- (1) Applicant must obtain an operating permit for each mine complex on a form prescribed by the department.
- (2) To obtain an operating permit the applicant shall pay a $500 fee.
(3) In addition to the information required by 82-4-335(4), MCA, an application for an operating permit must describe the following:
- (a) the existing environment;
- (b) soil salvage and stockpiling activities and measures to protect soil from erosion and contamination;
- (c) provisions for the prevention of wind erosion of all disturbed areas;
- (d) the design, construction, and operation of the mine, mill, tailings, and waste rock disposal facilities;
- (e) the facilities, buildings, and capacity of mill or processing;
- (f) the proposed date for commencement of mining, the minerals to be mined, and a proposed conceptual life of mine operations;
- (g) the designs of diversions, impoundments, and sediment control structures to be constructed reflecting their safety, utility, and stability;
- (h) the location of access, haul, and other support roads and provisions for their construction and maintenance that control and minimize channeling and other erosion;
- (i) the source and volume of incoming ore, tailings, or waste rock;
- (j) the equipment and chemicals to be used in the operation by location and task;
- (k) the general chemical processes and the purpose, amount, and source of water used in the operation and the disposition of any process waste water or solutions;
- (l) the ground and surface water monitoring programs to be implemented including a schedule for reporting results to the department;
- (m) a contingency plan addressing accidental discharges to ground or surface water;
- (n) a fire protection plan;
- (o) a toxic spill contingency plan with certification that notice of the filing of the plan has been provided to the state fire marshal;
- (p) the sewage treatment facilities and solid waste disposal sites;
- (q) the power needs and source(s) , including fuel storage sites;
- (r) the anticipated employment including direct and onsite contract employees;
- (s) the transportation network to be used during the construction and operation phases, including a list of the type and amount of traffic at mine or mill capacity;
- (t) the predicted noise levels by activities during construction and operations;
- (u) the protective measures for archaeological and historical values in the areas to be mined;
- (v) the protective measures designed to avoid foreseeable situations of unnecessary damage to flora and fauna in or adjacent to the area.
(4) The application must include a map or maps to scale of:
- (a) the proposed permit area and area to be disturbed, including anticipated phases or increments of disturbance, if applicable;
- (b) the location of the proposed mine and facilities;
- (c) the location and identity of streams within one mile of the permit boundary and three miles down gradient unless a lesser distance is justified and agreed to by the department;
- (d) existing and proposed roads;
- (e) other constructed features like railroad, oil and gas wells, pipelines and other utility lines in the immediate area;
- (f) residences and water wells within one mile of the permit area; and
- (g) a uniform base, a scale, and a north directional arrow.
- (5) The application must include a reclamation plan that meets the requirements of 82-4-336, MCA, and this subchapter.
Authorizing statute(s): 82-4-321, MCA
Implementing statute(s): 82-4-335, 82-4-336, MCA
History: Eff. 12/31/72; TRANS, from DSL, 1996 MAR p. 2852; AMD, 1999 MAR p. 640, Eff. 4/9/99; AMD, 2002 MAR p. 3590, Eff. 12/27/02; AMD, 2024 MAR p. 1060, Eff. 5/11/24.