- (a) Construction. Construction material for an aeration basin and a clarifier must resist the effects of a corrosive wastewater environment.
(b) Freeboard.
- (1) An aeration basin must have a minimum freeboard of 18 inches at the peak flow.
- (2) A clarifier must have a minimum freeboard of 12 inches at the peak flow.
(c) Redundancy and Flow Control.
- (1) A facility with a design flow of equal to or greater than 0.4 million gallons per day (mgd) must have a minimum of two aeration basins and two clarifiers, unless the aeration equipment is removable without taking the aeration basin out of service.
- (2) Internal and interconnecting pipes must be capable of hydraulically passing the peak flow without overflow and with either the largest clarifier or the largest aeration basin out of service.
- (3) Each aeration basin and clarifier must have gates or valves to allow it to be hydraulically isolated.
- (4) Each aeration basin and clarifier must have a dedicated means for dewatering.
Source Note:The provisions of this §217.153 adopted to be effective August 28, 2008, 33 TexReg 6843.