Mo. Code Regs. Ann. tit. 19, § 30-24.030
PURPOSE: The Department of Health has the authority to establish construction standards for psychiatric hospitals. This rule provides procedures to follow in the submission of plans and specifications for new construction.
(1) Preliminary Plans and Sketches.
(A) When construction is contemplated, either for new buildings, additions to existing buildings or material alterations to existing buildings, the preliminary plans or sketches shall be submitted in duplicate to the Department of Health for review and approval, before the preparation of working drawings is undertaken. The preliminary plans may be reviewed by the Department of Health in schematic form, but before they are declared acceptable for procedure with working drawings and specifications, they should also include the following information, stated briefly and not in detailed form required in working drawings and specifications:
street names, topography, walks, drives, fire lanes, parking areas and utilities, including fire hydrant locations;
at a scale of not less than one eighth-inch to one foot no inches (1/8":1' 0");
name and number;
is required;
fy fire doors by time rating and Underwriters’ Laboratories label;
proper shape and scale for positive recognition. Identify special types such as service sinks and clinic sinks. Brief descriptive notes on type of supplies, vacuum breakers, etc., are advisable;
principal items of furniture accurately scaled;
ment such as boilers, chiller, cooling tower, electrical substations, tanks and air handlers, fan-coil units, kitchen equipment, laundry equipment, cabinets, counters and any other items which take up space and affect the final layout;
ignations;
grade lines, designated and preferably dimensioned and with basic elevations shown;
and also of each room for which the regulations establish a minimum ceiling height. Only one (1) typical room of a group need be so shown;
rules establish a minimum area. Only one (1) typical room of a group need be so noted; and
eral construction and finish; the structural system; the heating, ventilating and air-conditioning system, including the fuel supply; the plumbing system, including the water supply and sewage disposal; and the electrical system.
(2) Working Drawings and Specifications.
ing and air conditioning; electrical work and all built-in equipment, including elevators, kitchen equipment, cabinet work, etc.
of the specifications shall identify the project by name and location and shall bear the names and addresses of the architect or professional engineer and the owner.
of specifications shall bear the official seal and signature of the registered architect or registered professional engineer who prepared it.
of specifications shall bear the date of its completion or its latest revision.
same size, securely bound into complete sets, with the sheets in the proper order. The specifications shall be securely bound into complete sets.
with mines or old workings; and whether the site is subject to mineral rights which have not been developed.
AUTHORITY: section 197.080, RSMo Supp. 1993.* This rule previously filed as 13 CSR 50-24.030 and also 19 CSR 10-24.030. Original rule filed Jan. 31, 1974, effective March 1, 1974. Original authority 1953, amended 1993.