PURPOSE: This regulation specifies the maximum allowable shade or opacity of visible air contaminant emissions, unless exempt or regulated by 10 CSR 10-4.080 or 10 CSR 10-6.070 and requires the use of opacity monitoring devices on certain air contaminant sources.
PUBLISHER’S NOTE: The publication of the full text of the material that the adopting
(1/29/98)* Rebecca McDowell Cook Regulations for the Springfield-Greene County Area
agency has incorporated by reference in this rule would be unduly cumbersome or expensive. Therefore, the full text of that material will be made available to any interested person at both the Office of the Secretary of State and the office of the adopting agency, pursuant to section 536.031.4, RSMo. Such material will be provided at the cost established by state law.
(1) Restrictions Applicable to Existing Installations. No person may discharge into the ambient air from any single existing source of emission any air contaminant
(2) Restrictions Applicable to New Installations. No person may discharge into the ambient air from any single new source of emission any air contaminant—
(3) Exceptions.
(A) A person may discharge into the ambient air from any single source of emission for a period(s) aggregating not more than six (6) minutes in any sixty (60) minutes air contaminants—
darker than No. 3 on the Ringelmann Chart; or
observer’s view to a degree not equal to nor greater than does smoke designated as No. 3 on the Ringelmann Chart.
(1) or (2) of this regulation, that section shall not apply.
(D) The provisions of section (1) of this regulation shall not apply to the following:
in 10 CSR 10-4.030.
Rebecca McDowell Cook (1/29/98)*
(E) This regulation shall not apply during emergency conditions, provided that the staff director is notified or to the following:
dwellings;
or fires used for the noncommercial preparation of food by barbecuing;
training firemen; and
air pollution control inspectors.
(4) Method of Measurement.
(C) Minimum Specifications.
ous monitoring systems for monitoring opacity shall comply with performance specification 1 as set forth in 40 CFR Part 60, Appendix B, “Performance Specification 1.”
the total time a monitoring system requires to sample, analyze and record an emission measurement. Continuous monitoring systems for measuring opacity shall complete a minimum of one (1) cycle of operation (sampling, analyzing and data recording) for each successive ten (10)-second period.
monitoring systems or monitoring devices shall be installed so that the measurements obtained are representative measurements of emissions occurring within the discharged opacity profile.
ents from two (2) or more affected facilities of similar design and operating characteristics are combined before being released to the atmosphere, opacity monitoring systems may be installed on the combined effluent.
tors of all continuous monitoring systems installed in accordance with the requirements of this rule shall record the zero and drift at least once daily unless the manufacturer has 10 CSR 10-4
recommended adjustments at shorter intervals, at which case the recommendations shall be followed and shall adjust the zero and span whenever the twenty-four (24)-hour zero drift or twenty-four (24)-hour calibration drift limits in 40 CFR Part 60, Appendix B, “Performance Specification 1” are exceeded or whenever the twenty-four (24)-hour zero drift or twenty-four (24)-hour calibration drift exceed ten percent (10%) of the emission standard.
approximately two hundred percent (200%) of the expected instrument data display output corresponding to the emission standard for the source.
(D) Minimum Data Requirements.
operators of facilities required to install continuous monitoring systems shall submit a written report of excess emissions for each calendar quarter and the nature and cause of the excess emissions, if known, to the staff director. All quarterly reports shall be postmarked by the thirtieth day following the end of each calendar quarter.
shall consist of the magnitude in actual percent opacity of all six (6)-minute averages of opacity greater than the opacity emission limitation. Average of values may be obtained by integration over the averaging period or by arithmetically averaging a minimum of twenty-four (24) equally spaced instantaneous opacity measurements per six (6)-minute period. A one (1)-hour period means any sixty (60)-minute period commencing on the hour and a six (6)-minute period means any one (1) of ten (10) equal parts of a one (1)- hour period.
time identifying each period during which the continuous monitoring system was inoperative (except for zero and span checks) and the nature of system repairs or adjustments shall be reported.
emissions have occurred during the reporting period and the continuous monitoring system has not been inoperative, repaired or adjusted, that information shall be included in the report.
operators of affected facilities shall maintain a file of all information reported in the quarterly summaries and all other data collected either by the continuous monitoring system or as necessary to convert monitoring data to the units of the applicable standard, for a minimum of two (2) years from the date of collection of the data or submission of the summaries.
(E) Special Considerations.
requirements, system locations and procedures for performing calibration checks which do not meet the requirements of this rule but adequately demonstrate a definite and consistent relationship with the intent of this rule, may be approved by the staff director.
2. Exceptions.
that have an annual boiler capacity factor of thirty percent (30%) or less as currently defined by the Federal Power Commission shall be exempt from these monitoring requirements.
cement calcining kilns scheduled for retirement prior to January 1, 1981 shall be exempt from these monitoring requirements subject to receipt and approval of an affidavit by the staff director.
flue gas desulfurization equipment shall be exempt from these monitoring requirements.
whose particulate emissions are controlled with baghouses which emit from multiple stacks or vents shall be exempt from these opacity monitoring requirements.
(F) Compliance.
ities shall submit a plan for meeting the requirements of this rule to the staff director within sixty (60) days (May 24, 1976) of its effective date (March 25, 1976).
other provision of this rule, no owner or operator of a facility affected by this rule will be deemed to be in compliance until the compliance plan receives the written approval of the staff director.
ties affected by this rule shall comply within twelve (12) months (March 25, 1977) of its effective date (March 25, 1976).
AUTHORITY: section 203.050, RSMo 1986. Original rule filed Dec. 5, 1969, effective Dec. 15, 1969. Amended: Filed Jan. 14, 1977, effective July 11, 1977.