Mo. Code Regs. Ann. tit. 10, § 10-6.376
PURPOSE: The purpose of this rule is to have Missouri responsible for the Cross-State Air Pollution Rule (CSAPR) Sulfur Dioxide (SO2) Group 1 Trading Program rather than the U.S. Environmental Protection Agency to Missouri. This rule also provides the process to allocate allowances to affected units in Missouri for compliance with the CSAPR SO2 Group 1 Trading Program. The evidence supporting the need for this rule, per section 536.016, RSMo, is a November 7, 2011 email between Empire District Electric Co. (Empire) and Kansas City Power and Light (KCP&L) and the November 26, 2014, March 24, 2015, and February 8, 2018 affected industry meeting summaries.
PUBLISHER’S NOTE: The secretary of state has determined that the publication of the entire text of the material which is incorporated by reference as a portion of this rule would be unduly cumbersome or expensive. This material as incorporated by reference in this rule shall be maintained by the agency at its headquarters and shall be made available to the public for inspection and copying at no more than the actual cost of reproduction. This note applies only to the reference material. The entire text of the rule is printed here.
(1) Applicability.
(B) Exceptions. The following provisions are not adopted by reference in subsection (1)(A) of this rule, nor are they replaced by any provisions in this rule:
(2) Definitions.
(3) General Provisions. The general provisions for the Cross- State Air Pollution Rule (CSAPR) sulfur dioxide (SO2) Group 1 Trading Program may be found in 40 CFR 97.604 through 40 CFR 97.628, which, unless listed in subsection (1)(B) of this rule, are incorporated by reference in subsection (1)(A) of this rule. Subsections (3)(A) and (3)(B) of this rule replace the provisions of 40 CFR 97.611(a), 40 CFR 97.611(b)(1), and 40 CFR 97.612(a) as incorporated by reference in subsection (1)(A) of this rule.
(A) Existing Units.
Environmental Protection Agency (EPA), in a format prescribed by the administrator, the CSAPR SO2 Group 1 allowances listed in Table I taking into account any modifications necessary in accordance with paragraph (3)(A)2. of this rule. This submittal must meet the following schedule:
allowances for CSAPR SO2 Group 1 units for the control periods in 2017 and 2018;
allowances for CSAPR SO2 Group 1 units for the control periods in 2019 and 2020;
allowances for CSAPR SO2 Group 1 units for the control periods in 2021 and 2022; and
director will submit to EPA allowances for CSAPR SO2 Group 1 units for the control periods in the fourth year after the year in which the submission is made.
not operate during two (2) consecutive control periods after 2014, the submittal made under paragraph (3)(A)1. of this rule will show zero (0) CSAPR SO2 Group 1 SO2 allowances for such unit for the control period in the fifth year after these two (2) such years and in each year after that fifth year. All CSAPR SO2 Group 1 allowances that would otherwise have been allocated to such unit will be allocated to the new unit set-aside for the state for the respective years involved. If this subsection is applicable, any resulting changes to the submittal under paragraph (3)(A)1. of this rule will be determined in accordance with the following:
each unit listed in Table I and issue a notification that lists any unit in Table I that has not operated during two (2) consecutive control periods after 2014. Any notification made under this subparagraph will specify the first year in which allowances listed in Table I will be terminated for the applicable unit(s) under paragraph (3)(A)2. of this rule;
rule, the director will provide an opportunity for submission of objections to the units referenced in such notice that must be submitted by the deadline specified in such notification in order to be considered; and
and issue a notification responding to objections received along with any adjustments made to the list. Source Name
Asbury Audrain Power Plant Audrain Power Plant Audrain Power Plant Audrain Power Plant Audrain Power Plant Audrain Power Plant Audrain Power Plant Audrain Power Plant Blue Valley Chamois Power Plant Chillicothe Chillicothe Chillicothe Chillicothe Columbia Columbia Columbia Columbia Energy Center (MO) Columbia Energy Center (MO) Columbia Energy Center (MO) Columbia Energy Center (MO) Dogwood Energy Facility Dogwood Energy Facility Empire District Elec Co Energy Ctr Empire District Elec Co Energy Ctr Empire District Elec Co Energy Ctr Empire District Elec Co Energy Ctr Empire District Elec Co Energy Ctr Empire District Elec Co Energy Ctr Essex Power Plant Fairgrounds Greenwood Energy Center Greenwood Energy Center Greenwood Energy Center Greenwood Energy Center Hawthorn Hawthorn Hawthorn Hawthorn Table I
Source Unit ID ID
2076 1 55234 CT1 55234 CT2 55234 CT3 55234 CT4 55234 CT5 55234 CT6 55234 CT7 55234 CT8 2132 3 2169 2 2122 GT1A 2122 GT1B 2122 GT2A 2122 GT2B 2123 6 2123 7 2123 8 55447 CT01 55447 CT02 55447 CT03 55447 CT04 55178 CT-1 55178 CT-2 6223 1 6223 2 6223 3A 6223 3B 6223 4A 6223 4B 7749 1 2082 CT01 6074 1 6074 2 6074 3 6074 4 2079 5A 2079 6 2079 7 2079 8 CSAPR SO2 Group 1 unit allowances (tons) for 2017 and thereafter
3,180
2,643
Hawthorn Higginsville Municipal Power Plant Higginsville Municipal Power Plant Holden Power Plant Holden Power Plant Holden Power Plant Howard Bend Howard Bend Iatan James River James River James River James River James River John Twitty Energy Center John Twitty Energy Center John Twitty Energy Center John Twitty Energy Center John Twitty Energy Center Labadie Labadie Labadie Labadie Lake Road Lake Road McCartney Generating Station McCartney Generating Station McCartney Generating Station McCartney Generating Station Meramec Meramec Meramec Meramec Meramec Meramec Meramec Mexico Moberly Montrose Montrose Montrose Moreau New Madrid Power Plant New Madrid Power Plant Nodaway Power Plant Nodaway Power Plant Northeast Generating Station 2079 9 2131 4A 2131 4B 7848 1 7848 2 7848 3 2102 CT1A 2102 CT1B 6065 1 2161 GT1 2161 GT2 2161 3 2161 4 2161 5 6195 1 6195 CT1A 6195 CT1B 6195 CT2A 6195 CT2B 2103 1 2103 2 2103 3 2103 4 2098 6 2098 GT5 7903 MGS1A 7903 MGS1B 7903 MGS2A 7903 MGS2B 2104 1 2104 2 2104 3 2104 4 2104 CT01 2104 CT2A 2104 CT2B 6650 CT01 6651 CT01 2080 1 2080 2 2080 3 6652 CT01 2167 1 2167 2 7754 1 7754 2 2081 11 11,133
1,566 2,883
9,056 9,265 9,633 9,929 1,490
2,326 2,192 3,869 5,394
2,608 2,555 2,684
8,190 7,628 Northeast Generating Station Northeast Generating Station Northeast Generating Station Northeast Generating Station Northeast Generating Station Northeast Generating Station Northeast Generating Station Peno Creek Energy Center Peno Creek Energy Center Peno Creek Energy Center Peno Creek Energy Center Peno Creek Energy Center Peno Creek Energy Center Peno Creek Energy Center Peno Creek Energy Center Ralph Green Station Rush Island Rush Island Sibley Sibley Sibley Sikeston Sioux Sioux South Harper Peaking Facility South Harper Peaking Facility South Harper Peaking Facility St. Francis Power Plant St. Francis Power Plant State Line (MO) State Line (MO) State Line (MO) Thomas Hill Energy Center Thomas Hill Energy Center Thomas Hill Energy Center Viaduct
Total
Note: Being included or excluded on the list of sources in Table I does not constitute a determination that such source is or is not a CSAPR SO2 Group 1 unit. The determination of applicability for CSAPR SO2 Group 1 units is in 40 CFR 97.604 as incorporated by reference in subsection (1)(A) of this rule.
�𝐸𝐸𝐸𝐸��𝐻𝐻𝐸𝐸���𝐶𝐶�����𝐶𝐶𝐶𝐶�����𝐶𝐶𝐶𝐶��24 ℎ𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜
𝐸𝐸� � �2,000 𝑙𝑙𝑙𝑙
2081 12 2081 13 2081 14 2081 15 2081 16 2081 17 2081 18 7964 CT1A 7964 CT1B 7964 CT2A 7964 CT2B 7964 CT3A 7964 CT3B 7964 CT4A 7964 CT4B 2092 3 6155 1 6155 2 2094 1 2094 2 2094 3 6768 1 2107 1 2107 2 56151 1 56151 2 56151 3 7604 1 7604 2 7296 1 7296 2-1 7296 2-2 2168 MB1 2168 MB2 2168 MB3 2096 CT01 0
� �1,000 𝑘𝑘𝑘𝑘
𝑑𝑑𝑑𝑑𝑑𝑑�
��1,000,000 𝐵𝐵𝐵𝐵𝐵𝐵 � �
𝑡𝑡𝑜𝑜𝑡𝑡� 𝑚𝑚𝑚𝑚𝐵𝐵𝐵𝐵𝐵𝐵
9,492 8,700
5,037 4,564 6,743 6,083
2,982 4,665 9,621
160,959
�
� 𝑀𝑀𝑘𝑘�
(B) New Units.
period in 2017 and each control period thereafter, the director must submit to EPA, in a format prescribed by the administrator, the CSAPR SO2 Group 1 allowances as determined under this subsection by July 1 of the applicable control period.
2. New unit set-asides.
calculate the CSAPR SO2 Group 1 allowance allocation to each CSAPR SO2 Group 1 unit in a state, in accordance with subparagraphs (3)(B)3.B. through (3)(B)3.G. and (3)(B)3.L. of this rule, for the control period in the year of the applicable submittal deadline under paragraph (3)(B)1. of this rule. Once the calculations are complete, the director will contact all facilities that will receive allocations under subparagraphs (3) (B)3.B. through (3)(B)3.G. and (3)(B)3.L. of this rule for the control period in the year of the applicable submittal deadline under paragraph (3)(B)1. of this rule to confirm that the calculations were performed in accordance with this rule, and make adjustments to the calculations if necessary.
control period has any CSAPR SO2 Group 1 allowances remaining after the calculations performed under subparagraphs (3) (B)3.B. through (3)(B)3.G. and (3)(B)3.L. of this rule have been completed, then allowances will be calculated in accordance with subparagraph (3)(B)3.I. of this rule.
owner, operator, or designated representative wishes to receive allowances in accordance with subparagraph (3)(B)3.I. of this rule, for any control period, then by April 5 of the applicable control period, the facility owner, operator, or designated representative must submit information to the director confirming that a CSAPR SO2 Group 1 unit commenced commercial operation during the period starting January 1 of the year before the year of such control period and ending March 31 of the year of such control period. The submittal must also include the calculation of eligible allowances for use in subparagraph (3)(B)3.I. of this rule, for each CSAPR SO2 Group 1 unit that commenced commercial operation during the period starting January 1 of the year before the year of such control period and ending March 31 of the year of such control period.
accordance with part (3)(B)3.I.(III) of this rule in order for such units to be eligible to receive any allowances in accordance with subparagraph (3)(B)3.I. of this rule.
made in accordance with this paragraph to confirm that units identified in the submissions are CSAPR SO2 Group 1 units that commenced commercial operation during the period starting January 1 of the year before the year of such control period and ending March 31 of the year of such control period. The director will also confirm that the submission includes the correct calculations for eligible allowances in accordance with part (3) (B)3.I.(III) of this rule. If, during the review, the director identifies any discrepancies with the identified units or the calculations in a submission made in accordance with this paragraph, the director may request additional information from the facility owner, operator, or designated representative that made the submission. If additional information is requested, the facility owner, operator, or designated representative must provide the requested information by the deadline specified in the information request; otherwise, units identified in such submission will not be eligible for allowances in accordance with subparagraph (3)(B)3.I. of this rule for the applicable control period.
CSAPR SO2 Group 1 allowance allocation to each CSAPR SO2 Group 1 unit in accordance with subparagraphs (3)(B)3.I., (3) (B)3.J., and (3)(B)3.L. of this rule and 40 CFR 97.606(b)(2) and 40 CFR 97.630 through 40 CFR 97.635 as incorporated by reference in subsection (1)(A) of this rule. By June 1 of each year, the director will issue a notification making available the results of all allowance determinations from the new unit set-aside for the control period in which the notification is made.
of this rule, the director will provide an opportunity for submission of objections to the calculations referenced in such notice.
them and provide notification stating the outcome.
allowances are added to the new unit set-aside after submittals per subparagraph (3)(B)2.C. of this rule, the director will issue additional notifications, as deemed appropriate, of the allocation of such CSAPR SO2 Group 1 allowances in accordance with subparagraph (3)(B)3.J. of this rule.
For each control period in 2017 and thereafter and for the CSAPR SO2 Group 1 units in Missouri, the director will allocate CSAPR SO2 Group 1 allowances to the CSAPR SO2 Group 1 units as follows:
Group 1 allowances will be allocated to the following CSAPR SO2 Group 1 units, except as provided in subparagraph (3)(B)3.J. of this rule:
I in paragraph (3)(A)2. of this rule;
amount of CSAPR SO2 Group 1 allowances for such control period listed in Table I in paragraph (3)(A)2. of this rule is covered by 40 CFR 97.611(c)(2) or (3) as incorporated by reference in subsection (1)(A) of this rule;
I in paragraph (3)(A)2. of this rule and the allocation to such unit(s) is terminated for the applicable control period pursuant to paragraph (3)(A)2. of this rule, and that operate during the control period immediately preceding such control period; or
CSAPR SO2 Group 1 units under 40 CFR 97.611(c)(1)(ii) whose allocation of an amount of CSAPR SO2 Group 1 allowances for such control period under paragraph (3)(B)2. of this rule is covered by 40 CFR 97.611(c)(2) or (3) as incorporated by reference in subsection (1)(A) of this rule;
a separate new unit set-aside for the state for each such control period. Each such new unit set-aside will be allocated CSAPR SO2 Group 1 allowances in an amount equal to the difference between the Missouri CSAPR SO2 Group 1 trading budget for 2017 and thereafter, as set forth in 40 CFR 97.610(a) as incorporated by reference in subsection (1)(A) of this rule, and the total number of allowances allocated in accordance with paragraph (3)(A)1. of this rule for such control period. The new unit set-aside will be allocated additional CSAPR SO2 Group 1 allowances (if any) in accordance with paragraph (3)(A)2. of this rule and 40 CFR 97.611(c)(5) as incorporated by reference in subsection (1)(A) of this rule;
for each CSAPR SO2 Group 1 unit described in subparagraph (3)(B)3.A. of this rule, an allocation of CSAPR SO2 Group 1 allowances for the later of the following control periods and for each subsequent control period:
in which the CSAPR SO2 Group 1 unit commences commercial operation;
the first control period in which the CSAPR SO2 Group 1 unit operates in the state after operating in another jurisdiction and for which the unit is not already allocated one (1) or more CSAPR SO2 Group 1 allowances; and
rule, the first control period after the control period in which the unit resumes operation, or the first control period in which the allocation for such unit listed in Table I in paragraph (3) (A)2. of this rule is terminated pursuant to paragraph (3)(A)2. of this rule, whichever is later; Note:
unit described in parts (3)(B)3.A.(I) through (3)(B)3.A.(III) of this rule and for each control period described in subparagraph (3)(B)3.C. of this rule will be an amount equal to the unit’s total tons of SO2 emissions during the immediately preceding control period. The director will adjust the allocation amount in this subparagraph in accordance with subparagraphs (3) (B)3.E. through (3)(B)3.G. and (3)(B)3.L. of this rule;
sum of the CSAPR SO2 Group 1 allowances determined for all such CSAPR SO2 Group 1 units under subparagraph (3)(B)3.D. of this rule in the state for such control period;
SO2 Group 1 allowances in the new unit set-aside for the state for such control period is greater than or equal to the sum under subparagraph (3)(B)3.E. of this rule, then the director will allocate the amount of CSAPR SO2 Group 1 allowances determined for each such CSAPR SO2 Group 1 unit under subparagraph (3)(B)3.D. of this rule;
CSAPR SO2 Group 1 allowances in the new unit set-aside for the state for such control period is less than the sum under subparagraph (3)(B)3.E. of this rule, then the director will allocate to each such CSAPR SO2 Group 1 unit the amount of the
unit eligible for such allocation;
Operation. If, after completion of the procedures under subparagraphs (3)(B)3.E. through (3)(B)3.H. of this rule for such control period, any unallocated CSAPR SO2 Group 1 allowances remain in the new unit set-aside for the state for such control period, the director will allocate such CSAPR SO2 Group 1 allowances as follows:
subparagraph (3)(B)2.C. of this rule, the submitting facility owner, operator, or designated representative may include the calculation of eligible allowances for such control period as specified in part (3)(B)3.I.(III) of this rule. If such submission is not made or fails to include the calculation of eligible allowances under this part by the April 5 deadline, or if the Northeast Generating Station Northeast Generating Station Northeast Generating Station Northeast Generating Station Northeast Generating Station Northeast Generating Station Northeast Generating Station Peno Creek Energy Center Peno Creek Energy Center Peno Creek Energy Center Peno Creek Energy Center Peno Creek Energy Center Peno Creek Energy Center Peno Creek Energy Center Peno Creek Energy Center Ralph Green Station Rush Island Rush Island Sibley Sibley Sibley Sikeston Sioux Sioux South Harper Peaking Facility South Harper Peaking Facility South Harper Peaking Facility St. Francis Power Plant St. Francis Power Plant State Line (MO) State Line (MO) State Line (MO) Thomas Hill Energy Center Thomas Hill Energy Center Thomas Hill Energy Center Viaduct
Total Being included or excluded on the list of sources in Table I does not constitute a determination that such source is or is not a CSAPR SO2 Group 1 unit. The determination of applicability for CSAPR SO2 Group 1 units is in 40 CFR 97.604 as incorporated by reference in subsection (1)(A) of this rule. facility owner, operator, or designated representative fails to provide additional information requested in accordance with part (3)(B)2.C.(II) of this rule by the applicable deadline; then no allowances will be awarded to such unit in accordance with this subparagraph for such control period;
in accordance with subparagraph (3)(B)2.C. of this rule, as specified in part (3)(B)2.C.(II) of this rule and may adjust the units identified in such submission if they are not eligible for allowances under this subparagraph, and the director may also adjust the calculation of eligible allowances included in such submission to ensure they are in accordance with part (3) (B)3.I.(III) of this rule;
allowances for a specific control period for CSAPR SO2 Group 1 units that commenced commercial operation during the period starting January 1 of the year before the year of such control period and ending March 31 of the year of such control period must be as follows;
�𝐸𝐸𝐸𝐸��𝐻𝐻𝐸𝐸���𝐶𝐶�����𝐶𝐶𝐶𝐶�����𝐶𝐶𝐶𝐶��24 ℎ𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜
𝐸𝐸� � �2,000 𝑙𝑙𝑙𝑙
Where: EA = eligible CSAPR SO2 Group 1 Allowances ER = the unit’s permitted emission rate from the unit’s construction permit approved under 10 CSR 10-6.060 (lb/mmBTU) HR = the heat rate efficiency for the generator that the unit serves (BTU/kW-hr) = nameplate capacity of the generator that the unit NPCap serves (MWe) = number of days in the control period CPTot CF = the unit’s default capacity factor from Table II below
Table II – Default Capacity Factors for New Units
Combined Cycle Combustion Turbine
in subparagraph (3)(B)3.A. of this rule that commenced commercial operation during the period starting January 1 of the year before the year of such control period and ending March 31 of the year of such control period, the positive difference (if any) between the unit’s emissions during the previous control period and the amount of eligible CSAPR SO2 Group 1 allowances as calculated under part (3)(B)3.I.(III) of this rule;
differences determined under part (3)(B)3.I.(IV) of this rule; 2081 12 2081 13 2081 14 2081 15 2081 16 2081 17 2081 18 7964 CT1A 7964 CT1B 7964 CT2A 7964 CT2B 7964 CT3A 7964 CT3B 7964 CT4A 7964 CT4B 2092 3 6155 1 6155 2 2094 1 2094 2 2094 3 6768 1 2107 1 2107 2 56151 1 56151 2 56151 3 7604 1 7604 2 7296 1 7296 2-1 7296 2-2 2168 MB1 2168 MB2 2168 MB3 2096 CT01 0
� �1,000 𝑘𝑘𝑘𝑘
𝑑𝑑𝑑𝑑𝑑𝑑�
��1,000,000 𝐵𝐵𝐵𝐵𝐵𝐵 � �
𝑡𝑡𝑜𝑜𝑡𝑡� 𝑚𝑚𝑚𝑚𝐵𝐵𝐵𝐵𝐵𝐵
0.66
9,492 8,700
5,037 4,564 6,743 6,083
2,982 4,665 9,621
160,959
�
� 𝑀𝑀𝑘𝑘�
| CSAPRSO2Group1allowancesdeterminedundersubparagraph | ||
|---|---|---|
| (3)(B)3.D. of this rule for the unit, multiplied by the amount of | ||
| CSAPR SO2 Group 1 allowances in the new unit set-aside for | Annual SO2 & NOx | |
| Unit Types | ||
| such control period, divided by the sum under subparagraph | Programs | |
| (3)(B)3.E. of this rule, and rounded to the nearest allowance; | Coal-Fired Steam Boiler | 0.85 |
| H. Confirmation of Allowances. The director will contact | IGCC (Coal Gasification) | 0.74 |
| facilities as described in subparagraph (3)(B)2.A. of this rule to | Oil-Fired Steam Boiler | 0.30 |
| confirm the amount of CSAPR SO2 Group 1 allowances allocated | Natural Gas-Fired Steam Boiler | 0.44 |
| under subparagraphs (3)(B)3.B. through (3)(B)3.G. and (3)(B)3.L. | Simple Cycle Combustion | |
| of this rule for such control period to each CSAPR SO2 Group 1 | 0.24 | |
| Turbine |
allowances remaining in the new unit set-aside for the state for such control period is greater than or equal to the sum determined under part (3)(B)3.I.(V) of this rule, then the director will allocate the amount of CSAPR SO2 Group 1 allowances determined for each such CSAPR SO2 Group 1 unit under part (3)(B)3.I.(IV) of this rule; and
allowances remaining in the new unit set-aside for the state for such control period is less than the sum under part (3) (B)3.I.(V) of this rule, then the director will allocate to each such CSAPR SO2 Group 1 unit the amount of the CSAPR SO2 Group 1 allowances determined under part (3)(B)3.I.(IV) of this rule for the unit, multiplied by the amount of unallocated CSAPR SO2 Group 1 allowances remaining in the new unit set-aside for such control period, divided by the sum under part (3)(B)3.I.(V) of this rule, and rounded to the nearest allowance;
completion of the procedures under subparagraphs (3) (B)3.I. and (3)(B)3.L. of this rule for such control period, any unallocated CSAPR SO2 Group 1 allowances remain in the new unit set-aside for the state for such control period, the director will allocate to each CSAPR SO2 Group 1 unit that is in the state, is allocated an amount of CSAPR SO2 Group 1 allowances listed in Table I in paragraph (3)(A)2. of this rule, and continues to be allocated CSAPR SO2 Group 1 allowances for such control period in accordance with paragraph (3)(A)2. of this rule, an amount of CSAPR SO2 Group 1 allowances equal to the following: the total amount of such remaining unallocated CSAPR SO2 Group 1 allowances in such new unit set-aside, multiplied by the unit’s allocation listed in Table I in paragraph (3)(A)2. of this rule for such control period, divided by the remainder of the amount of tons in the applicable state SO2 Annual trading budget minus the amount of tons in such new unit set-aside for the state for such control period, and rounded to the nearest allowance;
as described in subparagraphs (3)(B)2.D. and (3)(B)2.E. of this rule, of the amount of CSAPR SO2 Group 1 allowances allocated under subparagraphs (3)(B)3.B. through (3)(B)3.G., (3)(B)3.I., (3) (B)3.J., and (3)(B)3.L. of this rule for such control period to each CSAPR SO2 Group 1 unit eligible for such allocation; and
the New Unit Set-Aside.
graphs (3)(B)3.B. through (3)(B)3.K. of this rule, if the calculations of allocations of a new unit set-aside for a control period in a given year under subparagraph (3)(B)3.G. of this rule, subparagraph (3)(B)3.F. and part (3)(B)3.I.(VII) of this rule, or subparagraph (3)(B)3.F., part (3)(B)3.I.(VI), and subparagraph (3) (B)3.J. of this rule would otherwise result in total allocations of such new unit set-aside exceeding the total amount of such new unit set-aside, then the director will adjust the results of the calculations under subparagraph (3)(B)3.G., part (3) (B)3.I.(VII), or subparagraph (3)(B)3.J. of this rule, as applicable, as follows. The director will list the CSAPR SO2 Group 1 units in descending order based on the amount of such units’ allocations under subparagraph (3)(B)3.G., part (3)(B)3.I.(VII), or subparagraph (3)(B)3.J. of this rule, as applicable, and, in cases of equal allocation amounts, in alphabetical order of the relevant source’s name and numerical order of the relevant unit’s identification number, and will reduce each unit’s allocation under subparagraph (3)(B)3.G., part (3)(B)3.I.(VII), or subparagraph (3) (B)3.J. of this rule, as applicable, by one (1) CSAPR SO2 Group 1 allowance (but not below zero (0)) in the order in which the units are listed and will repeat this reduction process as necessary, until the total allocations of such new unit set-aside equal the total amount of such new unit set-aside.
graphs (3)(B)3.J. and (3)(B)3.K. of this rule, if the calculations of allocations of a new unit set-aside for a control period in a given year under subparagraph (3)(B)3.F., part (3)(B)3.I.(VI), and subparagraph (3)(B)3.J. of this rule would otherwise result in a total allocations of such new unit set-aside less than the total amount of such new unit set-aside, then the director will adjust the results of the calculations under subparagraph (3)(B)3.J. of this rule, as follows. The director will list the CSAPR SO2 Group 1 units in descending order based on the amount of such units’ allocations under subparagraph (3)(B)3.J. of this rule and, in cases of equal allocation amounts, in alphabetical order of the relevant source’s name and numerical order of the relevant unit’s identification number, and will increase each unit’s allocation under subparagraph (3)(B)3.J. of this rule by one (1) CSAPR SO2 Group 1 allowance in the order in which the units are listed and will repeat this increase process as necessary, until the total allocations of such new unit set-aside equal the total amount of such new unit set-aside.
(4) Reporting and Record Keeping.
AUTHORITY section 643.050, RSMo 2016.* Original rule filed May 15, 2015, effective Dec. 30, 2015. Amended: Filed June 21, 2018, effective March 30, 2019. Amended: Filed March 12, 2021, effective Nov. 30, 2021.
*Original authority: 643.050, RSMo 1965, amended 1972, 1992, 1993, 1995, 2011.