250-RICR-150-10-4
A. For the purposes of these Rules and Regulations only, the subsequent terms shall have the following meanings:
9. “Owner” means
11. "Risk and resiliency coordinator(s)" means a position or positions in authority within the management, operations, and/or maintenance functions of a wastewater treatment facility that is responsible for implementing the National Preparedness Goals. The risk and resiliency coordinator(s) may be either a standalone position or a function held by several individuals and at a minimum will
16. “Wastewater treatment facility” means a group or assemblage of processes, devices and structures for the conveyance, treatment or removal of objectionable constituents of wastewater. A wastewater treatment facility shall include, but not be limited to, all physically connected wastewater collection system piping, pumping, storage, physical, chemical and/or biological treatment, filtering and disinfection systems. For the purposes of these Rules and Regulations, a wastewater treatment facility shall include privately owned wastewater collection, pumping, storage and conveyance systems interconnected with and emptying into a host wastewater collection system. For the purposes of these Rules and Regulations, a wastewater treatment facility shall not be considered to be:
F. The Owner may request an extension in time to complete and submit the required revisions or submission of a Plan, per §§ 4.5(D) and (E) of this Part, but this extension cannot exceed one year in addition to the one year herein.
H. The contents of the Plan shall include at a minimum the following:
1. Descriptions and schematics of the entire wastewater treatment facility in either paper or electronic form, and an overall plan with appropriate labels for major components (i.e. collection piping and pumping, headworks, clarifiers, aeration tanks, disinfection, sludge handling, etc.), outfall(s) and compliance sampling locations. This description and schematic must include:
6. A staffing plan of staff directly involved in the operations, maintenance, collections systems, and laboratory of the wastewater treatment facility, including but not limited to:
C. Upon review of the Plan, the Director may:
A. The Director may require any wastewater treatment facility to: