Mo. Code Regs. Ann. tit. 10, § 20-8.160
PURPOSE: This rule specifies the minimum standards for the design of settling operations that are part of wastewater collection and treatment systems. This rule is to be used with rules 10 CSR 20-8.110 through 10 CSR 20-8.210. It does not address all aspects of design, and the design engineer may refer to other appropriate reference materials so long as these minimum standards set forth in this rule are met.
Editor’s Note: The secretary of state has determined that the publication of this rule in its entirety would be unduly cumbersome or expensive. The entire text of the material referenced has been filed with the secretary of state. This material may be found at the Office of the Secretary of State or at the headquarters of the agency and is available to any interested person at a cost established by state law.
(1) Applicability. Wastewater systems that utilize settling shall be designed based on criteria contained in this rule, published standards, applicable federal and state requirements, standard textbooks, current technical literature, and applicable safety standards. In the event of any conflict between the above criteria, the requirement in this rule shall prevail.
(2) General Considerations.
(3) Design.
(A) Side Water Depth. The minimum side water depth shall be as follows in Table 160-1 below: Table 160-1. Minimum Side Water Depth.
Type of Settling Tank Primary (>100,000 gpd) Primary (<100,000 gpd) Final following activated sludge process Final following attached growth biological reactor (>100,000 gpd)
(B) Surface Overflow Rates.
Table 160-2. Maximum Primary Settling Tank Surface Overflow Rates. rates for both design average flow and design peak hourly flow from Table 160-2 below. The larger area shall determine the size of the settling tank. Table 160-2. Maximum Primary Settling Tank Surface Overflow Rates. Type of Primary Settling Tank Tanks not receiving waste Type of Primary activated sludge Settling Tank Tanks not receiving waste Tanks receiving waste activated sludge activated sludge Tanks receiving waste Chemically enhanced activated sludge Chemically enhanced 1 Calculate surface overflow rates with all flows received at the settling tanks. 1 Calculate surface overflow rates with all flows received at the settling tanks.
actors. Surface overflow rates for settling tanks following attached growth biological reactors shall not exceed one thousand two hundred gallons per day per square foot (1,200 gpd/ ft2) based on the design peak hourly flow.
design criteria in Table 160-3, included herein, shall not be exceeded: Minimum Side Water Depth (ft)
Table 160-1. Minimum Side Water Depth. 7 Minimum Side Water Depth Type of Settling Tank (ft) Primary (>100,000 gpd) 10 Primary (<100,000 gpd) 7 Final following activated sludge process 12 Final following attached growth biological reactor (>100,000 gpd) 10 Surface Overflow Rates1: At Design Peak At Design Average Flow Hourly Flow Surface Overflow Rates1: (gpd/ft2) (gpd/ft2) At Design Peak At Design Average Flow Hourly Flow 1,000 3,000 (gpd/ft2) (gpd/ft2)
1,000 3,000 700 1,700 1,400 1,500 700 1,700 1,400 1,500
Table 160-3. Maximum Activated Sludge Final Settling Tank Rates.
Treatment Process With diurnal flow equalization3 Without diurnal flow equalization3 Conventional, Step Aeration, Complete Mix, Contact Stabilization, Carbonaceous Stage of Separate Stage Nitrification Extended Aeration Single-Stage Nitrification Multi-Stage Nitrification Activated Sludge with Chemical addition to Mixed Liquor for Phosphorus Removal 1 Based on influent flow only. 2 Calculate the peak solids loading rate based on the design maximum day flow rate plus the design maximum return sludge rate requirement and the design mixed liquor suspended solids under aeration. 3 Applicable to wastewater treatment facilities with a design average flow of less than one hundred thousand gallons per day (100,000 gpd). 4 To determine the peaking factor use 10 CSR 20-8.110(3) Equation 110-1. 5 Wastewater treatment facilities needing to meet twenty milligrams per liter (20 mg/L) suspended solids or less should reduce the surface overflow rate to one thousand gallons per day per square foot (1,000 gpd/ft2). (C) Weirs.
the life of the structure to correct for differential settlement of the tank.
below, shall not be exceeded:
1,200 5
1,000 Peak Solids Loading Rate2 (lb/day/ft2)
| Table 160-4. Maximum Weir Loading Rates. | |
|---|---|
| Average Wastewater Treatment Facility | Loading Rate at Design |
| Capacity (million gallons per day or | Peak Hourly Flow |
| MGD) | (gpd/lf) |
| Less than 0.1 | 10,000 |
| 0.1 through1.0 | 20,000 |
| Greater than 1.0 | 30,000 |
(5) Protective and Service Facilities.
AUTHORITY: section 644.026, RSMo 2016.* Original rule filed Aug. 10, 1978, effective March 11, 1979. Amended: Filed June 15, 2018, effective Feb. 28, 2019.
*Original authority: 644.026, RSMo 1972, amended 1973, 1987, 1993.