Wis. Admin. Code § PSC 135.08
After 49 CFR 192.8(a)(5), insert:
(5w) Incidental gathering may not be used for steel pipelines operated at 100 p.s.i.g. or greater that leave the operator’s property.
History: CR 24-056: cr. Register July 2025 No. 835, eff. 8-1-25.