- (a) A detector tape must be laid in the same trench as a force main pipe. The detector tape must be located above and parallel to the force main.
- (b) The detector tape must bear the label "PRESSURIZED WASTEWATER" continuously repeated in at least 1.5 inch letters.
Source Note:The provisions of this §217.66 adopted to be effective August 28, 2008, 33 TexReg 6843.