Admin. R. Mont. 36.12.110
Legal Land Description Standards
Effective Jan 1, 2024Authorizing statute(s): 85-2-113, MCA; Implementing statute(s): 85-2-301 through 85-2-319, 85-2-321 through 85-2-323, 85-2-329 through 85-2-331, 85-2-335 through 85-2-338, 85-2-340 through 85-2-344, 85-2-351, 85-2-401, 85-2-402, 85-2-407, 85-2-408, 85-2-410 through 85-2-413, 85-2-415 through 85-2-419, 85-2-436, 85-2-501 through 85-2-512, 85-2-601 through 85-2-606, 85-2-608, 85-2-804 through 85-2-806, MCAState of Montana
(1) Primary points of diversion must be described as one or more of the following:
- (a) 1/4 1/4 1/4 section, section, township, range and county;
- (b) lot, block, subdivision, 1/4 section, section, township, range and county;
- (c) government lot, 1/4 section, section, township, range, and county;
- (d) certificate of survey number with a lot number, if present, 1/4 section, section, township, range, and county; or
- (e) latitude/longitude coordinates and the geodetic reference system used to collect the coordinates.
- (2) The point of diversion legal description of an on-stream reservoir must be described as the point where the dam or pit crosses the source of supply.
- (3) Transitory diversions must be described as the most upstream diversion point the most downstream diversion point.
- (4) If secondary diversions are described, they must be identified as "secondary" and meet one of the description standards in (1).
- (5) The legal land description for the place of use must be listed to the nearest concise legal land description.
Authorizing statute(s): 85-2-113, MCA
Implementing statute(s): 85-2-301 through 85-2-319, 85-2-321 through 85-2-323, 85-2-329 through 85-2-331, 85-2-335 through 85-2-338, 85-2-340 through 85-2-344, 85-2-351, 85-2-401, 85-2-402, 85-2-407, 85-2-408, 85-2-410 through 85-2-413, 85-2-415 through 85-2-419, 85-2-436, 85-2-501 through 85-2-512, 85-2-601 through 85-2-606, 85-2-608, 85-2-804 through 85-2-806, MCA
History: NEW, 2005 MAR p. 162, Eff. 1/1/05; AMD, 2023 MAR p. 1872, Eff. 1/1/24.