Mo. Code Regs. Ann. tit. 10, § 60-13.030
PURPOSE: This rule establishes procedures and requirements for environmental reviews for assistance from the Drinking Water State Revolving Fund program.
(2) Basic Environmental Determinations. There are three (3) basic environmental determinations that will apply to projects proposed to be implemented with assistance from the fund.
(A) Categorical exclusion (CE). The CE determination applies to categories of projects that have been shown over time not to entail significant impacts on the quality of the human environment.
teria may be categorically excluded from formal environmental review requirements:
toward minor rehabilitation of existing facilities, functional replacement of equipment, or toward the construction of related facilities adjoining the existing facilities that do not affect the degree of water treatment or the capacity of the public water system. Examples include rehabilitation of existing equipment and structures, and the construction of small structures on existing sites; or
structures if located entirely in existing rights-of-way that have been previously disturbed and supported by appropriate documentation to verify the rights-of-way location(s) and type(s) of previous disturbance.
that entail—
mains located outside existing rights-of-ways;
cation of an existing water supply source;
percent (30%) in the capacity of the water system;
ulation thirty percent (30%) or greater than the existing population;
tural resources, threatened or endangered species, or other environmentally sensitive areas; and
are known or expected to be not cost-effective or are likely to cause significant public controversy.
(C) Record of Decision (ROD). The ROD may only be based upon an EIS in conformance with the format and guidelines described in subsection (5)(C). An EIS will be required when the director determines any of the following:
the pattern and type of land use or growth and distribution of the population;
ture or facility constructed or operated under the proposed action may conflict with local or state land use plans or policies;
adverse impacts upon—
species or their habitats;
lands, preserves, other public lands, or recognized scenic, recreational, prime farmlands, archeological, or historic value; and
or significantly alter the characteristics of existing residential areas; and
example, through induced development) may have significant adverse effect upon local ambient air quality, local noise levels, surface and groundwater quantity or quality, fish, shellfish, wildlife, or their natural habitats.
(4) Construction Prior to Environmental Review.
(A) A recipient may request advance authority to construct part of the proposed drinking water project prior to completion of the necessary environmental review when that part of the project will—
lem immediately;
tives identified for the complete system;
rect environmental impacts, including those which cannot be acceptably mitigated without completing the entire project; and
(5) Information Required for Environmental Review.
(A) Recipients seeking a CE shall provide the director with sufficient documentation to demonstrate compliance with the criteria of subsection (2)(A). At a minimum, this shall consist of a—
proposed project and its costs;
is cost-effective, and that the recipient is financially capable of constructing, operating, and maintaining the facilities; and
showing—
areas;
tive areas.
(B) An EID shall be submitted by those recipients whose proposed projects do not meet the criteria for a CE and for which the director has made a preliminary determination that an EIS will not be required. The director will provide guidance on both the format and contents of the EID to potential recipients prior to initiation of facilities planning.
EID shall include:
ject;
environmental setting of the project and the future environmental setting without the project;
proposed;
ject;
and alternatives on the user rates;
impacts of the project as proposed including those which cannot be avoided;
short-term uses of the environment and the maintenance and enhancement of long-term productivity;
commitments of resources to the proposed project;
minimize the environmental impacts of the project;
tion activities conducted, issues raised, and changes to the project which may be made as a result of the public participation process; and
with appropriate governmental agencies.
meeting or hearing on the proposed project and the EID, and provide the director with a complete record of the meeting or hearing. The meeting or hearing will be advertised at least thirty (30) days in advance in a local newspaper of general circulation. Included with the meeting record will be a list of all attendees with addresses, any written testimony, and the recipient’s responses to the issues raised.
(C) The format of an EIS shall encourage sound analyses and clear presentation of alternatives, including the no-action alternative and the selected alternative and their environmental, economic, and social impacts. The following format shall be followed by the recipient unless the director determines there are compelling reasons to do otherwise:
ent, the project(s), the program through which financial assistance is requested, and the date of publication;
five to fifteen (5-15) page summary of the critical issues of the EIS in sufficient detail that the reader may become familiar with the proposed project and its cumulative effects. The summary will include:
lem;
potential environmental impacts, mitigative measures, and any areas of controversy; and
tain the following information:
of the purpose and need for the proposed project that clearly identifies its goals and objectives;
alternative considered by the recipient. The descriptions will include the size and location of the facilities and pipelines, land requirements, operation and maintenance requirements, and construction schedules. The alternative of no action will be discussed and the recipient’s preferred alternative(s) will be identified. Alternatives that were eliminated from detailed examination will be presented with the reasons for their elimination;
available to the department including:
the proposed project;
project be modified prior to providing financial assistance to reduce adverse environmental impacts or providing assistance with conditions requiring the implementation of mitigative measures; and
tance;
available to other local, state, and federal agencies which may have the ability to issue or deny a permit, provide financial assistance, or otherwise affect or have an interest in any of the alternatives;
ronment and environmental consequences of each alternative including secondary and cumulative impacts. The affected environment on which the evaluation of each alternative will be based includes, as a partial listing, hydrology, geology, air quality, noise, biology, socioeconomics, land use, and cultural resources of the facilities planning area. The department will provide guidance, as necessary, to the recipient regarding the evaluation of the affected environment. The discussion will present the total impacts of each alternative in a manner that will facilitate comparison. The effects of the no-action alternative must be included to serve as a baseline for comparison of the adverse and beneficial impacts of the other alternatives. A description of the existing environment will be included in the no-action section to provide background information. The detail in which the affected environment is described will be commensurate with the complexity of the situation and the significance of the anticipated impacts;
local, state, and federal agencies and public groups with an interest in the proposed project and be made available to the public for review. The final EIS will include all objections and suggestions made before and during the draft EIS review process along with the issues of public concern expressed by individuals or interested groups. The final EIS must include discussions of any such comments pertinent to the project or the EIS. All commenters will be identified. If a comment has led to a change in either the project or the EIS, the reason should be given. The department will always endeavor to resolve any conflicts that may have arisen, particularly among permitting agencies, prior to the issuance of the final EIS. In all cases, the comment period will be no less than fortyfive (45) days;
reference will be organized into a supplemental information document and be made available for public review upon request. No material may be incorporated by reference unless it is reasonably available for inspection by interested persons within the comment periods specified in paragraph (5)(C)4. and subparagraph (5)(C)7.C.;
tors, either in the service of the recipient or the department, the department will independently evaluate the EIS prior to issuance of the ROD and take responsibility for its scope and contents. The staff who undertake this evaluation will be identified under the list of preparers along with those of the contractor and any other parties responsible for the content of the EIS; and
an EIS is extensive but, depending upon the nature and scope of the proposed project, should be supplemented by the recipient. The following requirements represent the minimum allowable:
that an EIS is required of a proposed project, the department will distribute a notice of intent to prepare an EIS;
of intent has been issued, the director will convene a meeting of the affected federal, state, and local agencies, the recipient and other interested parties to determine the scope of the EIS. A notice of this scoping meeting may be incorporated into the notice of intent or prepared as in paragraph (5)(B)2. of this rule, except that in no case will the notification period be less than forty-five (45) days. As part of the scoping meeting the director will, at a minimum—
issues and analyze in depth the scope of those significant issues in the EIS;
of alternatives to be considered;
agencies and determine the information or analyses that may be needed from cooperating agencies or other parties;
preparation and the public participation strategy;
ment of other laws and regulations; and
between the preparation of the EIS and the completion of the engineering report and any necessary arrangements for coordination of the preparation of both documents; and
director will begin the identification and evaluation of all potentially viable alternatives to adequately address the range of issues developed in the scoping. A summary of this, including a list of the significant issues identified, will be provided to the recipient and other interested parties. Preparation of the EIS will be done at the discretion of the department: directly, by the staff; by consultants to the department; or by a consultant contracted by the recipient subject to approval by the department. In the latter two (2) cases, the consultant will be required to execute a disclosure statement prepared by the department signifying they have no financial or other conflicting interest in the outcome of the project. Both the draft EIS and final EIS will be distributed and made available for public review in a fashion consistent with the requirements of paragraph (5)(B)2. of this rule except that the advertisement and comment period for the public participation will be no less than forty-five (45) days. The department will publish in a newspaper of general circulation in the project area, a notice of availability of the EIS giving locations at which it will be available for public review at least forty-five (45) days prior to making any environmental determination.
(6) Environmental Determination. 10 CSR 60-13
(B) An environmental review of the proposed project, supported by the recipient’s EID, will be conducted by the director to determine whether any significant impacts are anticipated and whether any changes may be made in the proposed project to eliminate significant adverse impacts. As part of this review, the director may require the recipient to submit additional information or undertake additional public participation and coordination to support its environmental determination. Based on the environmental review, the director will prepare a FNSI/EA describing—
posed project;
costs;
reasons for their rejection or acceptance;
mitigative measures; and
sion of financial assistance and any means provided for the monitoring of compliance with the conditions.
(7) Project Modification. Recognizing that a project may be altered at some time after an environmental determination on the project has been issued, the director will provide that, prior to approval, the plans and specifications, loan application and related documents will be examined for consistency with the environmental determination. If inconsistencies are found, the director may revoke a CE and require the preparation of an FNSI/EA or an EIS, or require the preparation of amendments to a FNSI/EA or supplements to an EIS, as appropriate. Based upon the staff’s review of the amended project, the director will—
AUTHORITY: sections 640.100 and 640.107, RSMo 2016.* Emergency rule filed July 15, 1998, effective July 25, 1998, expired Feb. 25, 1999. Original rule filed Aug. 17, 1998, effective April 30, 1999. Amended: Filed June 13, 2018, effective Feb. 28, 2019. *Original authority: 640.100, RSMo 1939, amended 1978, 1981, 1982, 1988, 1989, 1992, 1993, 1995, 1996, 1998, 1999, 2002, 2006, 2012, 2014 and 640.107, RSMo 1998.