250-RICR-150-20-2
A. For the purposes of these Regulations, the following terms shall have the following meanings:
A. A project cannot receive funding from any DEM assistance program which utilizes the Priority Determination System unless it is on the approved Project Priority List. The DEM, Office of Water Resources must receive a letter of intent or equivalent document requesting that the proposed project be placed upon the Project Priority List. To be rated and ranked under the project priority system, the letter of intent for a requested project must include:
A. The Director shall rate each project according to the project rating criteria in Appendix I of these Regulations. In order to rate a project, the Director must determine that the project will contribute to achieving the State water quality policy goals and objectives. The numerical scores in Appendix I are based on the following:
A. The Director shall review the PPL for changes in estimated project schedules, project costs and/or scope, annually. The Director may propose modification of the PPL at any time according to these procedures:
2. Removal from the list:
| APPLICANT: | PointValues | ActualRating | Item# | ||
| PROJECT: | |||||
| I. | EXISTING CONDITIONS CRITERIA † | ||||
| A. | Direct Raw Sewage Discharge/Sanitary Sewer Overflow | 7 | A | ||
| B-1 | Failing OWTS. - Documented Water Quality Degradation | 7 | B-1 | ||
| B-2 | Failing OWTS – Other | 3 | B-2 | ||
| C-1 | Untreated/uncontrolled runoff - Documented Water Qual. Degrad. (Pathogen impacts) | 5 | C-1 | ||
| C-2 | Untreated/uncontrolled runoff - Documented Water Qual. Degrad. (Non-path. impacts) | 3 | C-2 | ||
| C-3 | Untreated/uncontrolled runoff – Other | 2 | C-3 | ||
| D-1 | Wastewater Treatment Facility | 3 | D-1 | ||
| D-2 | Collection System/Pump Station | 1 | D-2 | ||
| E. | Combined Sewer Overflows | 10 | E | ||
| F. | Landfill - Closure imminent or closed | 3 | F | ||
| G-1 | Underground Storage Tank – Leaking | 3 | G-1 | ||
| G-2 | Underground Storage Tank - Potential to leak (single wall construction) | 2 | G-2 | ||
| H. | Materials Storage Area | 3 | H | ||
| I-1 | Sub-surface Discharge - non-sanitary wastewater | 2 | I-1 | ||
| I-2 | Sub-surface Discharge - stormwater only | 1 | I-2 | ||
| J. | Stormwater treatment/management facility | 3 | J | ||
| K. | Atmospheric Deposition | 1 | K | ||
| L. | Excessive Flows - exceeds design flow or operational capacity | 3 | L | ||
| M. | Streambank erosion or scouring | 3 | M | ||
| N. | Stream continuity/connectivity impaired | 3 | N | ||
| O. | Drinking water well contamination | 3 | O | ||
| Section I - Total Points | _____ | ||||
| II. | PROPOSED PROJECT BENEFITS CRITERIA † * | ||||
| A. | Regional Project (i.e. project serves more than one community) | 5 | A | ||
| B | Treatment of Septage at Existing WWTF | 3 | B | ||
| C. | Operational Reliability Improvement | 2 | C | ||
| D. | Project helps to alleviate a Sewer Connection/Extension Ban in the area served | 5 | D | ||
| E. | Demonstration or Pilot Projects | 2 | E | ||
| F. | Project incorporates pollution prevention/waste minimization techniques | 2 | F | ||
| G. | Project protects or restores a critical aquatic habitat or resource | 3 | G | ||
| H. | Project provides technical assistance/public education | 2 | H | ||
| I. | Project improves permitted discharge from interim to final limits(discharge is presently in compliance with interim limits) | 3 | I | ||
| J. | Project addresses/prevents water pollution within a growth center | 5 | J | ||
| K. | Project incorporates green infrastructure, energy conservation or other sustainable measures | 5 | K | ||
| L. | Project implements climate change resiliency measures | 5 | L | ||
| Section II - Total Points | _____ | ||||
| III. | WATER QUALITY IMPROVEMENT CRITERIA ‡ | ||||
| A. | Surface Water Restoration † [Use Integrated 305(b)/303(d) Report] | ||||
| A-1 | Project affects a Category 4.A or 4.B waterbody | 8 | A-1 | ||
| A-2 | Project affects a Category 5 waterbody | 6 | A-2 | ||
| A-3 | Project affects a Category 4.C waterbody | 4 | A-3 | ||
| Subtotal III A | _____ | ||||
| B. | Surface Water Protection † [Use RIDEM Water Qual. Regs. & 305(b)/303(d) Report] | ||||
| B-1 | Project affects an SRPW drinking water supply waterbody | 8 | B-1 | ||
| B-2 | Project affects another SRPW or Category 2 waterbody | 6 | B-2 | ||
| Subtotal III B | _____ | ||||
| C. | Groundwater Protection Factor [Use Rules and Regulations for Groundwater Quality] † | ||||
| C-1 | Project affects a Wellhead Protection Area for Community Water System Well | 6 | C-1 | ||
| C-2 | Project affects an area of GAA Groundwater | 4 | C-2 | ||
| C-3 | Project affects an area of GA Groundwater | 2 | C-3 | ||
| C-4 | Project affects an area of GB Groundwater | 1 | C-4 | ||
| Subtotal III C | _____ | ||||
| Section III - Total Points | _____ | ||||
| IV. | INTERGOVERNMENTAL NEEDS CRITERIA †† | ||||
| A. | Project is consistent with Community Comprehensive Plan/State Guide Plan | 3 | A | ||
| B. | Project is consistent with an approved Wastewater Facilities Plan or OWMP | 3 | B | ||
| C. | Project is consistent with a Special Area Management (SAM) Plan | 3 | C | ||
| D. | Project is consistent with the Areawide Waste Management Plan (208 Plan) | 1 | D | ||
| E. | Project is consistent with the Nonpoint Source Management Plan (319 Plan) | 3 | E | ||
| F. | Project is consistent with the Comp. Conservation and Management Plan (CCMP) | 3 | F | ||
| G. | Project is consistent with TMDL or Watershed Action Plan | 3 | G | ||
| H. | Project is consistent with the local Stormwater Management Plan | 3 | H | ||
| I. | Project is consistent with the Implications for Climate Change for RI Wastewater Collection and Treatment Infrastructure | 3 | I | ||
| J. | Population Served by the Project † | J. | |||
| J-1 | 1 – 14,999 | 1 | J-1 | ||
| J-2 | 15,000 – 49,999 | 2 | J-2 | ||
| J-3 | 50,000 | 3 | J-3 | ||
| Section IV – Total Points | _____ | ||||
| V. | READINESS TO PROCEED CRITERIA | ||||
| A. | Planning † | ||||
| A-1 | Remedial Action Work Plan has been approved | 2 | A-1 | ||
| A-2 | Wastewater Facilities Plan or OWMP approved or reaffirmed | 2 | A-2 | ||
| A-3 | Environmental Assessment or Categorical Exclusion Approved | 2 | A-3 | ||
| A-4 | Lake Management Plan Approved | 2 | A-4 | ||
| Subtotal V A | _____ | ||||
| B. | Design | ||||
| B-1 | Plans and Specifications approved | 2 | B-1 | ||
| Subtotal V B | _____ | ||||
| C. | Financial/Other †† | ||||
| C-1 | Local bonding authority approved, system revenues pledged or other local funds committed | 2 | C-1 | ||
| C-2 | Pre-application for SRF Funding complete (i.e. qualified for loan by RIIB) | 2 | C-2 | ||
| C-3 | Grant funding has been secured | 2 | C-3 | ||
| C-4 | Local ordinance/zoning passed in support of the project | 2 | C-4 | ||
| Subtotal V C | _____ | ||||
| Section V - Total Points | _____ | ||||
| † - Select one criterion, at most, for each category. For example, choose A-1, A-2 or neither as applicable. | |||||
| † † - Select each and every criterion which applies. | |||||
| * - Points are awarded for projects at the project site if the criterion is included in the proposed project. | |||||
| ‡ - For water bodies that are included on the surface water reclamation and protection lists, the highest total point rating under either of those lists must be used, but not both. |