PURPOSE: This rule sets forth the requirements for protection of the hydrologic balance pursuant to sections 444.810 and 444.885.2(10), RSMo.
PUBLISHER’S NOTE: The secretary of state has determined that the publication of the entire text of the material which is incorporated by reference as a portion of this rule would be unduly cumbersome or expensive. This material as incorporated by reference in this rule shall be maintained by the agency at its headquarters and shall be made available to the public for inspection and copying at no more than the actual cost of reproduction. Surface Coal Mining and Related Activities
This note applies only to the reference material. The entire text of the rule is printed here.
(1) General Requirements.
(E) Operations shall be conducted to minimize water pollution and, where necessary, treatment methods shall be used to control water pollution.
mining activities shall emphasize mining and reclamation practices that prevent or minimize water pollution. Changes in flow of drainage shall be used in preference to the use of water treatment facilities.
minimize water pollution include, but are not limited to:
land shaping;
growing stands of temporary vegetation;
water;
or vegetation;
acidand toxic-forming materials; and
in backfill areas.
(1)(E)2. of this rule are not adequate to meet the requirements of this chapter, the person who conducts surface mining activities shall operate and maintain the necessary water treatment facilities for as long as treatment is required under this chapter.
(2) Water Quality Standards and Effluent Limitations.
(A) General Limitations.
turbed area, including disturbed areas that have been graded, seeded, or planted, shall be passed through a siltation structure or a series of siltation structures before leaving the permit area.
ment facilities shall be maintained until the disturbed area has been restored and the vegetation requirements of 10 CSR 40-3.120 are met and the quality of the untreated drainage from the disturbed area meets the applicable state and federal water quality standards and requirements for the receiving stream.
permit and plan from these requirements only when—
the total disturbed area is small; and
face mining activities demonstrates that siltation structures and treatment facilities are not necessary for drainage from the disturbed drainage areas to meet the effluent limitations of the applicable state and federal water quality standards for downstream receiving waters.
disturbed area shall not include those areas in which only diversion ditches, siltation structures, or roads are installed in accordance with this chapter and the upstream area is not otherwise disturbed by the person who conducts the surface mining activities.
section shall be constructed in accordance with section (6) of this rule, in appropriate locations before beginning any surface mining activities in the drainage area to be affected.
of siltation structures is used so as to result in the mixing of drainage from the disturbed areas with drainage from other areas not disturbed by current surface coal mining and reclamation operations, the permittee shall achieve the effluent limitations set forth in the following for all of the mixed drainage when it leaves the permit area.
complies with all federal and state laws, regulations, and limitations of this section. If the pH of water to be discharged from the disturbed area is less than 6.0, an automatic lime feeder or other automatic neutralization process approved in the permit and plan shall be installed, operated, and maintained. The permit and plan may authorize the use of a manual system, if it is found that—
and infrequent treatment requirements to meet applicable standards which do not require use of an automatic neutralization process; and
ensured.
(3) Diversions and Conveyance of Overland Flow and Shallow Groundwater Flow and Ephemeral Streams. Overland flow, including flow through litter and shallow groundwater flow from undisturbed areas, and flow in ephemeral streams, may be diverted away from disturbed areas by means of temporary or permanent diversions, if required or approved in the permit and plan as necessary to minimize erosion, to reduce the volume of water to be treated and to prevent or remove water from contact with acidor toxic-forming materials. The following requirements shall be met for all diversions and for all collection drains that are used to transport water into water treatment facilities and for all diversions of overland and shallow groundwater flow and ephemeral streams:
(F) Diversion design shall incorporate the following:
using standard engineering practices to pass safely the design velocities. Riprap shall comply with the applicable requirements of 10 CSR 40-3.060(2)(B)3., except for sand and gravel;
feet. Protection shall be provided for transition of flows and for critical areas such as swales and curves. Where the area protected is a critical area as determined in the permit and plan, the design freeboard may be increased;
when necessary at discharge points, where diversions intersect with natural streams and exit velocity of the diversion ditch flow is greater than that of the receiving stream;
sary for diversion channel geometry or regrading of the channel shall be disposed of in accordance with 10 CSR 40-3.060;
ance with 10 CSR 40-3.030; and
operated to divert water into underground mines; and
(4) Stream Channel Diversions.
(A) Flow from perennial and intermittent streams within the permit area may be diverted if the diversions—
if the requirements in subsection (18)(A) of this rule are found;
this chapter and 10 CSR 40-4; and
statutes and regulations.
(B) When streamflow is allowed to be diverted, the stream channel diversion shall be designed, constructed, and removed in accordance with the following:
the channel, and the floodplain shall be designed and constructed to remain stable and to prevent, to the extent possible using the best technology currently available, additional contributions of suspended solids to streamflow or to runoff outside the permit area. These contributions shall not be in excess of requirements of state or federal law. Erosion control structures such as channel lining structures shall be used in diversions only when approved in the permit and plan as being necessary to control erosion. These structures shall be approved for permanent diversions only where they are stable and will require infrequent maintenance;
and floodplain configurations shall be adequate to safely pass the peak runoff of a ten- (10-) year, twenty-four- (24-) hour precipitation event for temporary diversions, a one hundred- (100-) year, twenty-four- (24-) hour precipitation event for permanent diversions or larger events required in the permit and plan. However, the capacity of the channel itself should be at least equal to the capacity of the unmodified stream channel immediately upstream and downstream of the diversion; and
stream channel diversions of perennial and intermittent streams shall be certified by a qualified registered professional engineer as meeting the performance standards of this rule and any design criteria set by the director.
(D) When permanent diversions are constructed or stream channels restored, after temporary diversions, the operator shall—
or maintain natural riparian vegetation on the banks of the stream;
natural meandering shape of an environmentally acceptable gradient, as determined in the permit and plan; and
longitudinal profile and cross-section, including aquatic habitats (usually a pattern of riffles, pools and drops rather than uniform depth) that approximate premining stream channel characteristics.
(5) Sediment Control Measures.
(A) Appropriate sediment control measures shall be designed, constructed, and maintained using the best technology currently available to—
tional contributions of sediment to streamflow or to runoff outside the permit area;
state or federal effluent limitations; and
ble.
(B) Sediment control measures include practices carried out within, and adjacent to, the disturbed area. The sedimentation storage capacity of practices in and downstream from the disturbed area shall reflect the degree to which successful mining and reclamation techniques are applied to reduce erosion and control sediment. Sediment control measures consist of the utilization of proper mining and reclamation methods and sediment control practices, singly or in combination. Sediment control methods include:
area at any one (1) time during the mining operation through progressive backfilling, grading and prompt revegetation as required in 10 CSR 40-3.120(1)(B);
promote a reduction in the rate and volume of runoff, in accordance with the requirements of 10 CSR 40-3.110(1);
areas;
areas;
channels or pipes through disturbed areas so as not to cause additional erosion;
dams, mulches, vegetative sediment filters, dugout ponds, and other measures that reduce overland flow velocity, reduce runoff volume, or trap sediment; and
(6) Siltation Structures.
(A) General Requirements. Siltation structures shall be used individually or in series and shall— Surface Coal Mining and Related Activities
of the undisturbed area to be drained into the structure;
disturbed area and out of perennial streams, unless approved in the permit and plan; and
(Q) If a siltation structure has an embankment that is more than twenty feet (20') in height, as measured from the upstream toe of the embankment to the crest of the open channel emergency spillway, unless the emergency spillway is a pipe, where it is measured to the lowest point in the toe of the embankment, or has both an embankment that is five feet (5') or more in height, as measured from the upstream toe of the embankment to the crest of the open channel emergency spillway and a storage volume of twenty (20) acre-feet or more above the upstream toe of the embankment, the following additional requirements shall be met:
cipal and emergency spillways shall be provided to discharge safely the runoff resulting from a one hundred- (100-) year, twentyfour- (24-) hour precipitation event or a larger event required in the permit and plan;
and constructed with a static safety factor of at least one and five-tenths (1.5) or a higher safety factor as required in the permit and plan to ensure stability; 10 CSR 40-3
ed to control seepage along conduits that extend through the embankment; and
Health Administration (MSHA) as published in 30 CFR 77.216 shall be met.
(7) Other Treatment Facilities.
(9) Acidand Toxic-Forming Materials. Drainage from acidand toxic-forming materials into ground and surface water shall be avoided by—
(10) Permanent and Temporary Impoundment.
(B) Permanent impoundments are prohibited unless authorized in the permit and plan upon the basis of the following demonstration:
shall be suitable on a permanent basis for its intended use and discharge of water from the impoundment shall not degrade the quality of receiving waters to less than the water quality standards established pursuant to applicable state and federal laws;
ly stable to support the intended use;
impounded water shall be provided for proposed water users;
in the diminution of the quality or quantity of water used by adjacent or surrounding landowners for agricultural, industrial, recreational, or domestic uses;
nance of structures shall achieve the minimum design requirements applicable to structures constructed and maintained under the Watershed Protection and Flood Prevention Act, P. L. 83-566 (U.S.C. 1006). Requirements for impoundments that meet the size or other criteria of the MSHA, 30 CFR 77.216(a) are contained in United States Soil Conservation Service Technical Release No. 60, Earth Dams and Reservoirs, July 2005, incorporated by reference and published by the USDA, NRCS, Office of the Chief, 1400 Independence Ave., SW, Room 5105-A, Washington, DC 20250. This rule does not incorporate any later amendments or additions to this incorporated material. Requirements for impoundments that do not meet the size or other criteria contained in 30 CFR 77.216(a) are contained in United States Natural Resources Conservation Service, Conservation Practice Standard, POND, No. CODE 378, January 2004, incorporated by reference and published by the Missouri NRCS State Office, Parkade Center, Suite 250, 601 Business Loop 70 West, Columbia, MO 65203-2546. This rule does not incorporate any later amendments or additions to this incorporated material;
quate for its intended purposes; and
the approved postmining land use.
(V) of this rule.
appearance of instability, structural weakness, or other hazardous condition and shall include statements on:
cedures and instrumentation;
impounded waters at the time of the initial certification report or the average and maximum depth and elevations of any impounded waters over the past year for the annual certification reports;
or embankment;
tion material up to the date of the initial certification or over the past year for the annual certification reports; and
embankment affecting stability, including structural weakness, erosion, and other hazardous conditions.
(L) Stability.
or C criteria for dams in TR-60, or the size or other criteria of 30 CFR 77.216(a) shall have a minimum static safety factor of 1.5 for a normal pool with steady state seepage saturation conditions, and a seismic safety factor of at least 1.2.
graph 40-3.040(10)(L)1. of this section, except for a coal mine waste impounding structure, shall have a minimum static safety factor of 1.3 for a normal pool with steady state seepage saturation conditions or meet the requirements of Natural Resources Conservation Service, Conservation Practice Standard, POND No. CODE 378, December 1998, and be less that twenty feet (20') feet in height.
(N) Foundation.
impounding structure shall be stable during all phases of construction and operation and shall be designed based on adequate and accurate information on the foundation conditions. For an impoundment meeting the Class B or C criteria for dams in TR-60, or the size or other criteria of 30 CFR 77.216(a), foundation investigation, as well as any necessary laboratory testing of foundation material, shall be performed to determine the design requirements for foundation stability.
shall be removed and foundations excavated and prepared to resist failure. Cutoff trenches shall be installed if necessary to ensure stability.
(O) Spillways. An impoundment shall have either a combination of principal and emergency spillways, a single spillway configured as specified in 10 CSR 40-3.040(10)(O)1. of this section, or no spillways as specified in 10 CSR 40-3.040(10)(O)3. of this section. The impoundment shall be designed and constructed to safely pass or contain the applicable design precipitation event specified in 10 CSR 40-3.040(10)(O)2. or 3. of this section.
be utilized if it is—
designed to carry sustained flows; or
to carry short-term, infrequent flows at nonerosive velocities where sustained flows are not expected.
3.040(10)(O)3. of this section, the required design precipitation event for an impoundment meeting the spillway requirements of 10 CSR 40-3.040(10)(O) of this section is—
Class B or C criteria for dams in TR-60, the emergency spillway hydrograph criteria in the “Minimum Emergency Spillway Hydrologic Criteria” table in TR-60;
exceeding the size or other criteria of 30 CFR 77.216(a), a one hundred- (100-) year twenty-four- (24-) hour event or greater as specified by the director or commission; or
in 10 CSR 40-3.040(10)(O)2.A. and B. of this section, as specified in Table 3 of the 10 CSR 40-3
Natural Resources Conservation Service, Conservation Practice Standard, POND, No. CODE 378, December 1998.
solely on storage capacity to control the runoff from the design precipitation event may be utilized with no spillway when it is demonstrated by the operator and certified by a qualified registered professional engineer that the impoundment will safely contain the design precipitation event, and that the stored water will be safely removed in accordance with current, prudent, engineering practices. Such an impoundment must be located where failure would not be expected to cause loss of life or serious property damage.
Natural Resources Conservation Service Class B or C criteria for dams in TR-60, or the size or other criteria of 30 CFR 77.216(a) shall be designed to safely contain the runoff of the probable maximum precipitation (PMP) of a six- (6-) hour event.
paragraph 10 CSR 40-3.040(10)(O)3.A. of this section shall be designed to control the precipitation of the one hundred- (100-) year twenty-four- (24-) hour event.
(11) Groundwater Protection.
(12) Protection of Groundwater Recharge Capacity. Surface mining activities shall be conducted in a manner that facilitates reclamation which will restore approximate premining recharge capacity through restoration of the capability of the reclaimed areas as a whole, excluding coal-processing waste and underground development waste disposal areas and fills, to transmit water to the groundwater system. The recharge capacity shall be restored to a condition which—
(13) Surface Water and Groundwater Monitoring.
(A) Groundwater.
subsurface flow and storage characteristics, and the quality of groundwater shall be monitored in a manner approved in the permit and plan, to determine the effects of surface mining activities on the recharge capacity of reclaimed lands and on the quantity and quality of water in groundwater systems in the mine plan and adjacent areas.
be submitted every three (3) months to the director or more frequently as prescribed by the director. Monitoring reports shall include analytical results from each sample taken during the reporting period. When the analysis of any groundwater sample indicates noncompliance with the permit conditions, the operator shall promptly notify the director and take remedial measures provided for in 10 CSR 40-6.050(9) and 10 CSR 40- 6.070(14).
ceed through mining and continue during reclamation until bond release. Consistent with the procedures of 10 CSR 40-6.090, the director may modify the monitoring requirements, including the parameters covered and the sampling frequency, if the operator demonstrates, using the monitoring data obtained under this paragraph, that—
disturbance to the prevailing hydrologic balance in the permit and adjacent areas and prevented material damage to the hydrologic balance outside the permit area; water quantity and quality are suitable to support approved postmining land uses and the water rights of other users have been protected or replaced; or
sary to achieve the purposes set forth in the monitoring plan approved under 10 CSR 40- 6.050(9)(C).
affect the groundwater systems serving as aquifers which significantly ensure the hydrologic balance of water use on or off the mine plan area, groundwater levels and groundwater quality shall be periodically monitored. Monitoring shall include measurements from a sufficient number of wells and mineralogical and chemical analyses of aquifer, overburden, and spoil that are adequate to reflect changes in groundwater quantity and quality resulting from those activities. Monitoring shall be adequate to plan for modification of surface mining activities, if necessary, to minimize disturbance of the prevailing hydrologic balance.
mit and plan, the person who conducts surface mining activities shall conduct additional hydrologic tests, including drilling, infiltration tests, and aquifer tests and shall submit the results to the director, to demonstrate compliance with sections (11)–(13) of this rule.
(B) Surface Water.
conducted in accordance with the monitoring program submitted under 10 CSR 40- 6.050(9)(C)4. and approved in the permit and plan. The permit and plan shall set forth the nature of data, frequency of collection, and reporting requirements. Monitoring shall—
and record water quantity and quality of the discharges from the permit area;
of the sample collections indicate noncompliance with a permit condition or applicable standard; the person who conducts the surface mining activities shall notify the director within five (5) days. Where a National Pollutant Discharge Elimination System (NPDES) permit effluent limitation noncompliance has occurred, the person who conducts surface mining activities shall forward the analytic results concurrently with the written notice of noncompliance; and
director, to include analytical results from each sample taken during the quarter. Any sample results which indicate a permit violation will be immediately reported to the director as provided for in 10 CSR 40- 6.050(9) and 10 CSR 40-6.120(5). In those cases where the discharge for which water monitoring reports are required is also subject to regulation by an NPDES permit issued under the Clean Water Act of 1977 (30 U.S.C. Sections 1251–1378) and where the permit includes provisions for equivalent reporting requirements and requires filing of water monitoring reports within ninety (90) days or less of sample collection, the following alternative procedure shall be used. The person who conducts the surface mining activities shall submit to the director on the same time schedule as required by the NPDES permit or within ninety (90) days following sample collection, whichever is earlier, either:
ing form filed to meet NPDES permit requirements; or
federal government official with whom the reporting form was filed to meet NPDES permit requirements and the date of filing.
regraded and stabilized according to this chapter, the person who conducts surface mining activities shall monitor surface water flow and quality. Data from this monitoring may be used to demonstrate that the quality and quantity of runoff without treatment is consistent with the requirements of this chapter to minimize disturbance to the prevailing hydrologic balance and to attain the approved postmining land use. These data may also provide a basis for approval by the commission or director for removal of water quality or flow control systems.
devices necessary to accurately measure and sample the quality and quantity of surface water discharges from the disturbed area shall be properly installed, maintained, and operated and shall be removed when no longer required.
(14) Transfer of Wells.
(B) Upon an approved transfer of a well, the transferee shall—
to persons or property from the well;
no case later than abandonment of the well; and
compliance with 10 CSR 40-3.020 and those of the Wellhead Protection Section, Division of Geology and Land Survey, at 10 CSR 23 Chapter 3 with respect to the well.
from an underground or surface source, where the water supply has been affected by contamination, diminution, or interruption proximately resulting from the surface mining activities.
(16) Discharge of Water into an Underground Mine. Surface water shall not be diverted or otherwise discharged into underground mine workings, unless allowed by section 577.155, RSMo, and the person who conducts the surface mining activities demonstrates in the permit and plan application that this will—
(18) Stream Buffer Zones.
(A) No land within one hundred feet (100') of a perennial stream or an intermittent stream shall be disturbed by surface mining activities, unless the director specifically authorizes surface mining activities closer to, or through, a perennial stream. The director may authorize these activities only upon finding that—
cause or contribute suspended solids to stream flow or runoff outside the permit area in excess of the requirements established by the Missouri Clean Water Commission, Department of Natural Resources, set forth in 10 CSR 20-7.015 and promulgated by the federal government set forth in the Federal Water Pollution Control Act P.L. 92-500 and all modifications to these laws and regulations;
adversely affect the water quantity and quality or other environmental resources of the stream; and
nent stream channel diversion, it will comply with section (4).
AUTHORITY: sections 444.530 and 444.810, RSMo 2000.* Original rule filed Oct. 12, 1979, effective Feb. 11, 1980. Amended: Filed April 14, 1980, effective Aug. 11, 1980. Amended: Filed Feb. 9, 1981, effective July 11, 1981. Amended: Filed April 2, 1986, effective July 26, 1986. Amended: Filed Sept. 15, 1988, effective Jan. 15, 1989. Amended: Filed July 3, 1990, effective Nov. 30, 1990. Amended: Filed May 15, 1992, effective Jan. 15, 1993. Amended: Filed Sept. 15, 1994, effective April 30, 1995. Amended: Filed March 21, 2000, effective Oct. 30, 2000. Amended: Filed Dec. 17, 2012, effective July 30, 2013. *Original authority: 444.530, RSMo 1971, amended 1983, 1990, 1993, 1995; and 444.810, RSMo 1979, amended 1983, 1993, 1995.