- (a) An updated map of the area of review showing locations of all newly constructed or newly discovered wells not included in the technical report accompanying the permit application or in later reports shall be submitted annually to the executive director.
- (b) Except for routine monitoring required in §331.84(d) of this title (relating to Monitoring Requirements), results of required monitoring shall be maintained on site and reported to the executive director upon request or as specified in the permit.
- (c) Results of mechanical integrity and any other periodic test required by the executive director shall be reported upon request or as specified in the permit.
- (d) Monitoring may be reported on a project or field basis rather than on an individual well basis where manifold monitoring is used.
- (e) Routine monitoring data required in §331.84(c) and (d) of this title (relating to Monitoring Requirements) shall be reported at least quarterly to the executive director on a form provided by the executive director and in accordance with the form completion instructions. These reports must be postmarked no later than the tenth day of the following reporting period.
(f) In the event an excursion is verified in a designated monitor well, the permittee shall submit a written remedial action report at least every month to include for each well affected:
- (1) an explanation of required and other actions since the verifying analysis was taken. The explanation should include the date on which actions were initiated and completed;
- (2) a description of actions to be taken during the following report period;
- (3) sample analysis results for control parameters;
- (4) permittee's efforts to define the extent and probable cause of the presence of mining solutions in a designated monitor well.
- (g) The first report required by subsection (f) of this section shall include a groundwater analysis in the manner required by §331.106(2) of this title (relating to Remedial Action for Excursion). A copy of all reports shall be mailed to the executive director, postmarked within two days of the end of each report period. The first report period shall begin with the day the presence of mining solution in a designated Monitor Well is verified. The permittee shall continue to make remedial action reports until clean-up is accomplished.
Source Note:The provisions of this §331.85 adopted to be effective May 13, 1986, 11 TexReg 1984; amended to be effective April 28, 1997, 22 TexReg 3526.