S.C. Code Ann. § 15-53-40

Construction of contract before or after breach

1962 Code SECTION 10-2004; 1952 Code SECTION 10-2004; 1948 (45) 2014.

A contract may be construed either before or after there has been a breach thereof.

HISTORY: 1962 Code SECTION 10-2004; 1952 Code SECTION 10-2004; 1948 (45) 2014.

Log InSign Up