(a) Land planning and site evaluation. Property that will use an OSSF for sewage disposal shall be evaluated for overall site suitability. For property located on the Edwards Aquifer recharge zone, see §285.40 of this title (relating to OSSFs on the Recharge Zone of the Edwards Aquifer) for additional requirements. The following requirements apply to all sites where an OSSF may be located.
(1) Residential lot sizing.
- (A) Platted or unplatted subdivisions served by a public water supply. Subdivisions of single family dwellings platted or created after the effective date of this section, served by a public water supply and using individual OSSFs for sewage disposal, shall have lots of at least 1/2 acre.
- (B) Platted or unplatted subdivisions not served by a public water supply. Subdivisions of single family dwellings platted or created after the effective date of this section, not served by a public water supply and using individual OSSFs, shall have lots of at least one acre.
- (2) Manufactured housing communities or multi-unit residential developments. The owners of manufactured housing communities or multi-unit residential developments that are served by an OSSF and rent or lease space shall submit a sewage disposal plan to the permitting authority for approval. The total anticipated sewage flow for the individual tract of land shall not exceed 5,000 gallons per day. The plan shall be prepared by a professional engineer or professional sanitarian. This plan is in addition to the requirements of subsection (c) of this section.
(b) Approval of OSSF systems on existing small lots or tracts.
(1) Existing small lots or tracts, that do not meet the minimum lot size requirements under subsection (a) (1) (A) or (B) of this section and were either subdivided before January 1, 1988, or had a site-specific sewage disposal plan approved between January 1, 1988, and the effective date of this section, may be approved for an OSSF provided:
- (A) minimum separation distances in §285.31(d) of this title (relating to General Criteria for Treatment and Disposal Systems) are maintained;
- (B) the site has been evaluated according to §285.30 of this title (relating to Site Evaluation); and
- (C) all other requirements of this chapter regarding treatment and disposal are met.
(2) The owner of a single family dwelling on an existing small lot or tract (property 1) may transport the wastewater from the dwelling to an OSSF at another location (property 2) provided that:
- (A) both properties (properties 1 and 2) are owned by the same person;
- (B) the owner or owner's agent demonstrates that no OSSF authorized under these rules can be installed on the property which contains the single-family dwelling (property 1);
- (C) if property not owned by the owner of properties 1 and 2 must be crossed in transporting the sewage, the application includes all right-of-ways and permanent easements needed for the sewage conveyance lines; and
- (D) the application includes an affidavit indicating that the owner or the owner's agent recorded the information required by §285.3(b)(3) on the real property deeds of both properties (properties 1 and 2). The deed recording shall state that the properties cannot be sold separately.
- (c) Review of subdivision or development plans. Before the permit process for individual OSSFs can begin, persons proposing residential subdivisions, manufactured housing communities, multi-unit residential developments, business parks, or other similar uses and using OSSFs for sewage disposal shall submit planning materials for these developments to the permitting authority. The planning materials shall be prepared by a professional engineer or professional sanitarian and shall include an overall site plan, topographic map, 100-year floodplain map, soil survey, location of water wells, locations of easements as identified in §285.91(10) of this title (relating to Tables), and a complete report detailing the types of OSSFs to be considered and their compatibility with area-wide drainage and groundwater. A comprehensive drainage plan shall also be included in these planning materials. The permitting authority will either approve or deny the planning materials, in writing, within 45 days of receipt.
Source Note:The provisions of this §285.4 adopted to be effective February 5, 1997, 22 TexReg 1114; amended to be effective June 13, 2001, 26 TexReg 4115.