16 Tex. Admin. Code § 8.115
Except as set forth below, at least 30 days prior to commencement of construction of any installation totaling one mile or more of pipe, each operator shall file with the Commission a report stating the proposed originating and terminating points for the pipeline, counties to be traversed, size and type of pipe to be used, type of service, design pressure, and length of the proposed line. New construction on natural gas distribution or master meter systems of less than five miles is excepted from this reporting requirement.
Source Note:The provisions of this §8.115 adopted to be effective November 24, 2004, 29 TexReg 10733.