Learn More
Log In
Sign Up
Additions to 49 CFR Part 192 | Midpage
Collections
Wisconsin Administrative Code
PSC
PSC 135
II
Additions to 49 CFR Part 192
Public Service Commission
135.053
General additions [49 CFR 192.53].
135.08
Determination of onshore gathering pipelines and regulated onshore gathering pipelines additions [49 CFR 192.8].
135.125
Design of copper pipe addition [49 CFR 192.125].
135.163
Compressor stations: design and construction additions [49 CFR 192.163].
135.171
Compressor stations: additional safety equipment addition [49 CFR 192.171].
135.173
Compressor stations: ventilation addition [49 CFR 192.173].
135.181
Distribution line valves addition [49 CFR 192.181].
135.183
Vaults: structural design requirements additions [49 CFR 192.183].
135.187
Vaults: sealing, venting, and ventilation addition [49 CFR 192.187].
135.189
Vaults: drainage and waterproofing additions [49 CFR 192.189].
135.195
Protection against accidental overpressuring additions [49 CFR 192.195].
135.197
Control of the pressure of gas delivered from high-pressure distribution systems additions [49 CFR 192.197].
135.199
Requirements for design of pressure relief and limiting devices additions [49 CFR 192.199].
135.206
Addition [49 CFR 192.206w].
135.246
Addition [49 CFR 192.246w].
135.279
Copper pipe addition [49 CFR 192.279].
135.307
Inspection of materials addition [49 CFR 192.307].
135.309
Repair of steel pipe addition [49 CFR 192.309].
135.319
Installation of pipe in a ditch additions [49 CFR 192.319].
135.321
Installation of plastic pipe additions [49 CFR 192.321].
135.323
Casing addition [49 CFR 192.323].
135.324
Addition [49 CFR 192.324w].
135.325
Underground clearance addition [49 CFR 192.325].
135.355
Customer meters and regulators: protection from damage additions [49 CFR 192.355].
135.365
Service lines: location of valves addition [49 CFR 192.365].
135.371
Service lines: steel addition [49 CFR 192.371].
135.377
Service lines: copper additions [49 CFR 192.377].
135.457
External corrosion control: buried or submerged pipelines installed before August 1, 1971 addition [49 CFR 192.457].
135.505
Strength test requirements for steel pipeline to operate at a hoop stress of 30 percent or more of SMYS addition [49 CFR 192.505].
135.511
Test requirements for service lines addition [49 CFR 192.511].
135.613
Continuing surveillance additions [49 CFR 192.613].
135.614
Damage prevention program addition. [49 CFR 192.614].
135.621
Maximum allowable operating pressure: high-pressure distribution systems additions [49 CFR 192.621].
135.623
Maximum allowable operating pressure: low-pressure distribution systems addition [49 CFR 192.623].
135.629
Purging of pipelines addition [49 CFR 192.629].
135.707
Line markers for mains and transmission lines addition [49 CFR 192.707].
135.711
Transmission lines: General requirements for repair procedures addition [49 CFR 192.711].
135.713
Transmission lines: permanent field repair of imperfections and damages addition [49 CFR 192.713].
135.722
Addition [49 CFR 192.722w].
135.723
Distribution systems: leakage surveys additions [49 CFR 192.723].
135.724
Addition [49 CFR 192.724w].
135.727
Abandonment or deactivation of facilities addition [49 CFR 192.727].
135.735
Compressor stations: storage of combustible materials addition [49 CFR 192.735].
135.741
Pressure limiting and regulating stations: telemetering or recording gauges addition [49 CFR 192.741].
135.744
Addition [49 CFR 192.744w].
135.747
Valve maintenance: distribution systems addition [49 CFR 192.747].
135.751
Prevention of accidental ignition addition [49 CFR 192.751].