(a) If a sludge thickener(s) is used, following criteria are required:
- (1) Capacity. The maximum monthly sludge production rate must be used as the basis for sludge thickening system sizing and design.
(2) Flexibility.
- (A) A sludge thickening system must have a bypass.
(B) A facility with a design flow greater than 1.0 million gallons per day (mgd) must have:
- (i) at least dual sludge thickening units;
- (ii) an alternate means of thickening; or
- (iii) an alternate disposal method.
(b) Specific Requirements for a Mechanical Gravity Thickener.
(1) Equipment Features.
(A) A mechanical gravity thickener must have:
- (i) a low-speed stirring mechanism for continuous mixing and flocculation within the zone of sludge concentration;
- (ii) sludge storage, if sufficient storage is unavailable in other external tankage; and
- (iii) a means of controlling the rate of sludge withdrawal.
- (B) A mechanical thickener may use a chemical addition or dilution water feed system.
- (C) A scraper mechanical train must be capable of withstanding any expected torque load. The normal working torque load must not exceed 10% of the manufacturer's recommended torque load.
(2) Design Basis.
- (A) A mechanical thickener design must be justified in the report.
- (B) The executive director may require data from a pilot study or similar sludge thickening unit operating under similar conditions.
- (C) The thickener overflow rate must be at least 400 gallons per day per square foot (gpd/sf) but no more than 800 gpd/sf.
- (D) The minimum side water depth for a mechanical thickener is 10 feet.
- (E) A circular thickener must have a minimum bottom slope of 1.5 inches per foot.
- (F) The peripheral velocity of a scraper must be at least 15 feet per minute but no more than 20 feet per minute.
- (G) A mechanical thickener design must minimize the potential for short-circuiting.
(c) Dissolved Air Flotation (DAF) Thickener.
(1) Equipment Features.
- (A) A DAF basin must have a bottom scraper that function independently of the surface skimmer.
- (B) A recycle pressurization system for a DAF basin must use effluent or secondary effluent instead of potable water.
- (C) A DAF basin must have a polymer feed system. A feed system must meet the requirements of §217.247(r) of this title (relating to Chemical Pretreatment of Sludge).
- (D) A DAF basin must be located in a covered building with positive air ventilation.
(2) Design Basis.
- (A) A DAF basin design must be justified in the report.
- (B) The executive director may require data from a pilot study or similar DAF operating under similar conditions.
- (C) The hydraulic loading rate must not exceed 2.0 gallons per minute (gpm) per square foot (sf).
- (D) The solids loading rate must be at least 1.0 pound but not more than 4.0 pounds per hour per sf.
- (E) The air to solids weight ratio must be at least 0.02 but not more than 0.04.
- (F) A retention tank system must have a minimum pressure of 40 pounds per square inch gauge.
- (G) A skimmer must have multiple or variable speeds that allow an operational range of at least 1.0 foot per minute (fpm) but not more than 25.0 fpm.
(d) Centrifugal Thickener.
- (1) A centrifugal thickener design must be justified in the report.
- (2) The executive director may require data from a pilot study or similar centrifugal thickener operating under similar conditions.
- (3) A centrifugal thickener must be preceded by pretreatment to prevent plugging of a nozzle or excessive wear in the bowl.
- (4) The centrate is subject to §217.242 of this title (relating to Control of Sludge and Supernatant Volumes).
(e) Specific Requirements for Gravity Belt Thickeners.
(1) Equipment Features.
- (A) Gravity belt thickeners must include a wash water system (60 pounds per square inch minimum) capable of providing 60 gpm per meter of belt width belt. Booster pumps may be employed to achieve design conditions.
- (B) Gravity belt thickeners must include a polymer feed system that meets the requirements of §217.247 of this title.
- (C) A filtrate drainage system must be sized to remove the full hydraulic capacity of a gravity belt thickener without accumulation or ponding.
(2) Design Basis. Gravity belt thickener sizing must be based upon the following criteria, unless otherwise justified in the report:
- (A) maximum solids loading of 1,250 pounds per meter of belt width; or
- (B) maximum hydraulic loading 250 gpm per meter of belt width.
- (3) Gravity belt thickener filtrate is subject to the requirement in §217.242 of this title.