Mo. Code Regs. Ann. tit. 10, § 26-2.040
General Requirements for Release Detection for All In-Use Underground Storage Tank Systems
Effective May 30, 2017sections 319.105, 319.107, 319.111, and 319.137, RSMo 2016.* This rule originally filed as 10 CSR 20-10.040. Original rule filed April 2, 1990, effective Sept. 28, 1990. Amended: Filed Aug. 3, 1993, effective April 9, 1994. Moved and amended: Filed April 15, 2011, effective Dec. 30, 2011. Amended: Filed Aug. 15, 2016, effective May 30, 2017. *Original authority: 319.105, RSMo 1989; 319.107, RSMo 1989, amended 1994; 319.111, RSMo 1989; and 319.137, RSMo 1989, amended 1993, 1995, 2004. Substance Storage TanksPetroleum and Hazardous Substance Storage Tanks
PURPOSE: This rule outlines the minimum requirements for leak and spill detection systems.
(1) Owners and operators of underground storage tank (UST) systems that are in-use must use a method, or combination of methods, of release detection that—
- (A) Can detect a release from any portion of the tank and the connected underground piping that routinely contains a regulated substance, except remote fills and gravity piping;
- (B) Is installed, calibrated, operated, tested, and maintained in accordance with the manufacturer’s instructions, including routine maintenance and service checks for operability or running condition. If manufacturer’s operability test procedures are not available, the annual operability test may be conducted in accordance with a code of practice developed by a nationally recognized association or independent testing laboratory or a method approved by the department. Operability test reports must, at a minimum, include facility name and address, components tested, model and serial number (if legible), testing date, test method, technician name and affiliation, and a certification of results;
(C) The first operability test is due not later than January 1, 2020 or immediately upon installation if installed after July 1, 2017. Electronic and mechanical release detection equipment must be tested annually for proper operation, in accordance with subsection (B) of this section. A test of the proper operation must be performed at least annually and, at a minimum and as applicable to the facility, cover the following components and criteria:
- 1. Automatic tank gauge and other con-
trollers: test alarm; verify system configuration; test battery backup unless records are electronically stored at a remote location;
- 2. Probes and sensors: inspect for resid-
ual buildup; ensure floats move freely; ensure shaft is not damaged; ensure cables are free of kinks, bends, and breaks; test alarm operability and communication with controller; and
- 3. Vacuum pumps and pressure gauges:
ensure proper communication with sensors and controller;
- (D) Meets the performance requirements for tanks in 10 CSR 26-2.043 or 10 CSR 26- 2.046 for field-constructed tanks, or for piping in 10 CSR 25-2.044 or 10 CSR 26-2.047 for bulk piping, with any performance claims and their manner of determination described in writing by the equipment manufacturer or installer. In addition, all release detection methods must be capable of detecting the leak rate or quantity specified for the method in 10 CSR 26-2.043, 10 CSR 26-2.044, 10 CSR 26-2.046, or 10 CSR 26-2.047, as appropriate, with a probability of detection of ninetyfive percent (95%) and a probability of false alarm of five percent (5%); and
- (E) All release detection methods and equipment must be conducted and operated in accordance with the applicable National Work Group on Leak Detection Evaluations listing, unless otherwise approved by the department. To obtain copies of equipment listings, contact the National Work Group on Leak Detection Evaluations, www.nwglde.org.
- (2) When a release detection method for tanks in 10 CSR 26-2.043 or 10 CSR 26- 2.046 or for piping in 10 CSR 26-2.044 or 10 CSR 26-2.047 indicates a release may have occurred, owners and operators must notify the department in accordance with 10 CSR 26-2.050–10 CSR 26-2.053.
AUTHORITY: sections 319.105, 319.107, 319.111, and 319.137, RSMo 2016.* This rule originally filed as 10 CSR 20-10.040. Original rule filed April 2, 1990, effective Sept. 28, 1990. Amended: Filed Aug. 3, 1993, effective April 9, 1994. Moved and amended: Filed April 15, 2011, effective Dec. 30, 2011. Amended: Filed Aug. 15, 2016, effective May 30, 2017. *Original authority: 319.105, RSMo 1989; 319.107, RSMo 1989, amended 1994; 319.111, RSMo 1989; and 319.137, RSMo 1989, amended 1993, 1995, 2004. Substance Storage Tanks