Any oil or gas production facility, carbon dioxide separation facility, or oil or gas pipeline facility consisting of one or more tanks, separators, dehydration units, free water knockouts, gunbarrels, heater treaters, natural gas liquids recovery units, or gas sweetening and other gas conditioning facilities, including sulfur recovery units at facilities conditioning produced gas containing less than two long tons per day of sulfur compounds as sulfur are permitted by rule, provided that the following conditions of this section are met. This section applies only to those facilities named which handle gases and liquids associated with the production, conditioning, processing, and pipeline transfer of fluids found in geologic formations beneath the earth's surface.
- (1) Compressors and flares shall meet the requirements of §106.512 and §106.492 of this title (relating to Stationary Engines and Turbines, and Flares).
- (2) Total emissions, including process fugitives, combustion unit stacks, separator, or other process vents, tank vents, and loading emissions from all such facilities constructed at a site under this section shall not exceed 25 tons per year (tpy) each of sulfur dioxide (SO2), all other sulfur compounds combined, or all volatile organic compounds (VOC) combined; and 250 tpy each of nitrogen oxide and carbon monoxide. Emissions of VOC and sulfur compounds other than SO2 must include gas lost by equilibrium flash as well as gas lost by conventional evaporation.
- (3) Any facility handling sour gas shall be located at least 1/4 mile from any recreational area or residence or other structure not occupied or used solely by the owner or operator of the facility or the owner of the property upon which the facility is located.
- (4) Total emissions of sulfur compounds, excluding sulfur oxides, from all vents shall not exceed 4.0 pounds per hour (lb/hr) and the height of each vent emitting sulfur compounds shall meet the following requirements, except in no case shall the height be less than 20 feet:
Attached Graphic
- (5) Before operation begins, facilities handling sour gas shall be registered with the commission's Office of Permitting, Remediation, and Registration in Austin using Form PI-7 along with supporting documentation that all requirements of this section will be met. For facilities constructed under §106.353 of this title (relating to Temporary Oil and Gas Facilities), the registration is required before operation under this section can begin. If the facilities cannot meet this section, a permit under Chapter 116 of this title (relating to Control of Air Pollution by Permits for New Construction or Modification) is required prior to continuing operation of the facilities.
Source Note:The provisions of this §106.352 adopted to be effective March 14, 1997, 22 TexReg 2439; amended to be effective September 4, 2000, 25 TexReg 8653.