To assist the commission in evaluating the technical merits of a compost facility, a site development plan shall be prepared and submitted to the commission along with Compost Form Number 3. The site development plan shall be sealed by a registered professional engineer in accordance with the provisions of 22 TAC §131.138 (Engineers' Seals). If the site development plan is submitted in a three ring binder or in a format that allows the removal or insertion of individual pages, it shall not be considered a bound document. The site development plan shall contain all of the following information.
(4) Land Use. To assist the executive director in evaluating the impact of the facility on the surrounding area, the applicant shall provide the following:
(5) Access. To assist the executive director in evaluating the impact of the facility on the surrounding roadway system, the applicant shall provide the following:
(6) Facility Development. To assist the executive director in evaluating the impact of the facility on the environment, the applicant shall provide the following.
(A) Surface water protection plan. The surface water protection plan shall be prepared by a registered professional engineer. At a minimum the applicant shall provide all of the following.
(iv) Present drainage calculations as follows.
(v) Drainage Maps and Drainage Plans shall be provided as follows.
(B) Geologic/Hydrogeologic report. The geologic/hydrogeologic report shall be prepared by an engineer or qualified geologist/hydrogeologist. The applicant shall include discussion and information on all of the following:
(i) a description of the regional geology of the area. This section shall include:
(iii) A description of the regional aquifers in the vicinity of the facility based upon published and open-file sources. The section shall provide:
(iv) Subsurface investigation report. This report shall describe all borings drilled on-site to test soils and characterize ground water and shall include a site map drawn to scale showing the surveyed locations and elevations of the boring. Boring logs shall include a detailed description of materials encountered including any discontinuities such as fractures, fissures, slickensides, lenses, or seams. Each boring shall be presented in the form of a log that contains, at a minimum, the boring number; surface elevation and location coordinates; and a columnar section with text showing the elevation of all contacts between soil and rock layers description of each layer using the Unified Soil Classification, color, degree of compaction and moisture content. A key explaining the symbols used on the boring logs and the classification terminology for soil type, consistency, and structure shall be provided.
(C) Groundwater protection plan. The application shall demonstrate the facility is designed so as not to contaminate the groundwater and so as to protect the existing groundwater quality from degradation. For the purposes of these sections, protection of the groundwater includes the protection of perched water or shallow surface infiltration. As a minimum, groundwater protection shall consist of all of the following.
(i) Liner system. All feedstock receiving, mixing, composting, post-processing, screening and storage areas shall be located on a surface which is adequately lined to control seepage. The lined surface shall be covered with a material designed to withstand normal traffic from the composting operations. At a minimum the lined surface shall consist of soil, synthetic, or an alternative material that is equivalent to two feet of compacted clay with a hydraulic conductivity of 1 x 10[/sup]-7[/sup] centimeters per second or less.
(ii) Ground water monitor system. The ground water monitoring system shall be designed and installed such that the system will reasonably assure detection of any contamination of the ground water before it migrates beyond the boundaries of the site. The monitoring system shall be designed based upon the information obtained in the "Ground water investigation report" required by subparagraph (6)(B)(v) of this paragraph.
(II) A groundwater sampling program shall provide four background ground water samples of all monitor wells within 24 months from the date of the issuance of the permit. The background levels shall be established from samples collected from each well at least once during each of the four calendar quarters: January-March; April-June; July-September; and October-December. Samples from any monitor well shall not be collected for at least 45 days following collection of a previous sample, unless a replacement sample is necessary. At least one sample per well shall be collected and submitted to a laboratory for analysis prior to accepting any material for processing at the facility. Background samples shall be analyzed for the parameters as follows:
(-a-) Heavy metals; arsenic, copper, mercury, barium, iron, selenium, cadmium, lead, chromium, and zinc;
(-b-) Other parameters: calcium, magnesium, sodium, carbonate, bicarbonate, sulphate, fluoride, nitrate (as N), total dissolved solids, phenolphthalein alkalinity as CaCo[sub]3[/sub], alkalinity as CaCo[sub]3[/sub], hardness as CaCo[sub]3[/sub], pH, specific conductance, anion-cation balance, groundwater elevation (MSL), total organic carbon (TOC) (four replicates/sample); and
(-c-) After background values have been determined the following indicators shall be measured at a minimum of 12 month intervals: TOC (four replicates), iron, manganese, pH, chloride, ground water elevation (MSL), and total dissolved solids. After completion of the analysis, a copy shall be sent to the executive director and a copy shall be maintained on-site.
(E) Process description. The process description shall be composed of a descriptive narrative along with a process diagram. The process description shall include all of the following.
(7) Site operating plan. This document is to provide guidance from the design engineer to site management and operating personnel in sufficient detail to enable them to conduct day to day operations in a manner consistent with the engineers design. As a minimum, the site operating plan shall include specific guidance or instructions on the all of the following:
Source Note:The provisions of this §332.47 adopted to be effective November 29, 1995, 20 TexReg 9717; amended to be effective December 30, 1996, 21 TexReg 12304.