Wash. Admin. Code § 16-229-040
(3) Synthetic liners shall be installed under the supervision of a qualified representative of the manufacturer, a contractor certified by the manufacturer, or a certified engineer. All field constructed seams shall be tested, and repaired if necessary, in accordance with the manufacturer[']s recommendations.
Reviser's note: RCW 34.05.395 requires the use of underlining and deletion marks to indicate amendments to existing rules, and deems ineffectual changes not filed by the agency in this manner. The bracketed material in the above section does not appear to conform to the statutory requirement.
[Statutory Authority: Chapters 15.58 and 17.21 RCW. WSR 00-23-074, § 16-229-040, filed 11/17/00, effective 12/18/00. Statutory Authority: RCW 15.54.800 and 15.58.040. WSR 93-22-093 (Order 5018), § 16-229-040, filed 11/2/93, effective 3/1/94.]