- (a) Certification by registered professional engineer. The operator shall obtain certification by a Texas-Registered Professional Engineer that the facility has been constructed as designed and in general compliance with the regulations prior to initial operation and maintain that certification on-site for inspection.
- (b) Ownership or control of property. The facility shall be located on property owned by the operator or the operator shall establish, using an affidavit form provided by the executive director, signed by the owner and notarized, that the owner is aware of and consents to the operation prior to any processing activities. A copy of the affidavit shall be kept on-site at all times.
- (c) Inspection of facility. Prior to the initial operation of the facility, the facility shall be inspected by the executive director to determine compliance with the registration.
Source Note:The provisions of this §330.413 adopted to be effective December 3, 1996, 21 TexReg 11287.