- (1) If electrical power produced by a generator owned by a qualified data center is sold to a public utility or an electric cooperative, the price may not exceed the cost of production.
(2) The cost of production includes:
- (a) the capital cost of constructing the generator;
- (b) depreciation;
- (c) wages, salaries, and employee benefits of personnel located at the generator who operate and maintain the facility;
- (d) fuel;
- (e) operating supplies and materials;
- (f) utilities; and
- (g) contracted services necessary to operate and maintain the generator.
(3) The cost of the production does not include:
- (a) any cost for corporation administration;
- (b) travel; or
- (c) corporate legal services.
- (4) The public utility or electric cooperative has the right to annually audit the operating costs of the generator at the utility's sole expense.
(5) As used in this section:
- (a) "Electric cooperative" has the same meaning as "cooperative" as provided in 35-18-102.
- (b) "Public utility" has the same meaning as provided in 69-3-101.
- (c) "Qualified data center" has the same meaning as provided in 15-6-162.
History: En. Sec. 1, Ch. 678, L. 2025.