DENNIS R. BOUCK v. KANSAS CITY SOUTHERN RAILWAY CO., ET AL.
CIVIL ACTION NO. 20-1298
UNITED STATES DISTRICT COURT WESTERN DISTRICT OF LOUISIANA SHREVEPORT DIVISION
November 10, 2021
JUDGE ELIZABETH E. FOOTE; MAGISTRATE JUDGE HORNSBY
Case 5:20-cv-01298-EEF-MLH Document 76 Filed 11/10/21 Page 1 of 8 PageID #: 760
MEMORANDUM RULING
Before the Court is a partial motion for summary judgment, filed by Defendant, Kansas City Southern Railway Company (“KCSR“). The motion has been fully briefed. For the reasons below, the motion [Record Document 53] is DENIED.
BACKGROUND
Plaintiff, Dennis Bouck (“Plaintiff“), worked for KCSR in the railroad industry from approximately 1964 to 2007. Record Document 1.1 During this time, he avers that he worked on locomotives and various parts of locomotives that contained asbestos. In 2020, Plaintiff alleges that he was diagnosed with mesothelioma, a terminal disеase from his work exposing him to asbestos dust. Plaintiff filed suit against his employer, KCSR, and various manufacturers of the asbestos-containing products, Progress Rail Locomotive Inc., Wabtec Transportation Systems, LLC, and Comet Industries, Inc. (collectively, the “Manufacturеrs“), claiming that Defendants were liable for the dangerous levels of asbestos that he was exposed to while working on locomotives and locomotive parts. As to KCSR, Plaintiff has brought a negligence claim pursuant to the Federal Employers’ Liability Act (“FELA“). Plaintiff сontends that KCSR failed to provide him with a reasonably safe workplace by allowing him to work with asbestos-containing materials without
Previously, the Court dismissed the Mаnufacturers of the asbestos-containing products based on the United States Supreme Court decision Kurns v. Railroad Friction Products Corp., 565 U.S. 625 (2012), which held that state law defective design and failure-to-warn claims asserted by a worker, who had contracted mesothelioma from exposure to asbestos while working on locomotives and locomotive parts, against product manufacturers were preempted by the Locomotive Inspection Act (“LIA“). Record Documents 37 & 40. Now, KCSR has filed a partial motion for summary judgment arguing that the LIA preсludes Plaintiff‘s FELA claims against KCSR to the extent they arise “from the use of [asbestos-containing] parts.” Record Document 53-1 at 10-11.
SUMMARY JUDGMENT STANDARD
If the movant satisfies its initial burden of showing that there is no genuine dispute of material fact, the non-movant must demonstrate that there is, in fact, a genuine issue for trial by going “beyond the pleadings and designat[ing] specific facts” for support. Little v. Liquid Air Corp., 37 F.3d 1069, 1075 (5th Cir. 1994) (citing Celotex, 477 U.S. at 325). “This burden is not satisfied with some metaphysical doubt as to the material facts,” by conclusory or unsubstantiated allegations, or by a mere “scintilla of evidence.” Id. (internal quotation marks and citations omitted). However, “[t]he evidence of the non-movant is to be believed, and all justifiable inferences are to be drawn in his favor.” Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 255 (1985) (citing Adickes v. S. H. Kress & Co., 398 U.S. 144, 158-59 (1970)). While not weighing the evidence or evaluating the credibility of witnesses, courts should grant summary judgment where the critical evidence in support of the non-movant is so “weak or tenuous” that it could not support a judgment in the non-movant‘s favоr. Armstrong v. City of Dallas, 997 F.2d 62, 67 (5th Cir. 1993).
Additionally, Local Rule 56.1 requires the movant to file a statement of material facts as to which it “contends there is no genuine issue to be tried.” The opposing party must then set forth a “short and concise statement of the material facts as to which therе exists a genuine issue to be tried.” W.D. La. R. 56.2. All material facts set forth in the movant‘s statement “will be deemed admitted, for purposes of the motion, unless controverted as required by this rule.” Id.
LAW & ANALYSIS
I. FELA and LIA
“Section 1 of the FELA renders common carrier railroads ‘liable in damages to аny person suffering injury while . . . employed by [the] carrier’ if the ‘injury or death result[ed] in whole or in part from the [carrier‘s] negligence.‘” Norfolk & W. Ry. Co. v. Ayers, 538 U.S. 135, 144-45 (2003) (quoting
The LIA and its predecessor, the Boiler Inspection Act (“BIA“), “supplement[] the [FELA] by imposing on interstate railroads an absolute and сontinuing duty to provide safe equipment.” Urie v. Thompson, 337 U.S. 163, 188 (1949) (internal quotation marks and citations omitted). The BIA and LIA are “substantively if not in form amendments to the [FELA].” Id. at 189. The LIA provides:
A railroad carrier may use or allow to be used a locomotive or tender on its railroad line only when the locomоtive or tender and its parts and appurtenances—
(1) are in proper condition and safe to operate without unnecessary danger of personal injury;
(2) have been inspected as required under this chapter and regulations prescribed by the Secretary of Transportation under this chapter; and
(3) can withstand every test prescribed by the Secretary under this chapter.
Although the LIA does not have an express preemption provision, the Supreme Court has held that Congress intended to “occupy the field” when regulating locomotives and locomotive parts. Napier v. Atlantic Coast Line R.R., 272 U.S. 605, 613 (1926). In Kurns, the Supreme Court
The parties do not disputе that Plaintiff‘s state law claims against the Manufacturers of the asbestos-containing rail products were properly dismissed because of federal preemption as stated in Kurns. KCSR‘s instant motion attempts to expand the Supreme Court‘s ruling in Kurns to Plaintiff‘s FELA claims against KCSR. Record Document 53-1 at 11-15. KCSR contends that Plaintiff‘s FELA claims for alleged asbestos exposure should be dismissed under Kurns because the LIA occupies the entire field regarding locomotive parts and precludes any FELA claims related to asbestos expоsure arising from work on locomotives and locomotive parts. Id. Implicit in KCSR‘s interpretation of Kurns is the position that a long-term employee, such as Plaintiff, should be left without any available remedy for prolonged asbestos exposure arising from work on locomotives and locоmotive parts.2
KCSR, however, has pointed the Court to no controlling authority interpreting Kurns in a manner that completely forecloses a railroad worker‘s ability to seek redress for asbestos exposure when the exposure derives from work on locomotives and locomotive parts. Kurns says nothing about the LIA having preclusive effect over FELA claims. The Supreme Court in Kurns was
Moreover, KCSR is not in thе same position as the product Manufacturers who were previously dismissed. Plaintiff did not have a FELA claim available against the Manufacturers. Plaintiff‘s claims against KCSR relate to KCSR‘s alleged failure to provide Plaintiff with a reasonably safe workplacе by subjecting him to prolonged asbestos exposure without proper warnings, testing, safety equipment, or training. The LIA did not eliminate the employer‘s duty to ensure a reasonably safe workplace. The potential harm from prolonged asbestos exposure has been widely known in the railroad industry since at least the 1920s. Brief of the Washington Legal Foundation as Amicus Curiae in Support of Respondents at 16, Kurns, 565 U.S. 625 (2012) (No. 10-879), 2011 WL 4842586.4 KCSR, as Plaintiff‘s employer, was in the best position to publish warnings in the workplace about the presence of asbestos and protect Plaintiff from prolonged
Lastly, the Court is not persuaded by KCSR‘s uniformity argument. KCSR contends that uniformity in railroad equipment would be destroyed if it was subjected to suit for using in its locomotives the same products for which the manufacturers of those products were dismissed based on LIA preemption.7 However, the only disuniformity in applying these two federal statutes would potentially be some variation in outcomes based on the judge or jury, which “is quite different from the disuniformity that would arise from the multitude of state laws, state regulations, state administrative agency rulings, and state-court decisions” that could hinder the LIA in the absence of federal field preemption. POM Wonderful LLC v. Coca-Cola Co., 573 U.S. 102, 117 (2014). The LIA has co-existed as a supplement to the FELA for a lengthy period of time without Congress expressly forbidding or limiting FELA claims. “If Congress had concluded, in light of experience, that [FELA] suits could interfere with the [LIA], it might well have enacted a provision addressing the issue.” Id. at 113. In the absence of an express provision, “[i]t makes little sense to find that a statute that serves as an amendment to the FELA, making it easier in some cases for injured workers to pursue their claims, also restricts the kind of claims workers can bring, particularly in light of the
When reviewing the relevant jurisprudence, the Court is persuaded that the LIA does not preсlude FELA claims such as those asserted by Plaintiff in this matter. See Ayers, 538 U.S. at 141 (holding that in an asbestos exposure case involving work on locomotive and locomotive parts containing asbestos, the FELA “allow[s] a worker to recover his entire damages from a railrоad whose negligence jointly caused an injury (here, the chronic disease asbestosis), thus placing on the railroad the burden of seeking contribution from other tortfeasors“); King v. Southern Pacific Transp. Co., 855 F.2d 1485, 1489 n.1 (10th Cir. 1988) (“[C]laims which cannot be maintained under the [LIA] are often actionable under the FELA.“). Aсcordingly, KCSR‘s motion must be denied.
CONCLUSION
Based on the foregoing reasons, KCSR‘s partial motion for summary judgment [Record Document 53] is DENIED.
THUS DONE AND SIGNED this 10th day of November, 2021.
ELIZABETH ERNY FOOTE
UNITED STATES DISTRICT JUDGE
