- (a) If requested by the executive director, an owner shall submit construction drawings and technical specifications for a constructed collection system or treatment facility within 30 days after receiving the request.
- (b) The signed and dated seal of the engineer who is responsible for the facility design must be on each sheet of the construction drawings and on the title page of the bound technical specifications.
(c) The final construction drawings and technical specifications must include all items in the following paragraphs that are applicable to a project.
(1) Construction drawings for a wastewater collection system.
- (A) The drawings for a wastewater collection system must include plan and profile drawings for both gravity pipes and pressure pipes, and the drawings must specify the size, grade, and type of pipe materials.
- (B) The drawings must also specify the location of any structural features of a collection system, including manholes, waterway crossings, bridge crossings, siphons, lift stations, and air release valves.
- (C) The drawings must locate all potable water distribution lines that are 9.0 feet or closer to any portion of a wastewater collection system and indicate the actual separation distances.
- (D) The drawings must include dimensional section details of manholes, manhole covers, and any other collection pipe appurtenances.
(E) The drawings for a lift station must show the location of the following:
- (i) all pumps, valves, pumping control equipment, safety equipment, and ventilation equipment;
- (ii) points that may be accessed by operational staff, such as manholes and cleanout ports;
- (iii) hatches and hoisting equipment for installing and removing equipment;
- (iv) slope and location of any wet well, floor grouting, valve vaults, valve vault pipes, and gas migration prevention measures used between a wet well and a valve vault;
- (v) pipe entrances and exits;
- (vi) sump pumps;
- (vii) elevations of level control switches; and
- (viii) any other lift station-related appurtenances.
(2) Construction drawings for a wastewater treatment facility.
(A) The drawings for a wastewater treatment facility show a vertical and horizontal scale and must include:
- (i) plan drawings of all pipes;
- (ii) plan and profile drawings of each treatment unit;
- (iii) the dimensions of each wastewater treatment unit;
- (iv) all mechanical, electrical, and construction details; and
- (v) a hydraulic profile of a treatment facility at both design and peak flows.
- (B) The construction drawings may include plans for future expansion of a facility.
- (C) The construction drawings may include a clarification of any complex details of pipe systems by including an isometric flow diagram.
(3) The specifications for a material alteration or expansion of an existing collection system or treatment facility must include technical descriptions of all equipment including:
- (A) the quantity and sizes of any equipment;
- (B) any applicable materials specifications;
- (C) testing requirements; and
- (D) national standards citations.
- (4) If requested by the executive director, an owner must submit additional information relating to the plans and specifications within 30 days after receiving a request.
Source Note:The provisions of this §217.13 adopted to be effective August 28, 2008, 33 TexReg 6843.