- (a) The owner shall continuously maintain records to insure compliance with the approved plans and specifications during construction. Copies of these records shall be furnished to the executive director at monthly intervals during the construction period, and may include, but not necessarily be limited to, such items as soil moisture-density test results, and concrete trial batch designs test and compression test results.
- (b) Other observations which may be recorded include final bottom width and elevations of core and cutoff trenches, structural excavations, permanent sheet piles or bearing piles, and documentation of foundation groutings, dewatering problems, or observations during the construction period of any instruments installed to measure movements, stresses, and pore pressure.
Source Note:The provisions of this §299.24 adopted to be effective May 13, 1986, 11 TexReg 1978.