Utah Code Ann. § 73-10-33
(1) As used in this section:
(d) "Facility owner or operator" means:
(f) "Potential risk" means a condition where, if a water conveyance facility fails, the failure would create a high probability of:
(g) "Potential risk location" means a segment of a water conveyance facility that constitutes a potential risk due to:
(h)
(ii) "Water conveyance facility" does not include:
(2)
(b) For a management plan to be considered to be promptly adopted for purposes of this Subsection (2), the facility owner or operator shall:
(ii)
(A) adopt the management plan as described in Subsection (2)(b)(i) by no later than:
(B)
(3) A management plan described in Subsection (2) shall include at least the following:
(a) a GIS coverage or drawing of each potential risk location of a water conveyance facility identifying any:
(b) an evaluation of any potential slope instability that may cause a potential risk, including:
(f) an emergency response plan that:
(iii) includes, in the case of an emergency, how a first responder can:
(j) if storm water enters the water conveyance facility:
(5)
(6)
(c) The information and technical resources described in Subsection (5)(a) include:
(7)
(a) A facility owner or operator of a water conveyance facility that has a potential risk location shall provide the board or division upon request:
(10) This section does not:
(11) The following may not be introduced as evidence in any civil litigation on the issue of negligence, injury, or the calculation of damages: