30 Tex. Admin. Code § 116.711
Flexible Permit Application
Effective Sep 12, 200227 TexReg 8546Source Note: The provisions of this §116.711 adopted to be effective December 8, 1994, 19 TexReg 9360; amended to be effective July 8, 1998, 23 TexReg 6973; amended to be effective March 29, 2001, 26 TexReg 2398; amended to be effective September 12, 2002, 27 TexReg 8546.Texas Secretary of State
Any application for a new flexible permit or flexible permit amendment must include a completed Form PI-1 General Application. The Form PI-1 must be signed by an authorized representative of the applicant. The Form PI-1 specifies additional support information which must be provided before the application is deemed complete. In order to be granted a flexible permit or flexible permit amendment, the owner or operator of the proposed facility shall submit information to the commission which demonstrates that all of the following are met.
- (1) Protection of public health and welfare. The emissions from the proposed facility, group of facilities, or account as determined under §116.716 of this title (relating to Emission Caps and Individual Emission Limitations), will comply with all rules and regulations of the commission and with the intent of the TCAA, including protection of the health and physical property of the people. In considering the issuance of a flexible permit for construction or modification of any facility, group of facilities, or account within 3,000 feet or less of an elementary, junior high/middle, or senior high school, the commission shall consider any possible adverse short-term or long-term side effects that an air contaminant or nuisance odor from the facility, group of facilities, or account may have on the individuals attending these school facilities.
- (2) Measurement of emissions. The proposed facility, group of facilities, or account will have provisions for measuring the emission of air contaminants as determined by the executive director. This may include the installation of sampling ports on exhaust stacks and construction of sampling platforms in accordance with guidelines in the "Texas Natural Resource Conservation Commission Sampling Procedures Manual."
- (3) Best available control technology (BACT). The proposed facility, group of facilities, or account will utilize BACT, with consideration given to the technical practicability and economic reasonableness of reducing or eliminating the emissions from the facility on a proposed facility, group of facilities, or account basis. Control technology beyond BACT may be used on certain facilities to provide the emission reductions necessary to comply with this requirement on a group of facilities or account basis, provided however, that the existing level of control may not be lessened for any facility. For new facilities and proposed affected sources (as defined in §116.15(1) of this title (relating to Section 112(g) Definitions)) subject to Subchapter C of this chapter (relating to Hazardous Air Pollutants: Regulations Governing Constructed or Reconstructed Major Sources (FCAA, §112(g), 40 CFR Part 63)), the use of BACT shall be demonstrated for the individual facility or affected source.
- (4) New Source Performance Standards (NSPS). The emissions from each affected facility as defined in 40 Code of Federal Regulations (CFR), Part 60 will meet at least the requirements of any applicable NSPS as listed under Title 40 CFR Part 60, promulgated by the EPA under authority granted under the FCAA, §111, as amended.
- (5) National Emission Standards for Hazardous Air Pollutants (NESHAPS). The emissions from each facility as defined in 40 CFR Part 61 will meet at least the requirements of any applicable NESHAPS, as listed under 40 CFR Part 61, promulgated by EPA under authority granted under the FCAA, §112, as amended.
- (6) NESHAPS for source categories. The emissions from each affected facility shall meet at least the requirements of any applicable MACT standard as listed under 40 CFR Part 63, promulgated by the EPA under FCAA, §112 or as listed under Chapter 113, Subchapter C of this title (relating to National Emissions Standards for Hazardous Air Pollutants for Source Categories (FCAA, §112, 40 CFR 63)).
- (7) Performance demonstration. The proposed facility, group of facilities, or account will achieve the performance specified in the flexible permit application. The applicant may be required to submit additional engineering data after a flexible permit has been issued in order to demonstrate further that the proposed facility, group of facilities, or account will achieve the performance specified in the flexible permit. In addition, initial compliance testing with ongoing compliance determined through engineering calculations based on measured process variables, parametric or predictive monitoring, stack monitoring, or stack testing may be required.
- (8) Nonattainment review. If the proposed facility, group of facilities, or account is located in a nonattainment area, each facility shall comply with all applicable requirements concerning nonattainment review in this chapter.
- (9) Prevention of Significant Deterioration (PSD) review. If the proposed facility, group of facilities, or account is located in an attainment area, each facility shall comply with all applicable requirements in this chapter concerning PSD review.
- (10) Air dispersion modeling or ambient monitoring. Computerized air dispersion modeling and/or ambient monitoring may be required by the commission's New Source Review Permits Division to determine the air quality impacts from the facility, group of facilities, or account. In conducting a review of a permit application for a shipbuilding or ship repair operation, the commission will not require and may not consider air dispersion modeling results predicting ambient concentrations of non-criteria air contaminants over coastal waters of the state. The commission shall determine compliance with non-criteria ambient air contaminant standards and guidelines at land-based off-property locations.
- (11) Federal standards of review for constructed or reconstructed major sources of hazardous air pollutants. If the proposed source is an affected source (as defined in §116.15(1) of this title), it shall comply with all applicable requirements under Subchapter C of this chapter.
- (12) Mass cap and trade allocations. If subject to Chapter 101, Subchapter H, Division 3 of this title (relating to Mass Emissions Cap and Trade Program) the proposed facility, group of facilities, or account must obtain allocations to operate.
(13) Application content. In addition to any other requirements of this chapter, the applicant shall:
- (A) identify each air contaminant for which an emission cap is desired;
- (B) identify each facility to be included in the flexible permit;
- (C) identify each source of emissions to be included in the flexible permit and for each source of emissions identify the Emission Point Number (EPN) and the air contaminants emitted;
- (D) for each emission cap, identify all associated EPNs and provide emission rate calculations based on the expected maximum capacity and the proposed control technology;
- (E) for each individual emission limitation, identify the EPN and provide emission rate calculations based on the expected maximum capacity and the proposed control technology.
- (14) Proposed control technology and compliance demonstration. The applicant shall specify the control technology proposed for each unit to meet the emission cap and demonstrate compliance with all emission caps at expected maximum production capacity.
Source Note:The provisions of this §116.711 adopted to be effective December 8, 1994, 19 TexReg 9360; amended to be effective July 8, 1998, 23 TexReg 6973; amended to be effective March 29, 2001, 26 TexReg 2398; amended to be effective September 12, 2002, 27 TexReg 8546.