(a) Horizontal Flow Grit Chambers.
- (1) Velocity through a grit chamber must range at least 0.8 feet per second but not more than 1.3 feet per second.
- (2) A grit chamber channel must minimize turbulence and provide uniform velocity across the channel.
- (3) The channel size must accommodate the grit removal equipment capacity and grit storage.
(b) Aerated Grit Chambers.
- (1) An air diffuser and baffle arrangement design must separate the size of grit planned for removal.
- (2) The aeration equipment must vary air feed rates along the length of a grit chamber from 3.0 seconds per cubic foot per meter (scfm) per linear foot but not more than 8.0 scfm per linear foot.
- (3) A grit chamber must have a hydraulic detention time of at least 3.0 minutes.
- (4) A grit chamber must include a grit hopper located under an air diffuser.
(c) Mechanical Grit Chambers.
- (1) The velocity through mechanical grit chambers must be no greater than 1.0 foot per second at the design flow.
- (2) A channel must include a grit hopper at the side of a tank contiguous to a grit removal mechanism.
- (3) An inlet must include baffles to prevent short-circuiting.
(4) Grit removal must be provided by one of the following:
- (A) Reciprocating rake;
- (B) Screw conveyor; or
- (C) Air lift pump.
(d) Cyclonic Degritters.
- (1) A cyclonic degritter must prevent entry-to-overflow short circuit.
- (2) A cyclonic degritter must include an adjustable apex with a quick disconnect assembly to remove any oversized object.
- (3) Detention time in a cyclonic degritter must be at least 1.0 minute at the design flow.
- (4) The flow velocity must be at least 1.0 foot per second but not more than 2.0 feet per second at the design flow.
- (5) A screening unit must be installed upstream of a cyclonic degritter.
(e) Vortex Grit Chamber.
- (1) An inlet channel must include a straight length in order to deliver smooth flow into the vortex grit chamber.
- (2) Minimum initial inlet velocity at the peak flow must be at least 2.0 feet per second.
- (3) A vortex system must include rotating paddles in the center of a grit chamber and must rotate at a maximum 21 revolutions per minute.
- (4) An outlet channel must maintain a constant elevation.
- (5) Grit removal from a grit storage chamber must be by pumps specifically designed to handle grit.
Source Note:The provisions of this §217.125 adopted to be effective August 28, 2008, 33 TexReg 6843.