(a) Inspections.
- (1) Initial inspection is required and must identify the accessibility modifications needed by the Person with Disability; assess and document the condition of the property; and identify all deficiencies that constitute life-threatening hazards and unsafe conditions.
- (2) Final inspection is required and must verify, assess and document that all construction activities have been repaired, replaced and/or installed in a professional manner consistent with all applicable building codes and Program requirements.
- (3) Initial and final inspections must be completed by a Qualified Inspector.
- (4) All On-Site Sewage Facilities (OSSF or septic system) shall be inspected by a Texas Commission on Environmental Quality authorized agent to determine if the system is in substantial compliance with Health & Safety Code, Chapter 366, and the rules adopted under that chapter, unless waived by the Department on a case-by-case basis.
- (b) A Manufactured Housing Unit may be eligible for Program assistance if it was constructed on or after January 1, 1995.
(c) Construction standards.
- (1) Administrators must follow all applicable sections of their local building codes and ordinances, pursuant to Section 214.212 of the Local Government Code. Where local codes do not exist, the 2015 International Residential Code (IRC), including Appendix J for Existing Buildings and Structures, is the applicable code for the Program.
- (2) Accessibility modifications shall be made with consideration of the design standards established by the 2010 ADA Standards. Any variation from 2010 ADA Standards must be documented as necessary to meet the disability related needs of the Person with a Disability.
- (3) Administrators must adhere to Chapter 21 of this Title, relating to "Minimum Energy Efficiency Requirements for Single Family Construction Activities."
(d) Life-threatening hazards and unsafe conditions.
- (1) Administrators may make repairs to eliminate life-threatening hazards and correct unsafe conditions in the housing unit as long as no more than 25% of the Project Hard Costs budget is utilized for this purpose, unless otherwise approved by the Department.
- (2) Life-threatening hazards and unsafe conditions include, but are not limited to: faulty or damaged electrical systems; faulty or damaged gas-fueled systems; faulty or damaged heating and cooling systems or the absence of adequate heating and cooling system; faulty or damaged plumbing systems, including sanitary sewer systems; faulty or damaged smoke, fire and carbon monoxide detection/alarm systems or the absence of these systems; structural systems on the verge of collapse or failure; environmental hazards such as mold, lead-based paint, asbestos or radon; serious pest infestation; absence of adequate emergency escape and rescue openings and fire egress; and the absence of ground fault circuit interrupters (GFCI) and arc fault circuit interrupters (AFCI) in applicable locations.
- (3) Because of the essential nature of the elimination of certain life-threatening hazards, the percentage of Project Hard Costs budget devoted to eliminate life-threatening hazards and correct unsafe conditions in the housing unit may exceed 25% if the work write-up and cost estimation includes the correction of inadequate, faulty, damaged or absent: emergency escape, rescue openings and fire egress; ground fault circuit interrupters (GFCI); arc fault circuit interrupters (AFCI); and smoke, fire and carbon monoxide detection/alarm systems. The combination of the correction of these certain life-threatening hazards with the correction of any other unsafe conditions cannot exceed 40% of Project Hard Costs budget.
- (4) All areas and components of the housing must be free of life-threatening hazards and unsafe conditions at project completion.
- (e) Work-Write Ups. The Department shall review work-write ups (also referred to as "scope of work") and cost estimates prior to the Administrator soliciting bids.
- (f) Bids. The Department shall review all line item bids Administrators select for award prior to the commencement of construction. Lump sum bids will not be accepted.
- (g) Change orders. Administrators seeking change orders must obtain written Department approval prior to the commencement of any work related to the proposed change. Failure to get prior Departmental approval may result in disallowed costs.
Source Note:The provisions of this §26.27 adopted to be effective November 5, 2017, 42 TexReg 6002.