PURPOSE: This rule sets forth standards for generators of hazardous waste, incorporates 40 CFR part 262 by reference, and sets forth additional state standards.
PUBLISHER’S NOTE: The secretary of state has determined that the publication of the entire text of the material which is incorporated by reference as a portion of this rule would be unduly cumbersome or expensive. This material as incorporated by reference in this rule shall be maintained by the agency at its headquarters and shall be made available to the public for inspection and copying at no more than the actual cost of reproduction. This note applies only to the reference material. The entire text of the rule is printed here.
(2) A generator located in Missouri, except as conditionally exempted in accordance with 10 CSR 25-4.261, shall comply with the requirements of this section in addition to the requirements incorporated in section (1). Where contradictory or conflicting requirements exist in 10 CSR 25, the more stringent shall control. (Comment: This section has been organized so that all Missouri additions, changes, or deletions to any subpart of the federal regulations are noted within the corresponding subsection of this section.)
(A) General. The following registration requirements are additional requirements to, or modifications of, the requirements specified in 40 CFR part 262 subpart A:
a generator located in Missouri shall comply with the following requirements:
month or accumulating at any one (1) time the quantities of hazardous waste specified in 10 CSR 25-4.261 and a transporter who is required to register as a generator under 10 CSR 25-6.263 shall register and is subject to applicable rules under 10 CSR 25-3.260–10 CSR 25-9.020 and 10 CSR 25-12.010; and
may choose to register and obtain Environmental Protection Agency (EPA) and Missouri identification numbers, but in doing so will be subject to any initial registration fee and annual renewal fee outlined in this chapter;
storage, disposal, or resource recovery facility who ships hazardous waste from the facility shall comply with this rule;
dure for registering:
ter shall file a completed registration form furnished by the department. The department shall require an original ink signature on all registration forms before processing. In the event the department develops the ability to accept electronic submission of the registration form, the signature requirement will be consistent with the legally-accepted standards in Missouri for an electronic signature on documents. All generators located in Missouri shall use only the Missouri version of the registration form; 10 CSR 25-5
also complete and file an updated generator registration form if the information filed with the department changes;
tional information, including information concerning the nature and hazards associated with a particular waste or any information or reports concerning the quantities and disposition of any hazardous wastes as necessary to authorize storage, treatment, or disposal and to ensure proper hazardous waste management;
ter, and those conditionally-exempt generators who choose to register, shall pay a one hundred dollar ($100) initial or reactivation registration fee at the time their registration form is filed with the department. If a generator site has an inactive registration, and a generator required to register reactivates that registration, the generator shall file a registration form and pay the one hundred dollar ($100) registration reactivation fee. The department shall not process any form for an initial registration or reactivation of a registration if the one hundred dollar ($100) fee is not included. Generators required to register shall thereafter pay an annual renewal fee of one hundred dollars ($100) in order to maintain their registration in good standing; and
tion fee with what is found to be an insufficient check shall have their registration immediately revoked;
dure for registration renewal:
the annual registration period;
will be sent by December 1 of each year to all generators holding an active registration;
between October 1 and December 31 of any given year shall pay the initial registration fee, but shall not pay the annual renewal fee for the calendar year immediately following their initial registration. From that year forward, they shall pay the annual renewal fee;
who fails to pay the annual renewal fee by the due date specified on the billing shall be administratively inactivated and subject to enforcement action for failure to properly maintain their registration;
vated for failure to pay the renewal fee in a timely manner, who later in the same registration year pay the annual renewal fee, shall pay the fifteen percent (15%) late fee required by section 260.380.4, RSMo, in addition to the one hundred dollar ($100) annual renewal fee for each applicable registration year and shall file an updated generator registration form with the department before their registration is reactivated by the department;
registration be made inactive rather than pay the renewal fee, who later in that same renewal year pay the annual renewal fee to reactivate their registration, shall pay the fifteen percent (15%) late fee required by section 260.380.4, RSMo, in addition to the one hundred dollar ($100) annual renewal fee and file an updated generator registration form with the department before their registration is reactivated by the department; and
renewal fee with what is found to be an insufficient check shall have their registration immediately revoked; and
inactivate the registration of generators that fail to pay any applicable hazardous waste fees and taxes in a timely manner after appropriate notice to do so.
(B) The Manifest. Additional manifest and reporting requirements are set forth in subsections (2)(D) and (E). This subsection is applicable to all Missouri generators and to all other generators who deposit hazardous waste in Missouri. (Note: This section is not applicable to an out-of-state or international generator who is shipping hazardous waste through, in less than ten (10) days, but not depositing hazardous waste in Missouri. This subsection does not prevent a transporter from voluntarily carrying information in addition to the manifest. Any reference to the United States Environmental Protection Agency (EPA) form 8700-22 means the form as revised by EPA and approved by the federal Office of Management and Budget (OMB)).
total weight in kilograms or pounds or the specific gravity for wastes listed or measured in gallons, liters, or cubic yards.
sets forth additional requirements for manifest reporting. The generator shall contract with the designated facility to return the completed manifest to the generator within thirtyfive (35) days after the hazardous waste was accepted by the initial transporter.
(C) Pretransport, Containerization, and Labeling Requirements.
to accumulate hazardous waste in accordance with the requirements in 40 CFR 262.34(a)(2), (a)(3), and (d)(4), generators must also comply with either subparagraphs A. or B. below.
hazardous waste must be labeled in accordance with applicable United States Department of Transportation labeling requirements in 49 CFR part 172 subpart E during the entire time the waste is accumulated on-site. If a generator determines that labeling a container with a capacity of less than one (1) gallon is not feasible, the generator shall affix the appropriate label(s) to the locker, rack, or other device used to hold or accumulate any such container; or
words that correctly identify the hazards of the contents of the container during the entire on-site storage period. Such words shall include one (1) or more of the following as defined in 40 CFR part 261 subparts C and D: Ignitable, Toxic, Corrosive, or Reactive. The label shall be white with black lettering or black with white lettering that is a minimum of one (1) inch in height. If a generator determines that labeling a container with a capacity of less than one (1) gallon is not feasible, the generator shall affix the appropriate label(s) to the locker, rack, or other device used to hold or accumulate any such container. Note that pursuant to 49 CFR 172.401, “No person may offer for transportation and no carrier may transport a package bearing any marking or label which by its color, design, or shape could be confused with or conflict with a label prescribed by this part.”
for tanks used to accumulate hazardous waste in accordance with the requirements of 40 CFR 262.34(a)(3) and (d)(4), generators must also comply with the 2012 Edition of the National Fire Protection Association Standard NFPA 704: Standard System for the Identification of the Hazards of Materials for Emergency Response to identify the hazards of the tank contents. The 2012 edition of NFPA 704 is hereby incorporated by reference without any subsequent amendments or additions, and is published by the National Fire Protection Association, 1 Battery March Park, Quincy, MA, 02169-7471.
tive to compliance with the accumulation limits in 40 CFR 262.34(c)(1), generators who instead wish to store up to fifty-five (55) gallons of each non-acute hazardous waste stream, or up to one (1) quart of each acutely hazardous waste stream in a satellite accumulation area may do so if they comply with the other applicable requirements of 40 CFR 262.34(c) and the following additional requirements:
department that it has chosen to comply with the additional requirements in this section and must also re-notify at any time it changes this decision. Such notification must be made by submitting an updated Notification of Regulated Waste Activity Form. All satellite accumulation areas at the generator’s location must operate under the same requirements;
than one (1) container per wastestream;
with its beginning date of satellite storage;
stored in a satellite accumulation area pursuant to this paragraph 3. shall be removed from the satellite accumulation area within three (3) calendar days if any of the following occurs:
the accumulation start date;
volume limit.
removed from the satellite accumulation area pursuant to subparagraph D. above must be taken to the generator storage area, shipped off-site for proper hazardous waste management, or managed in accordance with an approved hazardous waste permit or certification at the site.
during the three (3) day period referenced in subparagraph D. above, the generator may start a new satellite container for that wastestream if in compliance with all other requirements of paragraph 3. and 40 CFR 262.34(c)(1) as modified by this paragraph 3.
porated in this rule.
than six thousand (6000) kilograms of ignitable or reactive hazardous waste may elect to comply with 10 CSR 25-7.264(2)(I) in lieu of 40 CFR 265.176.
(D) Record Keeping and Reporting. In addition to requirements in 40 CFR 262.40, generators shall retain registration information required in subsection (2)(A) of this rule and the Generator’s Hazardous Waste Summary Report required in paragraph (2)(D)1. of this rule for no fewer than three (3) years.
ments for quarterly Generator’s Hazardous Waste Summary Reports.
register in accordance with subsection (2)(A) of this rule shall complete a Generator’s Hazardous Waste Summary Report. This report shall be completed on a form provided by the department or on a reproduction of the form provided by the department or in the same format as the form provided by the department after review and approval by the department.
ardous wastes or who make only one (1) shipment of hazardous waste during the entire reporting year, July 1 through June 30, or are defined as a small quantity generator for the entire reporting year, or are defined as a large quantity generator and filing their report electronically in a manner prescribed by the department, may file an annual report by August 14 following the reporting year period. However, persons who are defined as a large quantity generator and have more than one (1) shipment of hazardous waste during the reporting years, and do not file their report using the electronic method prescribed by the department, shall file quarterly. Large quantity generators may submit an annual report electronically beginning with the reporting period of July 1, 2015-June 30, 2016, or sooner if the system for electronic reporting is in place prior to that reporting period.
the department shall report the quantity, type, and status of all hazardous waste(s) shipped off-site during the reporting period on the Generator’s Hazardous Waste Summary Report regardless of the destination of the shipment(s).
Summary Report shall be signed and certified by an authorized representative as defined in 40 CFR 260.10 incorporated by reference in 10 CSR 25-3. The certification statement shall read as follows: “CERTIFICATION: I certify under penalty of law that I personally examined and am familiar with the information submitted on this form and all attached documents and, based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the submitted information is true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.” The handwritten signature of the authorized representatives shall follow this certification.
completed Generator’s Hazardous Waste Summary Report within forty-five (45) days after the end of each reporting period. The reporting periods and submittal dates are as follows: January 1 through March 31, with a submittal date of May 14 of the same year; April 1 through June 30, with a submittal date of August 14 of the same year; July 1 through September 30, with a submittal date of November 14 of the same year; and October 1 through December 31, with a submittal date of February 14 of the following year.
mation required in 40 CFR 261.4(e)(2)(v)(C) incorporated by reference in 10 CSR 25- 4.261(1) to the department along with the completed Generator’s Hazardous Waste Summary Report.
reports required by this rule shall have their registration administratively inactivated. Their registration shall be reactivated after all required reporting is filed, applicable fees are paid, and an updated generator registration form is submitted to the department.
quantity generators. 40 CFR 262.44 is not incorporated in this rule.
(F) Imports of Hazardous Waste. The United States importer shall also comply with the following requirements:
ments specified in this section, the United States importer shall register as generator in accordance with this section and shall be responsible for compliance with all applicable requirements specified in this section. The United States importer shall register with the department as a generator, and four (4) weeks in advance of the date the waste is expected to enter the United States, shall specifically identify hazardous waste(s) intended to be imported by their EPA waste number(s) found in 40 CFR 261 and this section; and
and maintain the following information on each shipment which is imported and make available upon departmental request: 10 CSR 25-5
ment of multi-generator wastes, the individual original foreign generator’s names and addresses and the wastes’ technical chemical names from each source;
imported source; and
in 40 CFR 261 and this section which are applicable to the waste(s) from each source.
AUTHORITY: section 260.370, RSMo Supp. 2013, and section 260.380, RSMo Supp. 2014.* This rule was previously filed as 10 CSR 25-5.010. Original rule filed Dec. 16, 1985, effective Oct. 1, 1986. Amended: Filed Feb. 3, 1987, effective Aug. 1, 1987. Amended: Filed Dec. 1, 1987, effective Aug. 12, 1988. Amended: Filed Feb. 16, 1990, effective Dec. 31, 1990. Amended: Filed Jan. 15, 1991, effective Aug. 1, 1991. Amended: Filed Feb. 14, 1992, effective Dec. 3, 1992. Amended: Filed Jan. 5, 1993, effective Aug. 9, 1993. Amended: Filed Jan. 5, 1994, effective Aug. 28, 1994. Amended: Filed Aug. 16, 1995, effective April 30, 1996. Amended: Filed June 1, 1998, effective Jan. 30, 1999. Amended: Filed Feb. 1, 2001, effective Oct. 30, 2001. Amended: Filed March 31, 2006, effective Dec. 30, 2006. Amended: Filed Oct. 15, 2008, effective June 30, 2009. Amended: Filed April 15, 2011, effective Dec. 30, 2011. Amended: Filed April 15, 2015, effective Dec. 30, 2015. *Original authority: 260.370, RSMo 1977, amended 1980, 1988, 1993, 1995, 2004, 2010 and 260.380, RSMo 1977, amended 1980, 1985, 2000, 2004, 2005, 2011, 2013, 2014.