- (1) If at any time during construction, enlargement, repair, alteration, or removal of a dam the state engineer finds that the conditions encountered differ appreciably from those assumed in the plan, the state engineer may require the plans to be modified.
- (2) If conditions are revealed which will not permit the construction of a safe dam, the state engineer shall revoke the approval.
Amended by Chapter 302, 2025 General Session