Mo. Code Regs. Ann. tit. 10, § 20-4.061
PURPOSE: This rule sets forth the requirements and process of application for storm water loans and grants for construction of storm water control facilities and the terms and conditions for receipt of the loan and/or grant as revised. This rule also clarifies the requirements, the types of facilities eligible for funds and the calculation used to determine the amount of loan and grant available for eligible grantees.
(2) Definitions.
(D) Eligible Applicant.
Metropolitan St. Louis Sewer District (MSD); or
(3) General Requirements.
(B) Allocation of Bond Fund Proceeds. The department will determine the amount of funds to be allocated to the eligible recipients after Stormwater Control Bonds are issued and are deposited into the Stormwater Control Fund. The funds will be allocated to each first class county and to each sewer district established pursuant to Article VI, Section 30(a) of the Missouri Constitution by a percentage based on the population of the qualifying county or sewer district in relation to the total population of all eligible counties and sewer districts. The most recent federal decennial census will be used for all population statistics.
each entitlement city by a percentage based on the population of the entitlement city in relation to the total population of the first class county(ies) in which the entitlement city is located.
commitment to each eligible applicant. The notification will include the county, city, or sewer district’s proportionate share of the balance in the Stormwater Control Fund and instructions for applying for the funds.
(D) Planning Requirements.
sistent with a comprehensive storm water management plan. A storm water management plan should contain at a minimum the following components:
and discusses the purpose, scope, hydrology, and alternatives considered;
methodology used in plan development;
tem (if applicable);
projects;
used to evaluate and establish project priority ranking;
mentation of the plan;
plan for existing and new systems;
the plan area;
modeling data for the plan area;
photographs, public survey response forms; and
map, flood plain map, maps showing project areas.
plan must be submitted in conjunction with the applicant’s storm water application to the department. The geographical extent of the planning area may be determined by the department or the delegated entity. Projects which are solely for bank stabilization or erosion control, or other projects as determined by the department or the delegated entity, need only provide the items listed in subparagraphs (3)(D)2.B., D., and E. The drainage basin plan should include, but is not limited to:
drainage area showing computed drainage acreage;
mated construction costs for the proposed project;
design parameters for the drainage area, that is, upstream acres, runoff coefficients, time of concentration, return frequencies, and so forth. Computer modeling information may be submitted;
vation changes resulting from the project, unless the Corps of Engineers has committed to remap the area; and
approaches to storm water control. The plan must analyze the use of applied geomorphology and bioengineering techniques to manage storm water. Combinations of measures can be employed to manage storm water and retain important stream functions. “Bioengineering” combines mechanical, biological, and ecological concepts to prevent slope failures and erosion. Bioengineering techniques may use bare root stock, stems, branches, or trunks of living plants on eroded slopes. Plantings may be incorporated into such configurations as a live stakings, live fascines, or living cribwall. Vegetative plantings and cuttings may be combined with structural elements such as gabion baskets or rock surface armoring. However, the intent should be to minimize hard structural solutions and allow the rooted plantings to do much of the work to hold the soil in place and retain the natural function of streams to convey storm water. Other storm water management options include environmental easements and land acquisition. Projects that are only rehabilitation or replacement of existing structures will require an evaluation that addresses reasonable geomorphological alternatives and, if this approach is not taken, a brief discussion why not. For more complex projects, the evaluation should address the root causes of flooding, bed and bank erosion, and sediment deposition. The plan should not exacerbate these problems by:
that increase bed and bank erosion in modified stream sections;
that are upstream or downstream of the storm management project;
habitat;
benefits of vegetated stream corridors; or
upstream or downstream of the storm water management project.
(4) Required Documents. Prior to grant award and/or loan closing, the applicant must submit a completed storm water grant/loan application to the department. The following documents must be submitted and approved by the department or delegated entity prior to construction advertising. Some documents may be waived by the department or delegated entity on a case-by-case basis if it is determined they are not needed for that project:
(A) The following documents are required for a project which includes design and construction:
and design criteria;
2. Certification by the recipient that—
will be owned, operated, and maintained by a political subdivision eligible under subsection (3)(A) of this rule; or
and legal authority to ensure operation and maintenance of the facility;
tract documents and construction bidding will conform to relevant local and state laws;
necessary easements and land have been or will be obtained prior to construction start; and
recipient will construct the project or cause it to be constructed to final completion in accordance with the certified plans and specifications; and
(B) The following documents must be submitted for all storm water grant/loan projects including grants/loans for planning:
state storm water funds will be expended solely for carrying out the approved project;
registered professional engineer has been selected and will perform the services required in section (9) of this rule;
local match is available; and
required section 404 dredge and fill permits from the United States Army Corps of Engineers or land disturbance permits from the department will be obtained prior to construction.
(5) Eligible Project Costs. The information in this section represents policies and procedures for determining the eligibility of project costs for assistance under the Storm Water Grant and Loan Program.
(A) General. It is the policy of the commission that all project costs will be eligible if they meet the following tests:
operable storm water facility or for the completion of a comprehensive storm water master plan; and
described in the application and engineering submittals.
(B) Eligible Costs. Eligible costs include at a minimum:
hensive storm water control plan meeting the requirements of subsection (3)(D);
design based on invoiced amounts for a contracted engineering consultant. A copy of the approved engineering agreement must be submitted to the department or delegated entity when engineering services are to be reimbursed with grant or loan funds. The contract should be a lump sum or cost plus fixed fee contract in the form of a bilaterally executed written agreement.
neering when invoiced per an acceptable two (2)-party engineering agreement;
struction permits as issued by the department;
ment costs required for storm water holding basins, grass-lined channels, or for other limited structural storm water control projects, or buy-outs if the land purchased is restricted such that no permanent structure except for structures allowed under the Missouri Statewide Comprehensive Outdoor Recreation Plan (SCORP) may be constructed within the easement or purchase area. Construction costs related to holding basins on private land are eligible if the eligible recipient retains a permanent easement, is legally responsible for operation and maintenance of the facility, and the basin constructed is clearly for storm water control and not recreational use;
ning, design, construction, construction engineering, and costs of rented or leased equipment. It does not include the costs of recipient-owned equipment or the costs of administration for grants and loans. Engineering performed by force account must meet the requirements of 10 CSR 20-4.061(9) which state that storm water plan preparation, design, and inspection must be provided by a registered professional engineer or by a person under the direct and continuing supervision of a registered professional engineer. To be considered for force account, the following information must be submitted for review and approval by the department prior to beginning on the project:
with city employees;
will be working on the project;
assigned to each project. The letter should state the time code number;
must contain an assurance that the employee is a registered professional engineer or the name of the professional engineer who directly supervises this person;
ual must be given. If the person is salaried, this is the total annual salary divided by two thousand and eighty (2,080) hours. The hourly wage cannot include fringe or indirect costs; and
used. The time card must list the employee name, project time code, hours worked, and the signature of the employee and the supervisor. Should there be a change in employees, salary, or engineering supervisor during the course of the project, the recipient must amend/update the information in the original letter before that salary and/or employee cost can be reimbursed;
within storm water control areas provided future development of permanent structures in the storm water control area is restricted;
interest incurred on loans administered under this rule;
grant and/or loan funding may be used for the same project if it meets the following criteria:
time frame necessary to receive the first grant and/or loan of the sequence;
are adequate funds committed from other sources to complete the construction;
inal funding combination for the entire sequence of grants and/or loans; and
ject will be completed with or without the subsequent years’ grant/loan funds.
storm water damage to sink holes; and
tive fees incurred by a delegated entity in connection with each grant.
(6) Ineligible Project Costs. Ineligible costs include, but are not limited to, the following:
(9) Engineering Requirements.
(10) Bidding Requirements.
(A) This subsection applies to procurement of construction equipment, supplies, and construction services in excess of one hundred thousand dollars ($100,000) awarded by the recipient for any storm water project.
formal advertising. The project advertisement must be published in a newspaper at least one (1) time thirty (30) days prior to the bid opening or five (5) consecutive days two (2) weeks prior to bid opening or in accordance with the local government’s procurement ordinances.
responsive and responsible bidder.
rence from the delegated entity with contract award must be obtained prior to the actual contract award if fewer than three (3) bidders submit bids or if the recipient wishes to award the contract to other than the low bidder. The recipient shall forward the tabulation of bids and a recommendation of contract award to the department or delegated entity for review.
submitted prior to the first grant payment if payments are made monthly. If the grant is paid into an escrow account, the executed contract documents must be submitted with the first statement that indicates construction costs were paid with grant funds.
(11) Grant Payments.
(A) Prior to the grant award, the department will notify the grantee how funds will be disbursed under the grant.
grant until the following conditions have been met:
grantee must submit to the department:
cations prepared in accordance with subsection (9)(A) of this rule; and
must have the department’s concurrence for all major consulting contracts, and a copy of the consulting contracts must be on file with the department; and
secured matching funds for the grant.
gated entity will be paid in accordance with the delegated entity’s procedure on file with the department.
(12) Loan Requirements.
AUTHORITY: sections 644.026 and 644.570, RSMo 2016.* Original rule filed June 9, 1999, effective March 30, 2000. Emergency amendment filed Feb. 1, 2007, effective March 4, 2007, expired Aug. 30, 2007. Amended: Filed March 14, 2007, effective Oct. 30, 2007. Amended: Filed March 16, 2009, effective Dec. 30, 2009. Amended: Filed June 13, 2018, effective Feb. 28, 2019.
*Original authority: 644.026, RSMo 1972, amended 1973, 1987, 1993, 1995, 2000, 2012, 2014 and 644.570, RSMo 1999, amended 2008.