Mo. Code Regs. Ann. tit. 10, § 40-10.020
PURPOSE: This rule complies with sections 444.772, 444.774 and 444.778, RSMo by setting forth the requirements for surface mine operators to obtain the necessary permit from the Land Reclamation Commission.
(2) As required by section 444.772, RSMo, an applicant shall provide a complete application package submitted which includes the following:
(A) A completed application form supplied by the commission signed and dated by an officer of the applicant or other authorized representative of the applicant. The form shall contain at least the following information:
of the operation;
office address of the applicant;
the application;
quarter, one-quarter (1/4, 1/4) section and the estimated number of acres of any land to be affected by surface mining by the applicant during the succeeding twelve (12)-month term of the permit;
right to mine the land affected by the permit;
or any person associated with the applicant in a management function holds or has held that have been issued by the Land Reclamation Program. The definition of “person associated with the applicant in a management function” means any proprietorship, subsidiary corporation, parent corporation, sister corporation, successor corporation, or the applicant’s officers and directors if the applicant is a corporation and includes all partners if the applicant is a partnership;
with the applicant in a management function responsible for compliance with sections 444.500 to 444.790, RSMo; and
(D) A plan of operation and reclamation which meets the requirements of 444.760–444.790, RSMo.
operators shall include:
ability, removal and storage as outlined in 10 CSR 40-10.050(6);
spoil placement and disposal;
acid materials, if applicable; and
and arrangement of the pit if not delineated clearly on the map submitted with the application.
mation and operation plan for the lands and water within the proposed permit area.
a minimum:
tion and the seeding/planting rates;
seeding/planting;
references to support revegetation methods;
topsoiling and revegetation schedules as outlined in 10 CSR 40-10.050(10); and
reclaimed to and the acreage of each.
describe what measures will be taken to minimize impacts on the stream environment, that is, how they will follow the requirements of 10 CSR 40-10.050(14), (15) and (16).
short-term or long-term plan for operations and reclamation. A short-term plan shall describe, at a minimum, the activities required by the operation and reclamation plan outlined in this subsection, which will occur over the one (1)-year term of the permit. A long-term plan shall describe, at a minimum, the activities required by the operation and reclamation plan outlined in this subsection which will occur over more than one (1) year. Permits having long-term operation plans will be issued for one (1)-year terms, except that, upon renewal, the applicant is not required to resubmit an operation plan, provided that the operations will continue to be conducted in the manner originally proposed. Also, the operator only must acquire a permit for the portion of the area included in the long-term plan which will be affected over the upcoming one (1)-year term of the permit. But, in no instance shall the operator affect any area outside of the area included in the current approved permit;
(E) Two (2) different maps sufficient for the following purposes:
distinguish the mining site from other mine sites in the general area of the county;
detail to illustrate the following:
nesses having any surface or subsurface interest in the lands to be mined, including owners or leaseholders of the land and utilities as well as the names of all record landowners of real property located contiguous or adjacent to the proposed mine plan area:
contact, touching along a boundary or at a point;
ately opposite from, as in across a road rightof-way, or across a river or stream;
clude the names of any record landowners of contiguous real property or real property located in an adjacent state, but only land located in the state of Missouri;
each site, if proposing multiple sites, of all areas proposed to be affected over the permit term;
roads located in or within one hundred feet (100') of the proposed permit area;
pared, a north arrow and section, township and range lines;
being mined, if an in-stream operation is proposed;
original or clearly copied United States Geological Survey (USGS) seven and onehalf (7 1/2) minute topographical map, county assessor map, Agricultural Stabilization Conservation Service (ASCS) aerial photos or up-to-date county ownership plats or on a map of equal or better quality; and
ways, diversions and post-mining land use designations shall be identified on the permit map;
must be clearly legible and must contain the company name, mine or site name, date of last map edit, scale indication (such as a scale bar or numerical ratio) and a symbol definition key for any special symbols used; and
a portion of the area described in a long-term operation and reclamation plan, the applicant shall indicate the boundary of the proposed permit area and the boundary of the area proposed to be disturbed over the life of the mine on the map required by paragraph (2)(E)2. of this rule;
(F) All required fees based upon the type of operation and amount of production as follows:
dollars ($500).
on a permit of three hundred dollars ($300). If surface mining operations are not conducted at a site for a total of six (6) months or more during any one (1) permit year, the fee for such site for that year shall be reduced by fifty percent (50%) or to the amount of one hundred fifty dollars ($150).
bonded by the operator of five dollars ($5) per acre for each acre permitted.
operation where the annual tonnage of gravel mined by such operator is less than five thousand (5,000) tons, the total cost of submitting an application shall be three hundred dollars ($300).
permit be more than two thousand five hundred dollars ($2,500).
ber 31, 2007;
transferring the permit to a new operator, as defined in sections (5)–(7) of this rule. Public notices shall not be required for renewing existing permits or to permit additional acreage within a currently approved longterm operation and reclamation plan, as defined in paragraph (2)(D)6. of this rule. The notice must contain the following:
face mining specifying the mineral and estimated period of operation;
tor;
consisting of county, section, township and range;
written comments or a request for a hearing and/or an informal public meeting may be made by any person with a direct, personal interest in one or more of the factors that the Missouri Land Reclamation Commission may consider in issuing a permit as required by The Land Reclamation Act, sections 444.760 to 444.790, RSMo, or whose health, safety or livelihood will be unduly impaired by the issuance of a permit regarding items such as permitting and reclamation requirements, erosion and siltation control, excavations posing a threat to public safety, or protection of public road rights-of-way. If a hearing is held the commission has the ability to consider if the applicant has demonstrated a pattern of noncompliance with other environmental protection laws and regulations administered by the Missouri Department of Natural Resources. Written comments shall be sent to the Director of Staff, Land Reclamation Program, Department of Natural Resources, at the program’s latest mailing address. All comments and requests for hearings and/or public meetings must be submitted in writing to the director’s office within fifteen (15) days of the last date of publication of the notice;
(I) At the time the application is deemed complete by the director, the applicant shall also mail letters containing a notice of intent to operate a surface mine.
containing a notice of intent to operate a surface mine by certified mail to:
ties or cities in which the proposed area is located; and
record landowners of contiguous real property or real property located adjacent to the proposed mine plan area.
this subsection shall be the same as the public notice requirements under subsection (2)(H) of this rule; and
(J) The applicant shall submit proof that:
rule have been sent to all applicable parties, as listed above. Receipts showing that all parties have been properly served shall be submitted to the program to verify delivery; and
properly by submitting copies of the affidavits of publication that states the newspaper has complied with section 493.050, RSMo.
applicant prior to the director making a recommendation for approval or denial of the permit.
(3) As required by section 444.772, RSMo, any mining permit covering affected land that has not been totally reclaimed and released from liability prior to permit expiration must be renewed annually.
(7) If at any time during the permit term an operator wishes to revise the methods described in an approved operation and reclamation plan, the operator may file a revision to the plan. A revision must include:
AUTHORITY: section 444.530, RSMo 2000.* Original rule filed Aug. 2, 1991, effective Feb. 6, 1992. Amended: Filed June 1, 1994, effective Nov. 30, 1994. Amended: Filed March 15, 2002, effective Oct. 30, 2002. Amended: Filed Dec. 16, 2003, effective Sept. 30, 2004. Amended: Filed April 1, 2004, effective May 30, 2005.
*Original authority: 444.530, RSMo 1971, amended 1983, 1990, 1993, 1995.