kasimer & Annino, P.C., Falls Church, VA, for Defendants.
MEMORANDUM OPINION
COLLEEN KOLLAR-KOTELLY, District Judge.
Based on a thorough review of the pleadings, the parties’ briefs, the applicable authorities, and the record as a whole, the Court finds that CNA lacks standing to assert most of the claims asserted in the First Amended Complaint and that where CNA does have standing, CNA has failed to state a claim upon which relief can be granted. The Court also finds that sanctions are not warranted against CNA‘s counsel. Therefore, for the reasons explained below, the Court shall grant the pending motions to dismiss, deny the motion for sanctions, and deny CNA‘s pending motion for discovery as moot.
I. BACKGROUND
The facts set forth in this section are derived from the First Amended Com-
A. The Parties
1. CNA
Plaintiff Cheeks of North America, Inc. (“CNA“) is a District of Columbia corporation with its principal office at Suite 350, 1425 K Street, NW, Washington, DC 20005. First Am. Compl. (“FAC“) ¶ 80. CNA is engaged primarily in specialized purchasing, contracting, infrastructure, and strategic business planning and development. Id. John C. Cheeks (“Cheeks“) is the founder and President of CNA. Id.
2. The Construction Company Defendants
Defendant Fort Myer Construction Corporation (“Fort Myer“) is a Virginia corporation registered to conduct business in the District of Columbia. FAC ¶ 81. During the relevant time period (August 20, 2008 to September 25, 2009), Fort Myer was engaged in infrastructure construction. Id. ¶ 83. Defendant Jose Rodriguez (“Rodriguez“)1 serves as President of Fort Myer; Defendant Francisco R. Neto (“Neto“) serves as Vice President; and Defendant Lewis Shrensky (“Shrensky“) serves as Treasurer and Secretary. Id. ¶ 81. Defendant George Batista (“G. Batista“)2 is an employee of Fort Myer who is involved in pricing contracts for infrastructure services. Id. ¶ 82.
Defendant Anchor Construction Corporation (“Anchor“) is a District of Columbia corporation involved in general construction and contracting. FAC ¶ 85. Defendants Neto and Rodriguez serve on the Board of Directors of Anchor. Id. ¶ 84. Defendants Cristina R. Gregorio (“C. Gregorio“) and Florentino Gregorio (“F. Gregorio“) also served on the Board of Directors of Anchor during the relevant time period. Id.
Defendant Civil Construction, LLC (“Civil“) is a Maryland corporation licensed to conduct business in the District of Columbia that engages in construction work. FAC ¶ 87. Defendants Shrensky and Rodriguez serve on the Board of Directors of Civil. Id. ¶ 86.
Defendant Capitol Paving of D.C., Inc. (“Capitol Paving“) is a District of Columbia corporation engaged in general and specialty construction. FAC ¶ 88. Defendant Neto is the President and Treasurer of Capitol Paving. Id.
Defendant A & M Concrete Corp. (“A & M“) is a Virginia corporation engaged in construction business. FAC ¶ 89. Defendant Joe Alves (“Alves“) is the Executive Vice President of A & M. Id. ¶ 90. Defendant Alexandra Batista (“A. Batista“) is the Administrative Assistant for A & M. Id. ¶ 91. A. Batista is alleged to be related to G. Batista, who is also alleged to work for A & M as a manager. See id. ¶¶ 7, 213.
3. Western Surety
Defendant Western Surety Company (“Western Surety“) is a commercial fidelity surety bond company. FAC ¶ 92. It is a subsidiary of CNA Surety. Id. ¶ 13. Defendant Paul T. Bruflat (“Bruflat“) is a Senior Vice President of Western Surety. Western Surety is alleged to have provided bid bonds for Fort Myer, Anchor, Civil, and Capitol Paving in connection with bids they submitted to WASA and DDOT.
4. Contracting Agency Defendants
Defendant D.C. Water and Sewer Authority (“WASA“) is an independent authority of the District of Columbia that provides water service to the District of Columbia. FAC ¶ 94. Also named as defendants are the WASA Procurement Department, the WASA Board of Directors, and the WASA Retail Services Committee. Id. ¶¶ 95, 98, 99. During the relevant time period, the WASA Procurement Department was engaged in managing water and sewage projects for residential, commercial, governmental, and institutional use in the District of Columbia. Id. ¶ 96. The WASA Board of Directors was engaged in voting on such water and sewage projects. Id. ¶ 98. The WASA Retail Services Committee was responsible for the final voting on contracts for these water and sewage projects. Id. ¶ 100. Defendant Joseph Cotruvo (“Cotruvo“) was a member of the WASA Retail Services Committee. Id. Former WASA General Manager Jerry Johnson and Contract Administrator Carlo Enciso are also named as defendants in this action, as are former or present WASA Board of Directors members William M. Walker (“Walker“) and Neil Albert (“Albert“). Id. ¶¶ 96-97. CNA also references an individual named Avis Russell (“Russell“) in connection with WASA. See FAC at v.
The District of Columbia Department of Public Works (“DPW“) is an agency of the District of Columbia government. The DPW Office of Contracting and Procurement is named as a defendant in this action, as is James Roberts, who served as a contracting officer for DPW. FAC ¶ 102.
Defendant D.C. Department of Transportation (“DDOT“) is also an agency of the D.C. government. FAC ¶ 103. Defendant Jerry M. Carter (“Carter“) served as a Contracting Officer for DDOT during the relevant time period; Defendant Gabe Klein (“Klein“) served as the Director of DDOT during the relevant time period; and Defendant David P. Gragan (“Gragan“) served as the Chief Procurement Officer during the relevant time period. Id.
5. District of Columbia Government Defendants
In addition to the contracting agency defendants listed above, CNA has named a number of D.C. government officials as defendants in this action. These defendants include the Committee on Public Works and Transportation of the Council of the District of Columbia (“Public Works Committee“); its former chairperson, Councilmember Jim Graham (“Councilmember Graham“); his former Chief of Staff, Ted G. Loza (“Loza“); and the committee‘s former legislative and budget director, Steven Hernandez (“Hernandez“). See FAC ¶¶ 104-07. CNA has also named former D.C. Mayor Adrian Fenty (“Fenty“) and the Executive Office of the Mayor as defendants, as well as former D.C. Attorney General Peter Nickles (“Nickles“) and the Office of the Attorney General. Id. ¶¶ 108-11.
CNA has also named the D.C. Department of Small and Local Business Development (“DSLBD“) as a defendant. CNA contends that DSLBD officials endorsed Fort Myer, Anchor, Civil, and Capitol Paving with affirmative action points in connection with bids they submitted for contracts. See FAC ¶ 123. CNA also identifies an individual named Lee Smith (“Smith“) in connection with DSLBD as a defendant in the First Amended Complaint. See FAC at v.
B. CNA Fails to Win Contracts Through Competitive Bidding Processes
The allegations in the First Amended Complaint revolve around six solicitations
1. WASA Contract No. 080020
On August 20, 2008, CNA submitted a bid for the total sum of $11,154,500 in response to WASA‘s Invitation for Bid (“IFB“) No. 080020 (“Replacement of Small Diameter Priority Water Mains for 2008 Construction“). See FAC ¶ 136 & Ex. D.9.1. CNA submitted a bid bond representing 5% of the bid ($557,725) in the form of a company check. Id. ¶ 137 & Exs. D. 7.1 & D. 7.5.5 Anchor, Civil, Fort Myer, and Capitol Paving also submitted bids; CNA alleges that Western Surety issued guaranteed bid bonds on their behalf. Id. ¶¶ 138, 140. WASA procurement officer Carlo Enciso opened the bids on August 20, 2008. Id. ¶ 139. CNA was announced as the lowest bidder; Anchor submitted the next lowest bid. Id. ¶ 141.
On September 9, 2008, Cheeks received a letter from WASA informing him that CNA‘s bid had been declared non-responsive and therefore not eligible for award. Id. ¶ 141 & Ex. H.1.1. The letter stated that “[e]lements considered in this decision were that your bid did not include a completed Bid Bond with sureties or certified check(s) for five percent (5%) of the bid amount.” Id., Ex. H.1.1. The record shows that on the Bid Form submitted with CNA‘s bid, Cheeks checked a box indicating that the bid guaranty would be submitted in the form of a certified check. See id., Ex. D.7.1. The checks that Cheeks submitted for CNA were not certified. See id., D.7.5. Cheeks also filled out a “Bid Bond” form that identified CNA as the principal but did not identify a surety. Id., Ex. D.7.2. CNA filed a bid protest on September 30, 20086 alleging bid rigging, discrimination, and failure to give adequate notice and time to cure. See id., Ex.
On November 6, 2008, the WASA Board of Directors resolved that the contract be awarded to Anchor, the next-lowest bidder. Id. ¶ 143 & Ex. G.1.11.
2. WASA Contract No. 090080
On March 25, 2009, CNA submitted a bid in response to WASA‘s IFB No. 090080 (“Sanitary Sewer Lateral Replacements“). See FAC ¶ 144 & Exs. D.1.10 & D.9.2. According to the bid tabulation sheet, CNA‘s bid was the highest out of seven bidders, including Fort Myer, Civil, Anchor, and Capitol Paving. Id., Ex. D.9.2. The lowest bid was submitted by Corinthian Contractors in the amount of $6,424,140. Id. CNA‘s bid amount was $11,298,320; the other bids submitted were all less than $8 million. Id.
On March 29, 2009, CNA filed a bid protest with WASA indicating that it had made a calculation error in its initial bid and that its actual bid should have been $5,040,000, which would make CNA the lowest bidder. See id., Ex. K.2.1-2. CNA contends that WASA never responded to CNA‘s bid protest and awarded the contract to Corinthian Contractors. Id. ¶ 145.
3. WASA Contract No. 090020
On April 1, 2009, CNA submitted a bid in response to WASA‘s IFB No. 090020 (“Fire Hydrant Replacement Contract 4“). See FAC, Exs. D.7.3-4 & D.9.3. According to the bid tabulation sheet, CNA‘s bid of $2,817,600 was the second lowest received. Id., Ex. D.9.3. The lowest bid was submitted by Nastos Construction, Inc. in the amount of $2,703,160. Id. Fort Myer, Civil, Anchor, and Capitol Paving also submitted bids. Id. WASA ultimately awarded the contract to Nastos Construction, Inc. Id., Ex. D.1.10. CNA‘s bid form indicates that neither a bid bond nor a certified check was provided as a bid guaranty; the “Bid Bond” form submitted by CNA was signed by Cheeks alone and lacked a surety. See id., Ex. D.7.3-4.
4. DDOT Contract No. DCKA-2009-B-0025
On March 18, 2009, CNA submitted a bid in response to DDOT‘s IFB No. DCKA-2009-B-0025 (“Pavement Restoration City-Wide“). See FAC, Exs. D.8.1 & D.10.3. Two days prior to the opening of the sealed bids, on March 16, 2009, Cheeks received an email with information regarding an amendment of the solicitation (“Amendment 6“). Id. ¶ 290. The amendment addressed two issues, one involving insurance requirements and one involving subcontracting requirements from the Office of Local, Small and Disadvantaged Business Enterprise. See id., Ex. D.14.1. CNA alleges that Amendment 6 was engineered by DDOT so as to favor Fort Myer and Capitol Paving in the bidding. Id. ¶¶ 289, 291. CNA had to readjust its bid so as to strategically compete for the contract award. Id. ¶ 292. CNA ultimately submitted a bid in the amount of $54,252,805. Id., Ex. D.10.3. CNA was determined to be the lowest bidder, beating five other bidders including Fort Myer and Capitol Paving. Id.
On May 27, 2009, DDOT Contracting Officer Jerry M. Carter sent CNA a letter indicating that its bid was non-responsive and ineligible for award because CNA had incorrectly submitted five separate, uncer-
5. DDOT Contract No. DCKA-2009-B-0193
CNA submitted a bid in response to DDOT‘S IFB No. DCKA-2009-B-0193 (“Safe Routes to School“). See FAC ¶¶ 130, 149 & Ex. D.11.3. CNA‘s corrected bid was $2,376,095.90. Id., Ex. D.11.3. Fort Myer, Capitol Paving, Civil, Anchor, and A & M also submitted bids. Id. CNA‘s corrected bid was the fourth lowest after those submitted by Anchor, Capitol Paving, and Fort Myer. See id. ¶ 130(v)8 & Ex. D. 1 1.3.9 The contract was awarded to Anchor.
CNA filed a bid protest with the D.C. Contract Appeals Board challenging the award to Anchor. See D.C. Defs.’ Mot. to Dismiss or, in the Alternative, for Summ. J., Ex. 1 (Protest of CNA Corp. Solicitation No. DCKA-2009-B-0193, CAB No. P-0826). The District of Columbia moved to dismiss the bid protest on the grounds that, inter alia, CNA‘s bid was non-responsive because it failed to include proper bid security. See id. at 1. The Contract Appeals Board found that CNA had submitted a “bid bond” in the form of an unsigned letter from a company promising to purchase invoices from CNA upon the completion of performance, and only if the procurement officer verifies that the work has been performed. See id. at 4. The Contract Appeals Board determined that this was not adequate bid security under the procurement regulations and therefore CNA‘s bid was non-responsive. Id. Because CNA was not in line for the award, the Board ruled that CNA lacked standing to raise other challenges to the award. Id.
6. DPW Contract No. DCKT-2009-B-0003
CNA submitted a bid in response to DPW‘s IFB No. DCKT-2009-B-0003 (“On-Site Preventive Maintenance Services“). See FAC ¶ 130 & Ex. D.11.1. CNA was the lowest of three bidders; the other bidders were Fleet Pro and Twilbar & Arnold, Inc. Id., Ex. D.11.1. On December 30, 2008, DPW Contracting Officer James Roberts sent Cheeks a letter asking for more information about CNA‘s bid. See id., Ex. D.19.2-4. The letter explained that DPW was not required to award the contract to the lowest bidder if that bidder is not responsible, and the contracting officer may determine that the bidder is not responsible if there are doubts regarding
C. The Claims Asserted in the First Amended Complaint
The Court begins by noting that the claims and allegations in this action are substantially the same as those raised by Cheeks in a prior action filed pro se in this Court. See Cheeks v. Fort Myer Constr. Corp., 722 F.Supp.2d 93 (D.D.C. 2010). The Court dismissed Cheeks‘s prior lawsuit, holding that Cheeks lacked standing to assert claims that were based on competitive injuries to CNA. See id. CNA has now filed this action seeking recovery for many of the same alleged injuries. Although CNA is represented by counsel (as it must, being a corporate entity), the wording of many of the claims and allegations is largely unchanged from the pro se complaint filed by Cheeks. The First Amended Complaint is a sprawling, prolix document that contains nearly two hundred pages of allegations in 754 separately numbered paragraphs, incorporating by reference over five hundred pages of exhibits that were attached to the initial complaint. Ultimately, CNA‘s claims are outlined in thirteen counts, which the Court shall describe below.
1. Counts One Through Four: Violations of § 1 of the Sherman Act
In Counts One, Two, Three, and Four of the First Amended Complaint, CNA asserts claims under § 1 of the Sherman Act, which provides that “[e]very contract, combination in the form of trust or otherwise, or conspiracy, in restraint of trade or commerce among the several States, or with foreign nations, is declared to be illegal.”
In Count One, CNA alleges that Fort Myer, Anchor, Civil, and Capitol Paving were engaged in a bid-rigging conspiracy in violation of the Sherman Act.10 CNA contends that these four defendants collusively submitted bids for contracts so as to make the winning bid appear competitive and reasonable. See FAC ¶ 159. “[C]onspiracies to submit collusive, noncompetitive, rigged bids ... are per se violations of the Sherman Act.” United States v. Rose, 449 F.3d 627, 630 (5th Cir. 2006) (internal citations omitted). CNA does not allege any specific facts that indicate an agreement among these defendants. Rather, CNA alleges that these companies shared directors and managers and therefore had common and overlapping interests. See FAC ¶¶ 5-7, 9, 30-31, 43, 67, 162-67, 171. CNA contends that these defendants’ collusive bidding prevented CNA from winning the contracts described above.11 CNA seeks damages from Fort
Myer, Anchor, Civil and Capitol Paving in the amount of $582,175,180.80. Id. ¶ 177.
Count Two asserts a claim against Western Surety. CNA alleges that Western Surety issued bid bonds to Fort Myer, Anchor, Civil, and Capitol Paving in connection with the contract solicitations and that therefore Western Surety should have known that these companies were colluding and had interlocking directorates. Id. ¶¶ 184-85. CNA alleges that “but for the intentional failure of [Western Surety] to recognize violations of federal law, none of the surety bonds would have issued, and consequently, none of the contracts would have been awarded to the conspiring and affiliated contractors.” Id. ¶ 188. CNA prays for damages from Western Surety in the amount of $91,900,488.70. Id. ¶ 197.
Count Three asserts a claim against Fort Myer, Anchor, Civil, Capitol Paving, A & M, WASA (and its Board of Directors and Retail Services Committee), the District of Columbia (including DDOT and its Office of Contracting and Procurement), the Public Works Committee, and Alves and A. Batista in their personal capacities. See FAC at 50. With respect to the Fort Myer, Anchor, Civil, and Capitol Paving, the claims in Count Three appear to be identical to those raised in Count One. Count Three alleges that A & M was also a part of the alleged bid-rigging conspiracy and seeks damages in the amount of $500,000 from A & M and $100,000 from G. Batista (who is not explicitly named as a defendant for Count Three). Id. ¶ 213. CNA alleges that WASA and the District of Columbia became a part of the alleged conspiracy by “violat[ing] a myriad of duties to control the actions of [their] own agents, officials, and boards.” Id. ¶¶ 203-04. CNA claims that WASA and DDOT accepted bids from the defendant construction companies when it had knowledge that they shared common ownership. Id. ¶¶ 208-09. CNA contends that employees of WASA and DDOT should have known that the entire bidding process would be voided by the alleged conspiracy. Id. ¶ 209. Although they are named as defendants for Count Three, there are no specific allegations pertaining to Defendants Alves and A. Batista. CNA concedes in its opposition brief that it has failed to allege any facts pertaining to Alves and agrees that Alves may be dismissed as a defendant. See Pl.‘s Opp‘n to Defs. A & M, Alves & A. Batista‘s Mot. to Dismiss at 1.
Count Four asserts a claim for “price fixing” against Fort Myer, Anchor, Civil, and Capitol Paving in violation of § 1 of the Sherman Act.12 CNA alleges that these companies determined in advance what prices to use in the bids that were submitted to WASA and DDOT. See FAC ¶ 220. CNA further alleges that the companies arranged their bids so as to completely cover the range of bidding with the apparent intent to exclude competition. Id. ¶ 226. The Court understands this claim to be essentially duplicative of the claim in Count One.
The Court notes that in paragraph 30 of the First Amended Complaint, CNA makes reference to § 8 of the Clayton Act,
2. Counts Five and Six: Monopoly in Violation of § 2 of the Sherman Act
In Counts Five and Six of the First Amended Complaint, CNA purports to assert claims for unlawful monopolization under § 2 of the Sherman Act,
In Count Five, CNA generally reasserts its claims regarding the bid-rigging conspiracy and alleges that Fort Myer, Anchor, Civil, and Capitol Paving “have achieved a near total monopoly of infrastructure contracts in the District of Columbia.” FAC ¶ 239. CNA contends that these companies achieved this monopoly power through their bid-rigging conspiracy. Id. ¶ 240. In Count Six, CNA asserts claims against the four construction companies along with Defendants Neto, Rodriguez, Shrensky, F. Gregorio, C. Gregorio, and the District of Columbia government. See id. at 67. CNA alleges that the individual defendants named actively participated in the unlawful monopolization. Id. ¶ 263. CNA further alleges that District of Columbia government employees gave preferential treatment to the defendant contracting companies in connection with the contract solicitations. Id. ¶ 264. CNA contends that it is entitled to damages in Counts Five and Six relating to its loss of the contracts during the bid solicitations at issue. See id. ¶¶ 267-71.
3. Count Seven: Contract Steering
In Count Seven, which is captioned “Contract Steering,” CNA names as defendants the District of Columbia, Fenty, Gragan, Carter, Klein, WASA, Carlo Enciso, and Jerry Johnson. See FAC at 77. CNA alleges that these individuals were involved in contract steering and that they
4. Count Eight: Violation of Non-Collusion Affidavit
In Count Eight, CNA appears to claim that various defendants violated solicitation rules by falsely signing non-collusion affidavits in connection with their bids for contracts. See FAC ¶¶ 314, 316. The named defendants in this count are Fort Myer, Anchor, Civil, Capitol Paving, Neto, Rodriguez, Shrensky, F. Gregorio, C. Gregorio, Western Surety, Bruflat, WASA, Johnson, A & M, Alves, and A. Batista. See FAC at 84-85.
5. Count Nine: Violation of D.C. Code § 28-4502
In Count Nine, CNA asserts a claim under
6. Count Ten: Violations of Procurement Regulations
In Count Ten, CNA alleges that WASA and its defendant officials Johnson and Enciso violated WASA procurement regulations by failing to notify CNA of mistakes in its bids and allowing CNA time to cure them. See FAC ¶¶ 346-47. CNA contends that the procurement regulations required the contracting officer to allow CNA to correct mistakes in its bids after they were submitted. Id. ¶¶ 349-54.
7. Counts Eleven and Twelve: Common Law Fraud & Oversight Failure
Count Eleven of the First Amended Complaint purports to assert a claim for fraud against Fort Myer, Anchor, Civil, Capitol Paving, Western Surety, Neto, Rodriguez, Shrensky, F. Gregorio, C. Gregorio, Bruflat, the District of Columbia, Nickles, Gragan, Carter, WASA (and its Board of Directors and Retail Services Committee), Johnson, Councilmember Graham, Loza, Hernandez, and the DSLBD.14 See FAC at 100-01. CNA
Count Twelve asserts a claim against Fort Myer, Anchor, Civil, Capitol Paving, Neto, Rodriguez, Shrensky, F. Gregorio, C. Gregorio, the District of Columbia, Nickles, WASA, the members of the Public Works Committee, Councilmember Graham, Hernandez, and Fenty. Id. ¶¶ 537-557. Count Twelve is captioned, “Oversight Failure, Gross Negligence and Fraud of Governance Boards, Corporate Boards and the District of Columbia Government.” CNA generally alleges that D.C. government and WASA officials enabled the bid-rigging conspiracy by failing to engage in effective oversight and through gross negligence. Id. ¶¶ 566-67.
8. Count Thirteen: Tortious Interference with Business Relationships
In Count Thirteen, CNA asserts a claim against Fort Myer, Anchor, Rodriguez, WASA, DDOT, Western Surety, and Bruflat for tortious interference with business relationships and with contracts. FAC at 162. CNA alleges that the actions of the defendant construction companies blocked CNA‘s entry into the market for infrastructure contracts, causing CNA to be unable to pay its debtors. Id. ¶ 605. CNA further alleges that these companies spread false information that CNA owed a debt to Fort Myer (although CNA concedes it owed $56.00 to Fort Myer) in order to ruin CNA‘s reputation. Id. ¶¶ 606-07.
D. Procedural Background
CNA filed this action on October 15, 2010. CNA filed its First Amended Complaint on November 9, 2010. On November 19, 2010, Defendants A & M, Alves, and A. Batista filed a [28] Motion to Dismiss Pursuant to
On January 24, 2011, Defendants A & M, Alves, and A. Batista filed a [63] Motion for Sanctions Against Plaintiff and Its Counsel pursuant to
On March 1, 2011, Defendant F. Gregorio filed a [72] Second Motion to Quash Service claiming that he had not been validly served with process pursuant to Rule 4. CNA filed an opposition to this motion, and F. Gregorio filed a reply.
On March 17, 2011, CNA filed a [85] Motion for Voluntary Dismissal of Claims Against Two Individual Defendants Without Prejudice with respect to Defendants Roberts and C. Gregorio. Defendant Roberts filed an opposition to CNA‘s motion, arguing that the Court should proceed to rule on his pending motion to dismiss. The Court agrees that it is appropriate to rule on the pending motions to dismiss rather than allow CNA to voluntarily dismiss these defendants without prejudice. Accordingly, the Court shall deny CNA‘s motion without prejudice.
On May 30, 2011, CNA filed a [89] Motion for Leave to Take One Deposition to Preserve Evidence. The motion seeks permission to take the deposition of Defendant Loza prior to the Rule 26(f) confer-
ence. Defendant Loza and the District of Columbia defendants filed an opposition and [96] cross-motion for protective order to preclude the deposition. Defendants argue that Loza enjoys legislative immunity and cannot be compelled to testify; furthermore, they argue that his testimony is unnecessary because the First Amended Complaint fails to state a claim upon which relief can be granted. These motions have been fully briefed and are ripe for resolution.
II. LEGAL STANDARD
The defendants move to dismiss the First Amended Complaint in part for lack of subject matter jurisdiction based on a lack of standing and in part for failure to state claim upon which relief can be granted.
A. Motion to Dismiss Pursuant to Federal Rule of Civil Procedure 12(b)(1)
A court must dismiss a case pursuant to Rule 12(b)(1) when it lacks subject matter jurisdiction. In determining whether there is jurisdiction, the Court may “consider the complaint supplemented by undisputed facts evidenced in the record, or the complaint supplemented by undisputed facts plus the court‘s resolution of disputed facts.” Coalition for Underground Expansion v. Mineta, 333 F.3d 193, 198 (D.C.Cir.2003) (citations omitted); see also Jerome Stevens Pharm., Inc. v. Food & Drug Admin., 402 F.3d 1249, 1253 (D.C.Cir.2005) (“[T]he district court may consider materials outside the pleadings in deciding whether to grant a motion to dismiss for lack of jurisdiction.“). “At the
B. Motion to Dismiss Pursuant to Federal Rule of Civil Procedure 12(b)(6)
Under the Federal Rules of Civil Procedure, a complaint must contain “a short and plain statement of the claim showing that the pleader is entitled to relief,”
When considering a motion to dismiss for failure to state a claim, the court must construe the complaint in a light most favorable to the plaintiff and must accept as true all reasonable factual inferences drawn from well-pleaded factual allegations. In re United Mine Workers of Am. Employee Benefit Plans Litig., 854 F.Supp. 914, 915 (D.D.C.1994); see also Schuler v. United States, 617 F.2d 605, 608 (D.C.Cir.1979) (“The complaint must be liberally construed in favor of the plaintiff, who must be granted the benefit of all inferences that can be derived from the facts alleged“) (internal quotation omitted). However, a plaintiff must provide more than just “a sheer possibility that a defendant has acted unlawfully.” Iqbal, 129 S.Ct. at 1950. When a complaint‘s well-pleaded facts do not enable a court, “draw[ing] on its judicial experience and common sense,” “to infer more than the mere possibility of misconduct,” the complaint has not shown that the pleader is entitled to relief. Id.
III. DISCUSSION
The defendants in this action have moved to dismiss the First Amended Complaint on a variety of grounds. Many of
A. CNA Lacks Standing to Assert Most of Its Claims
To establish the “irreducible constitutional minimum of standing,” a plaintiff must show: (1) that he or she suffered an injury in fact that is (a) concrete and particularized and (b) actual or imminent; (2) a causal relationship between the injury and the challenged conduct; and (3) that the injury will likely be remedied by a favorable court decision. Lujan v. Defenders of Wildlife, 504 U.S. 555, 560-61, 112 S.Ct. 2130, 119 L.Ed.2d 351 (1992). In this case, it is the second prong of the standing inquiry—causation—that poses a problem for CNA. Nearly all of the claims asserted in the First Amended Complaint seek redress for CNA‘s failure to obtain a final contract through the six challenged solicitations. However, the facts as pled in the First Amended Complaint and supporting exhibits reveal that CNA lost the contracts because of its own mistakes in the bidding process or because it was outbid by companies that are not alleged to be a part of the bid-rigging conspiracy. The Court shall review the facts relating to each contract solicitation to explain why CNA lacks standing to assert claims based on these injuries.
1. Contracts for Which CNA‘s Bid Was Deemed Non-responsive
With respect to both WASA Contract No. 080020 and DDOT Contract No. DCKA-2009-B-0025, CNA was initially deemed the winning bidder but its bid was rejected as non-responsive because it failed to include the required bid security. With respect to DPW Contract No. DCKT2009-B-0003, the record shows that DPW declined to award CNA the contract despite being the lowest bidder because CNA did not establish that it was a responsible bidder in response to DPW‘s request for documentation. Therefore, with respect to these contract awards, CNA‘s injury was not caused by any alleged anti-competitive conduct among CNA‘s competitors, but rather by CNA‘s own failure to comply with the bidding requirements.16 Consequently, CNA has no standing to assert claims that his competitors were engaged in a bid-rigging conspiracy with respect to these contracts.
CNA does have standing to challenge the actions of the contracting officers and agencies in deeming its bids non-respon-
2. Contract Lost Due to CNA‘s Own Bidding Error
With respect to WASA Contract No. 090080, CNA admits that it lost the bid because it was the highest bidder due to CNA‘s own error in submitting its bid. Therefore, CNA‘s failure to win the contract was not the result of any alleged bid-rigging conspiracy, and CNA lacks standing to assert any such claim based on this contract solicitation. CNA does contend that it filed a bid protest seeking to correct
its error and that WASA failed to respond to it. CNA does have standing to challenge WASA‘s failure to respond, but this is a separate claim from CNA‘s antitrust claims.
3. Contracts Where CNA Was Not the Lowest Bidder
a. WASA Contract No. 090020
With respect to WASA Contract No. 090020, CNA alleges that the contract was awarded to Nastos Construction, Inc. (“Nastos“), the lowest bidder. CNA makes only three references to Nastos throughout its entire First Amended Complaint. See FAC ¶¶ 146, 243, 585. These references indicate only that Nastos submitted the lowest bid and that it was awarded the contract. In one paragraph, CNA writes in parentheses that Nastos is “(Other [company] in question), see id. ¶ 243; and in another paragraph, CNA marks Nastos with a double asterisk and a note stating ‘Others affiliated with Defendants,” id. ¶ 146. To the extent that these minor notations are intended to imply that Nastos was conspiring with the other alleged conspirators, they are wholly inadequate. Alleging that Nastos was “in question” or “affiliated” with the defendant companies is not the same as alleging that Nastos was involved in the conspiracy. Without a competent allegation that Nastos was somehow involved in the conspiracy, however, CNA cannot establish that it lost WASA Contract No. 090020 as a result of any anticompetitive conduct. Accordingly, CNA lacks standing to assert any of its claims based on the loss of WASA Contract No. 090020 to Nastos.
b. DDOT Contract No. DCKA-2009-B-0193
The record shows that CNA was the fourth lowest bidder for DDOT Contract No. DCKA-2009-B-0193 behind Fort Myer, Anchor, and Civil. See FAC ¶ 130(v) & Ex. D.11.3. Because these three companies are alleged to have participated in the bid-rigging conspiracy, CNA may have standing to sue as a disappointed bidder if it can establish that it may have been awarded the contract in the absence of the bid-rigging conspiracy. Cf. Free Air Corp. v. FCC, 130 F.3d 447, 450 (D.C.Cir.1997) (“[S]ufficiently viable runners-up in a procurement process have standing to allege that an illegality in the process caused the contract to go to someone else and not to them.“); Nat‘l Maritime Union of Am. v. Commander, Military Sealift Command, 824 F.2d 1228, 1237-38 (D.C.Cir.1987) (“[I]njury to a bidder‘s right to a fair procurement is obviously an injury both traceable to the alleged illegality in a procurement and redressable by any remedy that eliminates the alleged illegality.“). Assuming arguen-do that the bids submitted by Fort Myer, Anchor, and Civil would have been higher than CNA‘s bid absent any collusion, CNA could ordinarily establish standing by being the next lowest bidder. However, the Contract Appeals Board ruled that CNA‘s bid was non-responsive because it failed to include the required bid security. Therefore, CNA could not have been awarded the contract even if it had been the lowest bidder. Accordingly, CNA lacks standing to assert claims based on its failure to win this contract.
4. Conclusion
Because the record clearly demonstrates that CNA‘s failure to win the six contracts described in the First Amended Complaint was not caused by any alleged bid-rigging conspiracy, CNA lacks standing to assert any claims that are premised on the alleged conspiracy. These claims include: Counts One, Two, Three, and Four, which charge that the various named defendants violated § 1 of the Sherman Act by engaging in the alleged bid-rigging conspiracy; Counts Five and Six, which charge that the bid-rigging conspiracy enabled defendants to monopolize the market for infrastructure contracts in violation of § 2 of the Sherman Act; and Count Nine, which charges that the bid-rigging conspiracy violates D.C.‘s antitrust statute. Each of these counts seeks to hold defendants directly liable for engaging in anticompetitive conduct, but because CNA cannot demonstrate that it was actually harmed by any such conduct, it lacks standing to assert these claims. Therefore, the Court shall dismiss these claims for lack of subject matter jurisdiction.
Several other claims asserted in the First Amended Complaint also fail for lack of standing. In Count Eight, CNA charges that the defendants violated solicitation rules by falsely submitting affidavits of non-collusion. Even assuming that there is a private right of action for such a claim, CNA lacks standing to assert it because it cannot demonstrate that its injury—its failure to win the contract awards—is traceable to the allegedly false affidavits. In Count Twelve, CNA charges that various procurement officials were negligent in failing to stop the alleged bid-rigging conspiracy. However, CNA cannot demonstrate that such alleged negligence played any causal role in its failure to win a contract. Therefore, these claims must also be dismissed for lack of standing.
Count Eleven purports to assert a claim for common law fraud against a series of defendants. However, it is clear from CNA‘s allegations that its fraud claim is based on the defendants’ alleged participation in the bid-rigging conspiracy in
It appears to the Court that Counts Seven, Ten, and Thirteen rely at least in part on factual allegations that are distinct from the allegations of a bid-rigging conspiracy. Therefore, the Court shall proceed to analyze the merits of those claims. Because the Court shall dismiss the other counts for lack of standing, the Court declines to reach the alternative arguments in favor of dismissal raised by the various defendants.
B. CNA Has Failed to State a Claim for Contract Steering
In Count Seven, CNA purports to assert a claim against District of Columbia and WASA officials for “contract steering.” The basis for CNA‘s claim is not entirely clear. In its opposition brief, CNA states that its contract steering claim is based on “systemic corruption amongst the individuals, agencies, and corporations that control the IFB Solicitations market.” See CNA‘s [70] Opp‘n to D.C. Defs.’ Mot. to Dismiss or, Alternatively, for Summ. J. at 14. To the extent that CNA is alleging that these officials steered contracts to the defendant contract companies through actions such as the allegedly preferential Amendment 6, see FAC ¶¶ 289-95, CNA lacks standing to assert these claims because it cannot demonstrate that its injuries were caused by the alleged contract steering rather than by its own actions or inactions. To the extent that CNA is claiming that these defendants violated procurement regulations, see id. ¶ 296, its claim is duplicative of Count Ten, which the Court shall address below.
CNA also appears to claim in Count Seven that the defendant officials violated
C. CNA‘s Claims Based on Violations of Procurement Regulations
As the Court noted above, CNA does have standing to challenge violations of procurement regulations by contracting officials to the extent that those violations can be shown to have a causal connection to CNA‘s failure to win the contract. In this case, CNA contends that the WASA contracting officials violated procurement regulations by failing to notify CNA that its bids were deficient and failing to allow CNA to correct the deficiencies. However, a review of the relevant regulations reveals that the WASA contracting officials did not violate the procurement regulations in rejecting CNA‘s bids as non-responsive.
CNA relies primarily on a procurement regulation then in effect captioned, “Mistakes in Bids Before Award.” See 21 D.C. Mun. Reg. § 5312 (1999).18 That regulation provided in pertinent part as follows:
5312.1 Contracting Officer shall examine each bid for mistakes. In cases where the Contracting Officer has reason to believe that a mistake is contained within a bid/proposal, the Contracting Officer shall request from the bidder/proposer verification of the mistake.
5312.2 The Contracting Officer may correct an apparent clerical mistake before award. If the correction is made, the bid shall be corrected to the intended correct bid and may not be withdrawn.
5312.3 A Contracting Officer‘s authority to permit corrections of bids is
limited to bids that are responsive and shall not be used to permit corrections to make the bid responsive or competitive.
Id. CNA also relies on a regulation captioned, “Mistakes in Bids After Award,” which provided in pertinent part:
5313.1 If a mistake in a bid or proposal is not discovered until after award, the Contracting Officer may correct the mistake by contract amendment if the Contracting Officer makes a written determination that correcting the mistake would be in the best interest of WASA and that the correction would not change the essential requirements of the contract.
Id. § 5313. CNA contends that pursuant to these provisions, WASA contracting officials should have examined CNA‘s bids, notified CNA of its failure to provide proper bid security, and allowed CNA to correct the mistake. However, the language in these regulations is permissive rather than mandatory, meaning that the Contracting Officer is not required to correct a mistaken bid. Furthermore, § 5312 clearly states that the Contracting Officer cannot permit corrections to make the bid responsive or competitive. The regulations then in effect stated that “[t]o be considered for award, a bid shall be required to comply in all material respects with the solicitation,” id. § 5310.1, and “[a] Contracting Officer shall reject bids and proposals determined by the Contracting Officer to be non-responsive,” id. § 5318.7. Because the solicitations at issue required bid security, CNA‘s failure to include proper bid security rendered its bids non-responsive, and the Contracting Officer could
CNA also relies on a regulation that provided, “A Contracting Officer shall give the successful bidder/proposer an opportunity to resolve minor deficiencies in bids and proposals prior to the award.” 21 D.C. Mun. Regs. § 5321.1 (1999). However, the lack of proper bid security is not a “minor” deficiency in a bid. The applicable regulations explicitly stated that a “Contracting Officer may reject bids and proposals that do not include security required to be submitted with the bid/proposal unless the failure to include the security is waived by the General Manager.” Id. § 5318.9. Therefore, CNA‘s claim that WASA officials violated procurement regulations by denying CNA the opportunity to correct its deficient bid security is without merit.
CNA also appears to claim that WASA improperly failed to respond to its bid protest regarding WASA Contract No. 90080, where CNA mistakenly submitted a bid for over $11 million instead of its intended bid of $5,040,000. However, as discussed above, the applicable procurement regulations would not have required the WASA Contracting Officer to accept CNA‘s corrected bid. Therefore, any failure to respond to CNA‘s bid protest was harmless and did not cause CNA any injury.
For these reasons, the Court shall grant the WASA Defendants’ motion to dismiss Count Ten of the First Amended Complaint.
D. CNA Has Failed to State a Claim for Tortious Interference with Business Relationships or with Contract
In Count Thirteen of the First Amended Complaint, CNA purports to assert claims for tortious interference with business relationships and tortious interference with contract. To survive a motion to dismiss on a claim for tortious interference with a business relationship or a contract, the plaintiff must plead: (1) the existence of a valid business relationship or contract; (2) knowledge of the business relationship or contract on the part of the tortfeasor; (3) intentional interference inducing or causing a breach of the relationship or contract; and (4) damages resulting from the breach. Browning v. Clinton, 292 F.3d 235, 242 (D.C.Cir.2002); CASCO Marina Dev., L.L.C. v. D.C. Redev. Land Agency, 834 A.2d 77, 83 (D.C. 2003).
The First Amended Complaint alleges the following facts in support of CNA‘s tortious interference claims. CNA alleges that Fort Myer, Anchor, Civil, and Capitol Paving spread false information about CNA‘s debts to creditors with the aim of tarnishing CNA‘s reputation in the marketplace. See FAC ¶¶ 606-10. CNA claims that these defendants’ actions “destroyed good will intentions of [CNA] in fulfilling agreements to its debtor(s).” Id. ¶ 613. CNA lists liabilities to debtors in the amount of $2,029,352. Id. ¶ 614. CNA claims that it defaulted on some of its obligations to the debtors as a result of defendants’ actions. See id. ¶ 618. CNA also complains that Fort Myer took aggressive actions to collect an unpaid debt and then complained about CNA‘s delinquency to DDOT and WASA. See id. ¶¶ 619-20.
The Court finds that CNA has failed to state a claim for tortious interference with business relationships or contracts. First, CNA fails to allege that any of the defendants in this count had any knowledge of CNA‘s business relationships or contracts. Second, CNA has failed to plead facts that plausibly suggest that it suffered damages resulting from any alleged interference. CNA‘s basic claim is that it was injured
Furthermore, insofar as CNA asserts its claim against the District of Columbia, the claim is barred by CNA‘s non-compliance with
For these reasons, the Court shall dismiss Count Thirteen of the First Amended Complaint.
E. Other Pending Motions
Having concluded that all of the claims asserted by CNA in the First Amended Complaint must be dismissed for either lack of standing or failure to state a claim upon which relief can be granted, the Court must now address the other motions pending on the docket. Defendants Shrensky, Rodriguez, and G. Batista filed a [49] Motion to Quash Service of Process, which the Court treats as a motion to dismiss lack of insufficient service of process pursuant to
Also pending before the Court is CNA‘s [89] Motion for Leave to Take One Deposition to Preserve Evidence and a [96] cross-motion for protective order filed by Defendants Loza and the District of Columbia Defendants. The Court‘s disposition of the defendants’ motions to dismiss renders these cross-motions moot; therefore, the Court shall deny them.
Finally, the Court must address the [63] Motion for Sanctions Against Plaintiff and Its Counsel filed by Defendants A & M, Alves, and A. Batista. These defendants seeks sanctions against CNA and its counsel under
Defendants A & M, Alves, and A. Batista contend that CNA and its counsel have violated Rule 11 by asserting claims against them in the First Amended Complaint that are legally and factually unsupported and which they believe are being asserted for the improper purpose of harassment. They point to the lack of factual allegations pertaining to A & M, Alves, and A. Batista in the First Amended Complaint and the lack of monetary relief sought against them. Accordingly, the Court shall review the facts alleged in the First Amended Complaint regarding each of these defendants.
With respect to A & M, the First Amended Complaint does clearly allege that A & M was a part of the overall bid-rigging conspiracy along with Fort Myer, Civil, Anchor, and Capitol Paving. See FAC ¶¶ 4-12. CNA has alleged facts demonstrating that A & M participated in several of the bid solicitations and has alleged that A & M had connections to at least one of the other companies through shared officers. A & M contends that sanctions are warranted, however, because there are no specific factual allegations describing A & M‘s involvement in the alleged conspiracy. The Court certainly agrees that the First Amended Complaint is not a model of clarity; it is repetitious, longwinded, rambling, and replete with conclusory allegations of conspiracy. Indeed, if the Court were not dismissing CNA‘s claims for lack of standing, it would likely dismiss the claims for failure to plead facts that plausibly show an entitlement to relief. However, the Court shall not award sanctions under Rule 11 simply because CNA‘s counsel filed a pleading that is poorly worded and fails to state a claim for relief. See Tahfs v. Proctor, 316 F.3d 584, 595 (6th Cir.2003) (“A complaint does not merit sanctions under Rule 11 simply because it merits dismissal pursuant to Rule 12(b)(6).“).
Defendants Alves and A. Batista have a more tenable argument for sanctions. Although they are both named as defendants in the First Amended Complaint, the only factual allegations pertaining to them in the entire pleading are in paragraph 90, where CNA alleges that Alves is the Executive Vice President of A & M; paragraph 91, where CNA alleges that A. Batista is the Administrative Assistant of A & M; and paragraph 7, where CNA alleges that A. Batista is related by blood or marriage to G. Batista. CNA has conceded that it failed to allege any facts pertaining to Alves and concedes that dismissal is appropriate with respect to him. See Pl.‘s Opp‘n to Defs. A & M, Alves & A. Batista‘s Mot. to Dismiss at 1. Although CNA has not made a similar concession with respect to A. Batista, it is clear that there are no allegations against A. Batista that could support a claim against her. CNA argues that it could not plead specific facts relat-
IV. CONCLUSION
For the foregoing reasons, the Court finds that CNA lacks standing to assert its claims involving an alleged bid-rigging conspiracy because it cannot demonstrate a causal connection between the alleged conspiracy and its failure to win infrastructure contracts awarded by DDOT, DPW, and WASA. The Court also finds that CNA has failed to state a claim against the contracting officers or agencies for violation of procurement regulations and has failed to state a claim for tortious interference with a business relationship or contract. Accordingly, the Court shall grant the pending motions to dismiss pursuant to
COLLEEN KOLLAR-KOTELLY
UNITED STATES DISTRICT JUDGE