PURPOSE: This rule complies with section 444.535.1(4), RSMo by setting forth the requirements for handling topsoil in the mining reclamation process.
- (1) General. To prevent topsoil from being contaminated by spoil or waste materials, the operator shall remove the topsoil as a separate operation from areas to be disturbed. Topsoil shall be immediately redistributed according to the requirements of section (3) of this rule on areas graded to the approved postmining configuration. The topsoil shall be segregated, stockpiled and protected from wind and water erosion, and from contaminants which lessen its capability to support vegetation if sufficient graded areas are not immediately available for redistribution.
(2) Topsoil Removal. All topsoil to be salvaged shall be removed before any drilling for blasting, mining or other surface disturbance.
- (A) All topsoil shall be removed unless use of alternative materials is approved in the reclamation plan in accordance with subsection (2)(D) of this rule. Where the removal of topsoil will result in erosion that may cause air or water pollution, the director shall limit the size of the area from which topsoil may be removed at any one time and specify methods of treatment to control erosion of exposed overburden.
- (B) All of the A horizon of the topsoil as identified by soil surveys shall be removed according to this section and then replaced on disturbed areas as the surface soil layer. Where the A horizon is less than six inches (6"), a six (6)-inch layer that includes the A horizon and the unconsolidated material immediately below the A horizon (or all unconsolidated material if the total available is less than six inches (6")) shall be removed and the mixture segregated and replaced as the surface soil layer.
- (C) Where necessary to obtain soil productivity consistent with postmining land use, the reclamation plan shall provide that the B horizon or portions of the C horizon or other underlying layers demonstrated to have comparable quality for root development be segregated and replaced as subsoil.
(D) Selected overburden materials may be used instead of, or as a supplement to, topsoil where the resulting soil medium is equal to or more suitable for vegetation and if all the following requirements are met:
- 1. The operator demonstrates in the
reclamation plan that the selected overburden materials or an overburden-topsoil mixture is more suitable for restoring land capability and productivity by the results of chemical and physical analyses. These analyses shall include determinations of pH, percent organic material, nitrogen, phosphorus, potassium, texture class and water holding capacity. The reclamation plan may also require that results of field-site trials or greenhouse tests be used to demonstrate the feasibility of using overburden materials;
- 2. The chemical and physical analyses
and the results of field-site trials or greenhouse tests are accompanied by a certification from a qualified soil scientist or agronomist; and
- 3. The alternative material is removed,
segregated and replaced in conformance with this section.
(3) Topsoil Redistribution.
- (A) After final grading and before the topsoil is replaced, regraded land shall be scarified or otherwise treated to eliminate slippage surfaces and to promote root penetration.
(B) Topsoil shall be redistributed in a manner that—
- 1. Achieves an approximate uniform
thickness consistent with the postmining land uses;
- 2. Prevents excess compaction of the
spoil and topsoil; and
- 3. Protects the topsoil from wind and
water erosion before it is seeded and planted.
- (4) Topsoil Storage. If the reclamation plan allows storage of topsoil, the stockpiled topsoil shall be placed on a stable area within the permit area where it will not be disturbed or be exposed to excessive water, wind erosion or contaminants which lessen its capability to support vegetation before it can be redistributed on terrain graded to final contour. Stockpiles shall be selectively placed and protected from wind and water erosion, unnecessary compaction and contamination by undesirable material either by a vegetative cover as defined in 10 CSR 40-2.090(7) or by other methods demonstrated to provide equal protection such as snow fences, chemical binders and mulching. Unless approved in the reclamation plan, stockpiled topsoil shall not be moved until required for redistribution on a disturbed area.
- (5) Nutrients and Soil Amendments. Nutrients and soil amendments in the amounts and analyses as determined by soil tests shall be applied to the surface soil layer so that it will support the postmining requirements of 10 CSR 40-2.030 and the revegetation requirements of 10 CSR 40-2.090.
AUTHORITY: section 444.535.1(4), RSMo 1986.* Original rule filed July 13, 1978, effective Jan. 13, 1979. *Original authority: 444.535, RSMo 1978, amended 1988.