Mo. Code Regs. Ann. tit. 10, § 40-4.070
PURPOSE: This rule sets forth the requirements for in situ processing pursuant to section 444.810, RSMo.
(1) Performance Standards.
(B) In situ processing activities shall be planned and conducted to minimize disturbance to the prevailing hydrologic balance by-
or wells, other than as approved in the permit and plan;
into geologic zones or intervals approved as production zones in the permit and plan;
wall of the drill hole and the casing; and
into surface waters.
(D) Each person who conducts in situ processing activities shall prevent flow of the process recovery fluid-
identified in the permit; and
lying aquifers.
(2) Monitoring.
(A) Each person who conducts in situ processing activities shall monitor the quality and quantity of surface and ground water and the subsurface flow and storage characteristics in a manner approved in the permit and plan (under 10 CSR 40-3.200(11)) to measure changes in the quantity and quality of water in
CODEOF STATE REGULATIONS 10 CSR 40-4
surface and ground water systems in the mine plan and in adjacent areas. (B) Air and water quality monitoring shall be conducted in accordance with monitoring programs approved in the permit and plan as necessary according to appropriate federal and state air and water quality standards. Auth: section 444.810, RSMo (1986).’ Original rule filed May 12,1980, effective Sept. 11,198O. *Original authority 1979, amended 1983.