Mo. Code Regs. Ann. tit. 10, § 10-2.390
PURPOSE: This rule implements section 176(c) of the Clean Air Act (CAA), as amended (42 U.S.C. 7401 et seq.), and the related requirements of 23 U.S.C. 109(j), with respect to the conformity of transportation plans, programs, and projects which are developed, funded, or approved by the United States Department of Transportation (DOT), and by metropolitan planning organizations (MPOs) or other recipients of funds under Title 23 U.S.C. or the Federal Transit Laws (49 U.S.C. Chapter 53). This rule sets forth policy, criteria, and procedures for demonstrating and assuring conformity of such activities to the applicable implementation plan, developed pursuant to section 110 and Part D of the CAA. This rule applies to the Kansas City ozone maintenance area.
(1) Definitions.
(EPA) regulations, other United States Department of Transportation (DOT) regulations, or other state or local air quality or transportation rules, in that order of priority. Definitions for some terms used in this rule may be found in 10 CSR 10-6.020.
(B) Additional definitions specific to this rule are as follows:
Ambient Air Quality Standard (NAAQS)— the one (1)-hour ozone national ambient air quality standard codified at 40 CFR 50.9;
Ambient Air Quality Standard (NAAQS)— the eight (8)-hour ozone national ambient air quality standard codified at 40 CFR 50.10;
defined in section 302(q) of the CAA, the portion (or portions) of the implementation plan for ozone, or most recent revision thereof, which has been approved under section 110, or promulgated under section 110(c), or promulgated or approved pursuant to regulations promulgated under section 301(d) and which implements the relevant requirements of the CAA;
ed (42 U.S.C., 7401 et seq.);
tion for a project—
violation of a standard in the area substantially affected by the project or over a region which would otherwise not be in violation of the standard during the future period in question, if the project were not implemented; or
a manner that would increase the frequency or severity of a new violation of a standard in such area;
data determined by EPA to meet the requirements of 40 Code of Federal Regulations (CFR) part 58 that indicate attainment of the national ambient air quality standards;
conformity process, one (1) party confers with another identified party, provides all information to that party needed for meaningful input, and considers the views of that party and responds to those views in a timely, substantive written manner prior to any final decision on such action. Such views and written response shall be made part of the record of any decision or action;
revision—the implementation plan which contains specific strategies for controlling the emissions of and reducing ambient levels of pollutants in order to satisfy CAA requirements for demonstrations of reasonable further progress and attainment (including implementation plan revisions submitted to satisfy CAA sections 172(c), 182(b)(1), 182(c)(2)(A), 182(c)(2)(B), 187(a)(7), 187(g), 189(a)(1)(B), 189(b)(1)(A), and 189(d); sections 192(a) and 192(b), for nitrogen dioxide; and any other applicable CAA provision requiring a demonstration of reasonable further progress or attainment);
identified by the project, e.g., freeway, expressway, arterial highway, grade-separated highway, reserved right-of-way rail transit, mixed traffic rail transit, exclusive busway, etc.;
which will affect the proposed facility’s impact on regional emissions, usually as they relate to vehicle or person carrying capacity and control, e.g., number of lanes or tracks to be constructed or added, length of project, signalization, access control including approximate number and location of interchanges, preferential treatment for high-occupancy vehicles, etc.;
side a metropolitan planning area boundary, but inside the boundary of a nonattainment or maintenance area that contains any part of a metropolitan area(s). These areas are not isolated rural nonattainment and maintenance areas;
of Transportation;
Agency;
Administration of DOT;
pose of this rule, any highway or transit project which is proposed to receive funding assistance and approval through the Federal- Aid Highway Program or the Federal Mass Transit Program, or requires Federal Highway Administration (FHWA) or Federal Transit Administration (FTA) approval for some aspect of the project, such as connection to an interstate highway or deviation from applicable design standards on the interstate system;
transportation plan, the period covered by the transportation plan pursuant to 23 CFR part 450;
tration of DOT;
implement or modify a highway facility or highway-related program. Such an undertaking consists of all required phases necessary for implementation. For analytical purposes, it must be defined sufficiently to—
sufficient length to address environmental matters on a broad scope;
icance, i.e., be usable and be a reasonable expenditure even if no additional transportation improvements in the area are made; and
natives for other reasonably foreseeable transportation improvements;
transportation plan describes the envisioned transportation system according to section (6) of this rule;
likely future localized carbon monoxide (CO) Specific to the Kansas City Metropolitan Area
and particulate matter (PM10) pollutant concentrations and a comparison of those concentrations to the national ambient air quality standards. Hot-spot analysis assesses impacts on a scale smaller than the entire nonattainment or maintenance area, including, for example, congested roadway intersections and highways or transit terminals, and uses an air quality dispersion model to determine the effects of emissions on air quality;
to cause a location or region to exceed a standard more often or to cause a violation at a greater concentration than previously existed and/or would otherwise exist during the future period in question, if the project were not implemented;
maintenance areas—areas that do not contain or are not part of any metropolitan planning area as designated under the transportation planning regulations. Isolated rural areas do not have federally required metropolitan transportation plans or transportation improvement programs (TIPs) and do not have projects that are part of the emissions analysis of any metropolitan planning organization’s (MPO’s) metropolitan transportation plan or TIP. Projects in such areas are instead included in statewide transportation improvement programs. These areas are not donut areas;
tion for a transportation plan or transportation improvement program (TIP) has expired, and thus there is no currently conforming transportation plan and TIP;
tenance plan that EPA has determined meets EPA’s limited maintenance plan policy criteria for a given NAAQS and pollutant. To qualify for a limited maintenance plan, for example, an area must have a design value that is significantly below a given NAAQS, and it must be reasonable to expect that a NAAQS violation will not result from any level of future motor vehicle emissions growth;
region of the United States previously designated nonattainment pursuant to the CAA Amendments of 1990 and subsequently redesignated to attainment subject to the requirement to develop a maintenance plan under section 175A of the CAA, as amended;
tion plan under a section 175A of the CAA, as amended;
geographic area in which the metropolitan transportation planning process required by 23 U.S.C. 134 and section 8 of the Federal Transit Act must be carried out;
(MPO)—that organization designated as being responsible, together with the state, for conducting the continuing, cooperative, and comprehensive planning process under 23 U.S.C. 134 and Title 49 U.S.C. 5303. It is the forum for cooperative transportation decision-making. The Mid-America Regional Council is the MPO for the Kansas City metropolitan area and the organization responsible for conducting the planning required under section 174 of the CAA;
CAA sections 182(g)(1) and 189(c) for serious and above ozone nonattainment areas and PM10 nonattainment areas, respectively. For all other nonattainment areas, a milestone consists of an emissions level and the date on which that level is to be achieved as required by the applicable CAA provision for reasonable further progress towards attainment;
that portion of the total allowable emissions defined in the submitted or approved control strategy implementation plan revision or maintenance plan for a certain date for the purpose of meeting reasonable further progress milestones or demonstrating attainment or maintenance of the National Ambient Air Quality Standards (NAAQS), for any criteria pollutant or its precursors, allocated to highway and transit vehicle use and emissions. For purposes of meeting the conformity test required under sections (18) and/or (19) of this rule, the motor vehicle emissions budget in the applicable Missouri State Implementation Plan shall be combined with the motor vehicle emissions budget for the same pollutant in the applicable Kansas State Implementation Plan;
Standards (NAAQS)—those standards established pursuant to section 109 of the CAA;
Policy Act of 1969, as amended (42 U.S.C. 4321 et seq.);
purposes of this rule, with respect to FHWA or FTA, the point at which there is a specific action to make a determination that a project is categorically excluded, to make a Finding of No Significant Impact, or to issue a record of decision on a Final Environmental Impact Statement under NEPA;
ic region of the United States which has been designated as nonattainment under section 107 of the CAA for any pollutant for which a national ambient air quality standard exists;
project; 10 CSR 10-2
by EPA that a submitted control strategy implementation plan revision contains adopted control measures or written commitments to adopt enforceable control measures that fully satisfy the emissions reductions requirements relevant to the statutory provision for which the implementation plan revision was submitted, such as reasonable further progress or attainment;
Title 23 U.S.C. or Title 49 U.S.C.—any agency at any level of state, county, city, or regional government that routinely receives Title 23 U.S.C. or Title 49 U.S.C. funds to construct FHWA/FTA projects, operate FHWA/FTA projects or equipment, purchase equipment, or undertake other services or operations via contracts or agreements. This definition does not include private landowners or developers, or contractors or entities that are only paid for services or products created by their own employees;
transportation project (other than an exempt project) that is on a facility which serves regional transportation needs (such as access to and from the area outside of the region, major activity centers in the region, major planned developments such as new retail malls, sports complexes, etc., or transportation terminals, as well as most terminals themselves) and would normally be included in the modeling of a metropolitan area’s transportation network, including at a minimum: all principal arterial highway and all fixed guideway transit facilities that offer an alternative to regional highway travel;
which the total projected emissions from all sources of a given pollutant are less than the total emissions that would satisfy the applicable requirement for reasonable further progress, attainment, or maintenance;
quality standard;
ment program (STIP)—a staged, multi-year, intermodal program of transportation projects which is consistent with the statewide transportation plan and planning processes and metropolitan transportation plans, transportation improvement programs (TIPs) and processes, developed pursuant to 23 CFR part 450;
the official statewide, intermodal transportation plan that is developed through the statewide transportation planning process, pursuant to 23 CFR part 450;
bus, rail, or other conveyance which provides general or special service to the public on a regular and continuing basis. It does not include school buses or charter or sightseeing services;
implement or modify a transit facility or transit-related program; purchase transit vehicles or equipment; or provide financial assistance for transit operations. It does not include actions that are solely within the jurisdiction of local transit agencies, such as changes in routes, schedules, or fares. It may consist of several phases. For analytical purposes, it must be defined inclusively enough to—
sufficient length to address environmental matters on a broad scope;
pendent significance, i.e., be a reasonable expenditure even if no additional transportation improvements in the area are made; and
natives for other reasonably foreseeable transportation improvements;
(TCM)—any measure that is specifically identified and committed to in the applicable implementation plan that is either one (1) of the types listed in section 108 of the CAA, or any other measure for the purpose of reducing emissions or concentrations of air pollutants from transportation sources by reducing vehicle use or changing traffic flow or congestion conditions. Notwithstanding the first sentence of this definition, vehicle technology-based, fuel-based, and maintenance-based measures which control the emissions from vehicles under fixed traffic conditions are not TCMs for the purposes of this rule;
gram (TIP)—a staged, multiyear, intermodal program of transportation projects covering a metropolitan planning area which is consistent with the metropolitan transportation plan, and developed pursuant to 23 CFR part 450;
intermodal metropolitan transportation plan that is developed through the metropolitan planning process for the metropolitan planning area, developed pursuant to 23 CFR part 450;
way project or a transit project; and
poses of this rule, a written commitment that includes a description of the action to be taken; a schedule for the completion of the action; a demonstration that funding necessary to implement the action has been authorized by the appropriating or authorizing body; and an acknowledgement that the commitment is an enforceable obligation under the applicable implementation plan.
(2) Applicability. After EPA revokes the one (1)-hour ozone standard, if any Missouri portion of the Kansas City metropolitan area is redesignated as a nonattainment area for any transportation-related criteria pollutant, the provisions of this rule shall apply to the Missouri counties and the portions of Missouri counties located within the redesignated nonattainment area.
(A) Action Applicability.
(2)(C) of this rule or section (26), conformity determinations are required for—
proval or support of transportation plans and transportation plan amendments developed pursuant to 23 CFR part 450 or 49 CFR part 613 by a MPO or DOT;
or support of TIPs and TIP amendments developed pursuant to 23 CFR part 450 or 49 CFR part 613 by a MPO or DOT; and
mentation of FHWA/FTA projects.
required under this rule for individual projects which are not FHWA/FTA projects. However, section (21) applies to such projects if they are regionally significant.
(B) Emissions Applicability.
respect to emissions of the following criteria pollutant: ozone, carbon monoxide (CO), nitrogen dioxide (NO2), particles with an aerodynamic diameter less than or equal to a nominal 10 micrometers (PM10); and particles with an aerodynamic diameter less than or equal to a nominal 2.5 micrometers (PM2.5).
with respect to emissions of the following precursor pollutants:
(VOC) and nitrogen oxides (NOx) in ozone areas;
the EPA regional administrator or the director of the state air agency has made a finding that transportation-related emissions of one (1) or both of these precursors within the nonattainment area are a significant contributor to the PM10 nonattainment problem and has so notified the MPO and DOT, or if applicable implementation plan (or implementation plan submission) establishes an approved (or adequate) budget for such emissions as part of the reasonable further progress, attainment or maintenance strategy.
PM2.5 nonattainment and maintenance areas with respect to PM2.5 from re-entrained road dust if the EPA regional administrator or the director of the state air agency has made a finding that re-entrained road dust emissions within the area are a significant contributor to the PM2.5 nonattainment problem and has so notified the MPO and DOT, or if the applicable implementation plan (or implementation plan submission) includes re-entrained road dust in the approved (or adequate) budget as part of the reasonable further progress, attainment or maintenance strategy. Reentrained road dust emissions are produced by travel on paved and unpaved roads (including emissions from anti-skid and deicing materials).
the Clay, Jackson and Platte Counties maintenance area for twenty (20) years from the date EPA approves the area’s request under section 107(d) of the CAA for redesignation to attainment, unless the applicable implementation plan specifies that the provisions of this rule shall apply for more than twenty (20) years.
(C) Limitations. In order to receive any FHWA/FTA approval or funding actions, including NEPA approvals, for a project phase subject to this subpart, a currently conforming transportation plan and TIP must be in place at the time of project approval as described in section (14), except as provided by subsection (14)(B).
the NEPA process and a conformity determination have been completed by DOT may proceed toward implementation without further conformity determinations unless more than three (3) years have elapsed since the most recent major step (NEPA process completion; start of final design; acquisition of a significant portion of the right-of-way; or approval of the plans, specifications and estimates) occurred. All phases of such projects which were considered in the conformity determination are also included, if those phases were for the purpose of funding final design, rightof-way acquisition, construction, or any combination of these phases.
the project will be required if there is a significant change in project design concept and scope, if a supplemental environmental document for air quality purposes is initiated, or if three (3) years have elapsed since the most recent major step to advance the project occurred.
CO, PM10, PM2.5 or NO2 since 1990 and are subsequently redesignated to nonattainment or designated nonattainment for any NAAQS for any of these pollutants, the provisions of this rule shall not apply with respect to that NAAQS for twelve (12) months following the effective date of final designation to nonattainment for each NAAQS for such pollutant.
(4) Frequency of Conformity Determinations.
(B) Frequency of Conformity Determinations for Transportation Plans.
demonstrated to conform before the transportation plan is approved by the MPO or accepted by DOT.
be found to conform before the transportation plan revisions are approved by the MPO or accepted by DOT, unless the revision merely adds or deletes exempt projects listed in sections (26) and (27) and has been made in accordance with the notification provisions of subparagraph (5)(C)1.F. The conformity determination must be based on the transportation plan and the revision taken as a whole.
the conformity of the transportation plan (including a new regional emission analysis) no less frequently than every three (3) years. If more than three (3) years elapse after DOT’s conformity determination without the MPO and DOT determining conformity of the transportation plan, the existing conformity determination will lapse.
(C) Frequency of Conformity Determinations for Transportation Improvement Programs.
conform before the TIP is approved by the MPO or accepted by DOT.
conformity determination for the entire TIP before the amendment is approved by the MPO or accepted by DOT, unless the amendment merely adds or deletes exempt projects listed in section (26) or section (27) and has been made in accordance with the notification provisions of subparagraph (5)(C)1.G.
the conformity of the TIP (including a new regional emission analysis) no less frequently than every three (3) years. If more than three (3) years elapse after DOT’s conformity determination without the MPO and DOT determining conformity of the TIP, the existing conformity determination will lapse.
(E) Triggers for Transportation Plan and TIP Conformity Determinations. Conformity of existing transportation plans and TIPs must be redetermined within eighteen (18) months of the following, or the existing conformity determination will lapse, and no new project-level conformity determinations may be made until conformity of the transportation plan and TIP has been determined by the MPO and DOT—
that motor vehicle emissions budgets from an initially submitted control strategy implementation plan or maintenance plan are adequate pursuant to subsection (18)(E) and can be used for transportation conformity purposes;
a control strategy implementation plan revision or maintenance plan which establishes or revises a motor vehicle emissions budget if that budget has not yet been used in a conformity determination prior to approval; and
tion of an implementation plan which establishes or revises a motor vehicle emissions budget.
(5) Consultation.
(A) General. Procedures for interagency consultation (federal, state, and local), resolution of conflicts, and public consultation are described in subsections (A) through (E) of this section. Public consultation procedures meet the requirements for public involvement in 23 CFR part 450.
required shall include procedures for interagency consultation (federal, state, and local), resolution of conflicts, and public consulta- 10 CSR 10-2
tion as described in subsections (A) through (E) of this section. Public consultation procedures will be developed in accordance with the requirements for public involvement in 23 CFR part 450.
portation will provide reasonable opportunity for consultation with state air agencies, local air quality and transportation agencies, DOT, and EPA, including consultation on the issues described in paragraph (C)1. of this section, before making conformity determinations.
(B) Interagency Consultation Procedures— General Factors.
regional transportation policy advisory committee, state transportation agencies, state and local air quality agencies, and regional air quality policy advisory organization designated by the state air quality agencies under the provisions of CAA section 174 shall participate in an interagency consultation process in accordance with this section with each other and with FHWA and FTA and EPA on the development of the implementation plan, the list of TCMs in the applicable implementation plan, the unified planning work program under 23 CFR section 450.314, the transportation plan, the TIP, and any revisions to the preceding documents. Use of existing advisory committee structures will be the preferred mechanism for interagency consultation during the early stages of planning or programming processes. Expansion of representation will occur as necessary to assure that consulting agencies have the opportunity to receive background information as it is developed and share ideas and concerns early in the planning or programming process. Where consultation takes place outside of existing advisory committee structures, local government transportation interests will be represented by four (4) persons (representing transit and roadway interests from each state) appointed by the chairs of the regional transportation policy advisory committee and local government air quality interests will be represented by four persons (at least one (1) from each state) appointed by the chairs of the regional air quality advisory organization. The air quality representation shall not duplicate representation from transportation agencies.
ing agencies.
sibility of the agency(ies) with the responsibility for preparing the final document to initiate the consultation process by notifying other participants of the proposed planning or programming process for the development of the following planning or programming documents: the regional transportation plan and the regional TIP, including revisions, the unified planning work program, and any conformity determinations, with the MPO as the responsible agency; the statewide transportation plan and STIP for northern Clay and northern and western Platte Counties, with the state transportation agency as the responsible agency; and the state air quality implementation plans with motor vehicle emissions budgets and control strategies, including revisions, with the state air quality agency in cooperation with the MPO as the responsible agencies.
process for each type of document listed in subparagraph (5)(B)2.A. of this rule shall be assured by the agency responsible for that document, by meeting the requirements of parts (5)(B)2.A.(I)–(III) of this rule.
gramming process must include at a minimum the following:
of each agency at each stage in the planning process, including technical meetings;
level of regular consultation;
providing ready access to) draft documents and supporting materials for comment before formal adoption or publication;
for convening, consultation meetings and responsibilities for establishing meeting agendas; and
the significant comments of involved agencies.
cy of the consultation process will be reviewed and determined for each type of planning or programming document by consensus of the consultation agencies at a meeting convened by the responsible agency for that purpose. These procedures shall subsequently become binding on all parties until such time as the procedures are revised by consensus of the consulting agencies.
or programming processes must meet two (2) tests—
must be provided early in the planning process. Early participation is intended to facilitate sharing of information needed for meaningful input and to allow the consulting agencies to confer with the responsible agency during the formative stages of the plan or program. At a minimum, proposed transportation planning or programming processes must specifically include opportunities for the consulting agencies to confer upon the conformity analysis required to make conformity determinations for transportation plans and TIPs prior to consideration of draft documents by the regional air quality advisory organization, the regional transportation policy advisory committee or the state transportation agency for the transportation planning area outside of the metropolitan planning area for transportation planning. Air quality planning processes must specifically include opportunities for the consulting agencies to confer upon the motor vehicle emissions budget before the budget is considered by the regional air quality advisory organization, the regional transportation policy advisory committee, and the state air quality agency. Additionally, if TCMs are to be considered in transportation plans, TIPs or the state implementation plan, specific opportunities to consult upon TCMs by air quality and transportation agencies must be provided; and
opportunities must be provided prior to any final action by any responsible agency listed in subparagraph (5)(B)2.A. of this rule. Prior to formal action approving any plan or program, the consulting agencies must be given an opportunity to communicate their views in writing to the responsible agency. The responsible agency must consider the views of the consulting agencies and respond in writing to those views in a timely and complete manner prior to any final action on any plan or program. Such views and written response shall be made part of the record of any decision or action. Opportunities for formal consulting agency comment may run concurrent with other public review time frames. Participation or lack of participation by a consulting agency early in the planning or programming process has no bearing on their opportunity to submit formal comment prior to official action by the responsible agency.
tions.
consulting agencies shall meet no less frequently than once per calendar year for the specific purpose of reviewing changes in transportation and air quality planning assumptions that could potentially impact the state implementation plan (SIP) motor vehicle emissions inventory, motor vehicle emissions budget and/or conformity determinations.
bility of each of the consulting agencies to advise the MPO of any pending changes in their planning assumptions. The MPO shall be responsible for convening a meeting to review planning assumptions in August of each year, unless an alternate date is agreed to by the consulting agencies, and at such other times as any of the consulting agencies proposes a change to any of these planning inputs. The purpose of the meeting(s) is to share information and evaluate the potential impacts of any proposed changes in planning assumptions, and to inform each other regarding the timetable and scope of any upcoming studies or analyses that may lead to future revision of planning assumptions.
to undertake a data collection, planning or study process to evaluate a planning assumption that may have a significant impact on the state implementation plan (SIP) motor vehicle emissions inventory, motor vehicle emissions budget and/or conformity determinations, all of the consulting agencies shall be given an opportunity to provide advisory input into that process. Examples of data, planning or study topics that may be of interest in this context include (but are not limited to):
eled;
travel speeds;
employment projections;
eling assumptions;
ing future travel speeds;
model; and
ing future vehicle miles traveled.
or transportation planning assumptions is proposed that may have a significant impact on the SIP motor vehicle emissions inventory, motor vehicle emissions budget and/or conformity determinations, the agency proposing the change must provide all of the consulting agencies an opportunity to review the basis for the proposed change. All consulting agencies shall be given at least thirty (30) days to evaluate the impact of a proposed change in planning assumptions prior to final action by the agency proposing the change. (In the case of an EPA motor vehicle emissions model change, this would occur as part of the federal rulemaking process.)
ity of the responsible agency to maintain a complete and accurate record of all agreements, planning and programming processes, and consultation activities required under this rule and to make these documents available Specific to the Kansas City Metropolitan Area
for public inspection upon request. In addition, it shall be the affirmative responsibility of the responsible agency to supply the following information for inclusion in a notebook maintained within the offices of each of the conformity consulting agencies and at local public libraries. The MPO shall be responsible for distribution of information to the libraries. Copies of the following information shall be provided to all of the other consulting agencies and additional copies as the MPO prescribes shall be provided to the MPO for placement in public libraries in the Kansas City region—
or air quality document specified in paragraph (5)(B)2. of this rule and undergoing public comment pending final action by the responsible agency. Copies for distribution to local libraries must be delivered to the MPO at least three (3) business days prior to the beginning of the public comment period;
gramming processes for transportation plans, TIPs and SIPs identified in paragraph (5)(B)2. of this rule, after approval by consensus of the consulting agencies; and
maries of final planning and programming documents for the general public. This summary information must be accompanied by a complete list of all supporting information, reports, studies, and texts which provide background or further information, along with the location of the documents and instructions on how they can be accessed. Summaries of final documents shall be provided to the other consulting agencies and to the MPO within fourteen (14) days of final approval by the responsible agency. Summaries of the following documents are specifically required:
program;
population and employment;
areas within the air quality planning area but outside of the metropolitan planning area for transportation;
improvement program;
ment program for areas within the air quality planning area but outside of the metropolitan planning area for transportation;
emissions inventories, including motor vehicle emissions budgets; and (VIII) The most recent analysis upon which a transportation/air quality conformity determination was made for a transportation plan or TIP.
(C) Interagency Consultation Procedures: Specific Processes. Interagency consultation procedures shall also include the following specific processes:
in accordance with subsection (5)(B) of this rule involving the MPO, the regional transportation policy advisory committee, the regional air quality advisory organization, the state transportation and air quality agencies, EPA, FHWA and FTA shall be undertaken for the following:
(or models) and associated methods and assumptions to be used in hot-spot analyses and regional emissions analyses;
and other transportation projects should be considered “regionally significant” for the purposes of regional emissions analysis (in addition to those functionally classified as principal arterial or higher or fixed guideway systems or extensions that offer an alternative to regional highway travel), and which projects should be considered to have a significant change in design concept and scope from the transportation plan or TIP. This process shall be initiated by the MPO and conducted in accordance with paragraph (5)(B)3. of this rule regarding changes in planning assumptions;
wise exempted from meeting the requirements of this rule (see sections (26) and (27)) should be treated as non-exempt in cases where potential adverse emissions impacts may exist for any reason. This process shall be initiated by the MPO and conducted in accordance with paragraph (5)(B)2. of this rule in the context of the transportation planning and TIP programming processes;
included in the applicable implementation plan. This process shall be initiated by the MPO and conducted in accordance with paragraph (5)(B)2. of this rule in the context of the state air quality implementation plan development process;
required by paragraph (13)(C)1., whether past obstacles to implementation of TCMs which are behind the schedule established in the applicable implementation plan have been identified and are being overcome, and whether state and local agencies with influence over approvals or funding for TCMs are giving maximum priority to approval or funding for TCMs. This process shall be initiated by the MPO and conducted in accordance with paragraph (5)(B)2. of this rule in the 10 CSR 10-2
context of the transportation planning and TIP programming processes. This process shall also consider whether delays in TCM implementation necessitate revisions to the applicable implementation plan to remove TCMs or substitute TCMs or other emission reduction measures;
or TIP revisions or amendments which merely add or delete exempt projects listed in section (26) or section (27). This process shall be initiated by the MPO and conducted in accordance with paragraph (5)(B)2. of this rule in the context of the transportation planning and TIP programming processes. The MPO shall notify all conformity consulting agencies in writing within seven (7) calendar days after taking action to approve such exempt projects. The notification shall include enough information about the exempt projects for the consulting agencies to determine their agreement or disagreement that the projects are exempt under section (26) or section (27) of this rule;
included in the regional emissions analysis supporting the current conforming TIP’s conformity determination, even if the project is not strictly included in the TIP for purposes of MPO project selection or endorsement, and whether the project’s design concept and scope have not changed significantly from those which were included in the regional emissions analysis, or in a manner which would significantly impact use of the facility. This process shall be initiated by the MPO and conducted in accordance with paragraph (5)(B)2. of this rule in the context of the TIP programming process;
cle miles traveled (VMT) to use in establishing or tracking emissions budgets, developing transportation plans, TIPs, or applicable implementation plans, or making conformity determinations. This process shall be initiated by the MPO and conducted in accordance with paragraph (5)(B)3. of this rule regarding planning assumptions;
sonable professional practice for the purposes of section (22). This process shall be initiated by the MPO and conducted in accordance with paragraph (5)(B)3. of this rule regarding planning assumptions;
sponsor or the MPO has demonstrated that the requirements of section (18) are satisfied without a particular mitigation or control measure, as provided in subsection (25)(D). This process shall be initiated by the MPO and conducted in accordance with paragraph (5)(B)2. of this rule in the context of the transportation planning and TIP programming processes;
tion (23)(B), projects located at sites in PM10 nonattainment areas which have vehicle and roadway emission and dispersion characteristics which are essentially identical to those at sites which have violations verified by monitoring, and therefore require quantitative PM10 hot-spot analysis; and
methodologies for isolated rural nonattainment and maintenance areas, as required by paragraph (9)(L)2.
in accordance with subsection (5)(B) of this rule involving the MPO, the regional air quality advisory organization, the regional transportation policy advisory committee and the state air quality and transportation agencies for the following:
ger new conformity determinations in addition to those triggering events established in section (4). This process shall be initiated by the MPO and conducted in accordance with paragraph (5)(B)3. of this rule regarding planning assumptions when there is a significant change in any planning assumption (examples: new regional forecast of population and employment, actual vehicle miles traveled (VMT) estimates significantly different from planning projections, etc.); and
for transportation activities which cross the borders of the MPOs or nonattainment or maintenance area or air basin. This process shall be initiated by the MPO and conducted in accordance with paragraph (5)(B)2. of this rule.
planning area for transportation planning that does not include the entire nonattainment or maintenance area, the interagency consultation process described in subsection (5)(B) of this rule shall be supplemented by a formal memorandum of agreement, incorporated in the applicable state implementation plan, executed by the MPO and the state air quality and transportation agencies for cooperative planning and analysis. This executed memorandum of agreement shall specify procedures for determining conformity of all regionally significant transportation projects outside the metropolitan planning boundary for transportation planning and within the nonattainment or maintenance area.
cess established by the executed memorandum of agreement for such an area shall apply in addition to all other consultation requirements.
of agreement establishing a state transportation planning area outside of the MPO metropolitan planning area for transportation planning, but within the nonattainment or maintenance area, shall provide for state air quality agency concurrence in conformity determinations for areas outside of the metropolitan planning boundary for transportation planning, but within the nonattainment or maintenance area. Such agreement shall also establish a process involving the MPO and the state transportation agency in cooperative planning and analysis for determining conformity of all projects outside the metropolitan planning area for transportation planning and within the nonattainment or maintenance area in the context of the total regional transportation system that serves the nonattainment or maintenance area.
shall be undertaken to ensure that plans for construction of regionally significant projects which are not FHWA/FTA projects (including projects for which alternative locations, design concept and scope, or the no-build option are still being considered), including those by recipients of funds designated under Title 23 U.S.C. or Title 49 U.S.C., are disclosed to the MPO on a regular basis, and to ensure that any changes to those plans are immediately disclosed. This process shall be initiated by the MPO and conducted in accordance with paragraph (5)(B)2. of this rule in the context of the transportation planning and TIP programming processes. At a minimum, the disclosure procedures shall meet the requirements of subparagraph (5)(B)4.A.–C. of this rule.
ly significant project, and any agency that becomes aware of any such project through applications for approval, permitting or funding shall disclose such project to the MPO in a timely manner. Such disclosure shall be made not later than the first occasion when any of the following actions is sought: any policy board action necessary for the project to proceed, the issuance of administrative permits for the facility or for construction of the facility, the execution of a contract to design or construct the facility, the execution of any indebtedness for the facility, any final action of a board, commission or administrator authorizing or directing employees to proceed with design, permitting or construction of the project, or the execution of any contract to design or construct or any approval needed for any facility that is dependent on the completion of a regionally significant project. The sponsor of any potential regionally significant project shall disclose to the MPO each project for which alternatives have been identified through the NEPA process, and, in particular, any preferred alternative that may be a regionally significant project. This information shall be provided to the MPO in accordance with the time sequence and procedures established under paragraph (5)(B)2. of this rule for each transportation planning and TIP development process.
significant project that has not been disclosed to the MPO and other agencies participating in the consultation process before action is taken to adopt or approve, such regionally significant project shall be deemed not to be included in the regional emissions analysis supporting the currently conforming TIP’s conformity determination and not to be consistent with the motor vehicle emissions budget in the applicable implementation plan, for the purposes of section (21).
(5)(C)4. of this rule, the phrase adopt or approve of a regionally significant project means the first time any action necessary to authorizing a project occurs, such as any policy board action necessary for the project to proceed, the issuance of administrative permits for the facility or for construction of the facility, the execution of a contract to construct the facility, any final action of a board, commission or administrator authorizing or directing employees to proceed with construction of the project, or any written decision or authorization from the MPO that the project may be adopted or approved.
shall be undertaken in accordance with subsection (5)(B) of this rule involving the MPO and other recipients of funds designated under Title 23 U.S.C. or Title 49 U.S.C. for assuming the location and design concept and scope of projects which are disclosed to the MPO as required by paragraph (5)(C)4. of this rule but whose sponsors have not yet decided these features in sufficient detail to perform the regional emissions analysis according to the requirements of section (22). This process shall be initiated by the MPO and conducted in accordance with paragraph (5)(B)3. of this rule as it relates to planning assumptions.
outlined in subsection (5)(B) of this rule involves the MPO, the regional transportation policy advisory committee, the regional air quality advisory organization, and the state transportation and air quality agencies shall be undertaken for the design, schedule, and funding of research and data collection efforts and regional transportation model development by the MPO (e.g., household/travel Specific to the Kansas City Metropolitan Area
transportation surveys). This process shall be initiated by the MPO and conducted in accordance with paragraph (5)(B)3. of this rule as it relates to planning assumptions.
documents (including applicable implementation plans and implementation plan revisions) and supporting information to each agency after approval or adoption. This process is applicable to all agencies described in paragraph (A)1. of this section, including federal agencies.
(D) Resolving Conflicts.
between state agencies and the MPO regarding a final action on any conformity determination by the MPO on a plan or program subject to these consultation requirements shall be escalated to the governor(s), if the conflict cannot be resolved by the heads of the involved agencies. Such agencies shall make every effort to resolve any differences, including personal meetings between the heads of such agencies or their policy-level representatives, to the extent possible.
air quality agencies in writing of the disposition of all air quality agency comments on a proposed conformity determination, state air quality agencies shall have fourteen (14) calendar days from the date that the written notification is received to appeal such proposed determination of conformity to the governor of Missouri. If the Missouri air quality agency appeals to the governor of Missouri, the final conformity determination will automatically become contingent upon concurrence of the governor of Missouri. If the Kansas air quality agency presents an appeal to the governor of Missouri regarding a conflict involving both Kansas and Missouri agencies or the MPO, the final conformity determination will automatically become contingent upon concurrence of both the governor of Missouri and the governor of Kansas. The Missouri air quality agency shall provide notice of any appeal under this subsection to the MPO, and the state transportation agencies, and the Kansas air quality agency. If neither state air quality agency appeals to the governor(s) within fourteen (14) days of receiving written notification, the MPO may proceed with the final conformity determination.
(6) Content of Transportation Plans.
(A) Transportation Plans Adopted after January 1, 1997, in Serious, Severe, or Extreme Ozone Nonattainment Areas. If the metropolitan planning area contains an urbanized area population greater than two hundred thousand (>200,000), the transportation plan must specifically describe the transportation system envisioned for certain future years which shall be called horizon years.
ing the transportation plan, after consultation in accordance with section (5), may choose any years to be horizon years, subject to the following restrictions:
than ten (10) years apart;
more than ten (10) years from the base year 10 CSR 10-2
used to validate the transportation demand planning model;
span of the transportation plan, the attainment year must be a horizon year; and
last year of the transportation plan’s forecast period.
2. For these horizon years—
tify and document the demographic and employment factors influencing expected transportation demand, including land use forecasts, in accordance with implementation plan provisions and the consultation requirements specified by section (5);
shall be described in terms of the regionally significant additions or modifications to the existing transportation network which the transportation plan envisions to be operational in the horizon years. Additions and modifications to the highway network shall be sufficiently identified to indicate intersections with existing regionally significant facilities, and to determine their effect on route options between transportation analysis zones. Each added or modified highway segment shall also be sufficiently identified in terms of its design concept and design scope to allow modeling of travel times under various traffic volumes, consistent with the modeling methods for area-wide transportation analysis in use by the MPO. Transit facilities, equipment, and services envisioned for the future shall be identified in terms of design concept, design scope, and operating policies that are sufficient for modeling of their transit ridership. Additions and modifications to the transportation network shall be described sufficiently to show that there is a reasonable relationship between expected land use and the envisioned transportation system; and
cies, requirements, services, and activities, including intermodal activities, shall be described.
(B) Two (2)-Year Grace Period for Transportation Plan Requirements in Certain Ozone and CO Areas. The requirements of subsection (A) of this section apply to such areas or portions of such areas that have previously not been required to meet these requirements for any existing NAAQS two (2) years from the following:
cation of an ozone or CO nonattainment area that has an urbanized area population greater than two hundred thousand (>200,000) to serious or above;
Bureau that determines the urbanized area population of a serious or above or CO nonattainment area to be greater than two hundred thousand (>200,000); or
classifies a newly designated ozone or CO nonattainment area that has an urbanized area population greater than two hundred thousand (>200,000) as serious or above.
(9) Criteria and Procedures for Determining Conformity of Transportation Plans, Programs, and Projects—General.
(B) Table 1 in this section indicates the criteria and procedures in sections (10)–(19) which apply for transportation plans, TIPs, and FHWA/FTA projects. Subsections (C) through (I) of this section explain when the budget, interim emissions, and hot-spot tests are required for each pollutant and NAAQS. Subsection (J) of this section addresses conformity requirements for areas with approved or adequate limited maintenance plans. Subsection (K) of this section addresses nonattainment and maintenance areas which EPA has determined have insignificant motor vehicle emissions. Subsection (L) of this section addresses isolated rural nonattainment and maintenance areas. Subsection (D) of this section explains when budget and emission reduction tests are required for CO nonattainment and maintenance areas. Table 1 follows:
Table 1. Conformity Criteria
All Actions at all Times— Section (10) Latest planning assumptions Section (11) Latest emissions model Section (12) Consultation
Transportation Plan— Subsection (13)(B) TCMs Section (18) and/or Section (19) Emissions budget and/or interim emissions TIP— Subsection (13)(C) TCMs Section (18) and/or Section (19) Emissions budget and/or interim emissions
Project (From a Conforming Plan and TIP)— Section (14) Currently conforming plan and TIP Section (15) Project from a conforming plan and TIP Section (16) CO and PM10 hot spots Section (17) PM10 and PM2.5 control measures
Project (Not From a Conforming Plan and TIP)— Subsection (13)(D) TCMs Section (14) Currently conforming plan and TIP Section (16) CO and PM10 hot spots Section (17) PM10 and PM2.5 Control Measures Section (18) and/or Section (19) Emissions budget and/or interim emissions
(C) One (1)-Hour Ozone NAAQS Nonattainment and Maintenance Areas. This subsection applies when an area is nonattainment or maintenance for the one (1)-hour ozone NAAQS (i.e., until the effective date of any revocation of the one (1)-hour ozone NAAQS for an area). In addition to the criteria listed in Table 1 in subsection (B) of this section that are required to be satisfied at all times, in ozone nonattainment and maintenance areas conformity determinations must include a demonstration that the budget and/or interim emissions tests are satisfied as described in the following:
ment and maintenance areas the budget test must be satisfied as required by section (18) for conformity determinations made on or after—
that a motor vehicle emissions budget in a submitted control strategy implementation plan revision or maintenance plan for the one (1)-hour ozone NAAQS is adequate for transportation conformity purposes;
approval of such a budget in the Federal Register; or
approval of such a budget in the Federal Register, if such approval is completed through direct final rulemaking;
required to submit a control strategy implementation plan revision for the one (1)-hour ozone NAAQS (usually moderate and above areas), the interim emissions tests must be satisfied as required by section (19) for conformity determinations made when there is no approved motor vehicle emissions budget from an applicable implementation plan for the one (1)-hour ozone NAAQS and no adequate motor vehicle emissions budget from a submitted control strategy implementation plan revision or maintenance plan for the one (1)-hour ozone NAAQS;
satisfy the interim emissions test for NOX, as required by section (19), if the implementation plan or plan submission that is applicable for the purposes of conformity determinations is a fifteen percent (15%) plan or Phase I attainment demonstration that does not include a motor vehicle emissions budget for NOX. The implementation plan for the one (1)-hour ozone NAAQS will be considered to establish a motor vehicle emissions budget for NOX if the implementation plan or plan submission contains an explicit NOX motor vehicle emissions budget that is intended to act as a ceiling on future NOX emissions, and the NOX motor vehicle emissions budget is a Specific to the Kansas City Metropolitan Area
net reduction from NOX emissions levels in 1990;
not submitted a maintenance plan and that are not required to submit a control strategy implementation plan revision for the one (1)- hour ozone NAAQS (usually marginal and below areas) must satisfy one (1) of the following requirements—
required by section (19); or
implementation plan revision for the one (1)- hour NAAQS that contains motor vehicle emissions budget(s) and a reasonable further progress or attainment demonstration, and the budget test required by section (18) must be satisfied using the adequate or approved motor vehicle emissions budget(s) (as described in paragraph (C)1. of this section); and
and (C)2. of this section, moderate and above ozone nonattainment areas with three (3) years of clean data for the one (1)-hour ozone NAAQS that have not submitted a maintenance plan and that EPA has determined are not subject to the Clean Air Act reasonable further progress and attainment demonstration requirements for the one (1)-hour ozone NAAQS must satisfy one (1) of the following requirements—
required by section (19);
tion (18), using the adequate or approved motor vehicle emissions budgets in the submitted or applicable control strategy implementation plan for the one (1)-hour ozone NAAQS (subject to the timing requirements of paragraph (C)1. of this section); or
tion (18), using the motor vehicle emissions of ozone precursors in the most recent year of clean data as motor vehicle emissions budgets, if such budgets are established by the EPA rulemaking that determines that the area has clean data for the one (1)-hour ozone NAAQS.
(D) Eight (8)-Hour Ozone NAAQS Nonattainment and Maintenance Areas without Motor Vehicle Emissions Budgets for the One (1)-Hour Ozone NAAQS for any Portion of the Eight (8)-Hour Nonattainment Area. This subsection applies to areas that were never designated nonattainment for the one (1)-hour ozone NAAQS and areas that were designated nonattainment for the one (1)-hour ozone NAAQS but that never submitted a control strategy SIP or maintenance plan with approved or adequate motor vehicle emissions budgets. This subsection applies one (1) year after the effective date of EPA’s nonattainment designation for the eight (8)-hour ozone NAAQS for an area, according to subsection (2)(D). In addition to the criteria listed in Table 1 in subsection (B) of this section that are required to be satisfied at all times, in such eight (8)-hour ozone nonattainment and maintenance areas conformity determinations must include a demonstration that the budget and/or interim emissions tests are satisfied as described in the following:
tainment and maintenance areas the budget test must be satisfied as required by section (18) for conformity determinations made on or after—
that a motor vehicle emissions budget in a submitted control strategy implementation plan revision or maintenance plan for the eight (8)-hour ozone NAAQS is adequate for transportation conformity purposes;
approval of such a budget in the Federal Register; or
approval of such a budget in the Federal Register, if such approval is completed through direct final rulemaking.
required to submit a control strategy implementation plan revision for the eight (8)-hour ozone NAAQS (usually moderate and above and certain Clean Air Act, part D, subpart 1 areas), the interim emissions tests must be satisfied as required by section (19) for conformity determinations made when there is no approved motor vehicle emissions budget from an applicable implementation plan for the eight (8)-hour ozone NAAQS and no adequate motor vehicle emissions budget from a submitted control strategy implementation plan revision or maintenance plan for the eight (8)-hour ozone NAAQS.
tainment area must satisfy the interim emissions test for NOx, as required by section (19), if the implementation plan or plan submission that is applicable for the purposes of conformity determinations is a fifteen percent (15%) plan or other control strategy SIP that addresses reasonable further progress that does not include a motor vehicle emissions budget for NOx. The implementation plan for the eight (8)-hour ozone NAAQS will be considered to establish a motor vehicle emissions budget for NOx if the implementation plan submission contains an explicit NOx motor vehicle emissions budget that is intended to act as a ceiling on future NOx emissions, and the NOx motor vehicle emissions budget is a net reduction from NOx emissions levels in 2002. 10 CSR 10-2
not submitted a maintenance plan and that are not required to submit a control strategy implementation plan revision for the eight (8)-hour ozone NAAQS (usually marginal and certain Clean Air Act, part D, subpart 1 areas) must satisfy one (1) of the following requirements—
required by section (19); or
implementation plan revision for the eight (8)-hour ozone NAAQS that contains motor vehicle emissions budget(s) and a reasonable further progress or attainment demonstration, and the budget test required by section (18) must be satisfied using the adequate or approved motor vehicle emissions budget(s) (as described in paragraph (D)1. of this section).
and (D)2. of this section, ozone nonattainment areas with three (3) years of clean data for the eight (8)-hour ozone NAAQS that have not submitted a maintenance plan and that EPA has determined are not subject to the Clean Air Act reasonable further progress and attainment demonstration requirements for the eight (8)-hour ozone NAAQS must satisfy one (1) of the following requirements—
required by section (19);
tion (18), using the adequate or approved motor vehicle emissions budgets in the submitted or applicable control strategy implementation plan for the eight (8)-hour ozone NAAQS (subject to the timing requirements of paragraph (D)1. of this section); or
tion (18), using the motor vehicle emissions of ozone precursors in the most recent year of clean data as motor vehicle emissions, if such budgets are established by the EPA rulemaking that determines that the area has clean data for the eight (8)-hour ozone NAAQS.
(E) Eight (8)-Hour Ozone NAAQS Nonattainment and Maintenance Areas with Motor Vehicle Emissions Budgets for the One (1)-Hour Ozone NAAQS that Cover All or a Portion of the Eight (8)-Hour Nonattainment Area. This provision applies one (1) year after the effective date of EPA’s nonattainment designation for the eight (8)-hour ozone NAAQS for an area, according to subsection (2)(D). In addition to the criteria listed in Table 1 in subsection (B) of this section that are required to be satisfied at all times, in such eight (8)-hour ozone nonattainment and maintenance areas conformity determinations must include a demonstration that the budget and/or interim emissions tests are satisfied as described in the following:
tainment and maintenance areas the budget test must be satisfied as required by section (18) for conformity determinations made on or after—
that a motor vehicle emissions budget in a submitted control strategy implementation plan revision or maintenance plan for the eight (8)-hour ozone NAAQS is adequate for transportation conformity purposes;
approval of such budget in the Federal Register; or
approval of such a budget in the Federal Register, if such approval is completed through direct final rulemaking.
tion applying, the following test(s) must be satisfied, subject to the exception in subparagraph (E)2.E.—
tainment area covers the same geographic area as the one (1)-hour ozone nonattainment or maintenance area(s), the budget test as required by section (18) using the approved or adequate motor vehicle emissions budgets in the one (1)-hour ozone applicable implementation plan or implementation plan submission;
tainment area covers a smaller geographic area within the one (1)-hour ozone nonattainment or maintenance area(s), the budget test as required by section (18) for either—
ment area using corresponding portion(s) of the approved or adequate motor vehicle emissions budgets in the one (1)-hour ozone applicable implementation plan or implementation plan submission where such portion(s) can reasonably be identified through the interagency consultation process required by section (5); or
ment area using the approved or adequate motor vehicle emissions budgets in the one (1)-hour ozone applicable implementation plan or implementation plan submission. If additional emissions reductions are necessary to meet the budget test for the eight (8)-hour ozone NAAQS in such cases, these emissions reductions must come from within the eight (8)-hour nonattainment area;
tainment area covers a larger geographic area and encompasses the entire one (1)-hour ozone nonattainment or maintenance area(s)—
section (18) for the portion of the eight (8)- hour ozone nonattainment area covered by the approved or adequate motor vehicle emissions budgets in the one (1)-hour ozone applicable implementation plan or implementation plan submission; and
required by section (19) for either—the portion of the eight (8)-hour ozone nonattainment area not covered by the approved or adequate budgets in the one (1)-hour ozone implementation plan, the entire eight (8)- hour ozone nonattainment area, or the entire portion of the eight (8)-hour ozone nonattainment area within an individual state, in the case where separate one (1)-hour SIP budgets are established for each state of a multi-state one (1)-hour nonattainment or maintenance area;
tainment area partially covers a one (1)-hour ozone nonattainment or maintenance area(s)—
section (18) for the portion of the eight (8)- hour ozone nonattainment area covered by the corresponding portion of the approved or adequate motor vehicle emissions budgets in the one (1)-hour ozone applicable implementation plan or implementation plan submission where they can be reasonably identified through the interagency consultation process required by section (5); and
required by section (19), when applicable, for either—the portion of the eight (8)-hour ozone nonattainment area not covered by the approved or adequate budgets in the one (1)- hour ozone implementation plan, the entire eight (8)-hour ozone nonattainment area, or the entire portion of the eight (8)-hour ozone nonattainment area within an individual state, in the case where separate one (1)-hour SIP budgets are established for each state in a multi-state one (1)-hour nonattainment or maintenance area.
(E)2.A., B., C., or D. of this section, the interim emissions tests as required by section (19), where the budget test using the approved or adequate motor vehicle emissions budgets in the one (1)-hour ozone applicable implementation plan(s) or implementation plan submission(s) for the relevant area or portion thereof is not the appropriate test and the interim emissions tests are more appropriate to ensure that the transportation plan, TIP, or project not from a conforming plan and TIP will not create new violations, worsen existing violations, or delay timely attainment of the eight (8)-hour ozone standard, as determined through the interagency consultation process required by section (5).
tainment area must satisfy the interim emissions test for NOx, as required by section (19), if the only implementation plan or plan submission that is applicable for the purposes of conformity determinations is a fifteen percent (15%) plan or other control strategy SIP that addresses reasonable further progress that does not include a motor vehicle emissions budget for NOx. The implementation plan for the eight (8)-hour ozone NAAQS will be considered to establish a motor vehicle emissions budget for NOx if the implementation plan or plan submission contains an explicit NOx motor vehicle emissions budget that is intended to act as a ceiling on future NOx emissions, and the NOx motor vehicle emissions budget is a net reduction from NOx emissions levels in 2002. Prior to an adequate or approved NOx motor vehicle emissions budget in the implementation plan submission for the eight (8)-hour ozone NAAQS, the implementation plan for the one (1)-hour ozone NAAQS will be considered to establish a motor vehicle emissions budget for NOx if the implementation plan contains an explicit NOx motor vehicle emissions budget that is intended to act as a ceiling on future NOx emissions, and the NOx motor vehicle emissions budget is a net reduction from NOx emissions levels in 1990.
and (E)2. of this section, ozone nonattainment areas with three (3) years of clean data for the eight (8)-hour ozone NAAQS that have not submitted a maintenance plan and that EPA has determined are not subject to the Clean Air Act reasonable further progress and attainment demonstration requirements for the eight (8)-hour ozone NAAQS must satisfy one (1) of the following requirements—
emissions tests as required by sections (18) and (19) and as described in paragraph (E)2. of this section;
tion (18), using the adequate or approved motor vehicle emissions budgets in the submitted or applicable control strategy implementation plan for the eight (8)-hour ozone NAAQS (subject to the timing requirements of paragraph (E)1. of this section); or
tion (18), using the motor vehicle emissions of ozone precursors in the most recent year of clean data as motor vehicle emissions budgets, if such budgets are established by the EPA rulemaking that determines that the area has clean data for the eight (8)-hour ozone NAAQS. Specific to the Kansas City Metropolitan Area
(F) CO Nonattainment and Maintenance Areas. In addition to the criteria listed in Table 1 in subsection (B) of this section that are required to be satisfied at all times, in CO nonattainment and maintenance areas conformity determinations must include a demonstration that the hot spot, budget and/or interim emissions tests are satisfied as described in the following:
tainment or maintenance areas must satisfy the hot-spot test required by section (16) at all times. Until a CO attainment demonstration or maintenance plan is approved by EPA, FHWA/FTA projects must also satisfy the hot-spot test required by subsection (16)(B).
nance areas the budget test must be satisfied as required by section (18) for conformity determinations made on or after—
that a motor vehicle emissions budget in a submitted control strategy implementation plan revision or maintenance plan is adequate for transportation conformity purposes;
approval of such a budget in the Federal Register; or
approval of such a budget in the Federal Register, if such approval is completed through direct final rulemaking.
of this section, in CO nonattainment areas the interim emissions tests must be satisfied as required by section (19) for conformity determinations made when there is no approved motor vehicle emissions budget from an applicable implementation plan and no adequate motor vehicle emissions budget from a submitted control strategy implementation plan revision or maintenance plan.
submitted a maintenance plan and that are not required to submit an attainment demonstration (e.g., moderate CO areas with a design value of 12.7 ppm or less or not classified CO areas) must satisfy one (1) of the following requirements:
required by section (19); or
implementation plan revision that contains motor vehicle emissions budget(s) and an attainment demonstration, and the budget test required by section (18) must be satisfied using the adequate or approved motor vehicle emissions budget(s) (as described in paragraph (F)2. of this section).
(G) PM10 Nonattainment and Maintenance Areas. In addition to the criteria listed in Table 1 of subsection (B) of this section that are required to be satisfied at all times, in PM10 nonattainment and maintenance areas conformity determinations must include a demonstration that the hot-spot, budget and/or interim emissions tests are satisfied as described in the following:
tainment or maintenance areas must satisfy the hot-spot test required by subsection (16)(A).
nance areas the budget test must be satisfied as required by section (18) for conformity determinations made on or after—
that a motor vehicle emissions budget in a submitted control strategy implementation plan revision or maintenance plan is adequate for transportation conformity purposes;
approval of such a budget in the Federal Register; or
approval of such a budget in the Federal Register, if such approval is completed through direct final rulemaking.
interim emissions tests must be satisfied as required by section (19) for conformity determinations made—
cle emissions budget from an applicable implementation plan and no adequate motor vehicle emissions budget from a submitted control strategy implementation plan revision or maintenance plan; or
plan revision is a demonstration of impracticability under CAA section 189(a)(1)(B)(ii) and does not demonstrate attainment.
(H) NO2 Nonattainment and Maintenance Areas. In addition to the criteria listed in Table 1 in subsection (B) of this section that are required to be satisfied at all times, in NO2 nonattainment and maintenance areas conformity determinations must include a demonstration that the budget and/or interim emissions tests are satisfied as described in the following:
nance areas the budget test must be satisfied as required by section (18) for conformity determinations made on or after—
that a motor vehicle emissions budget in a submitted control strategy implementation plan revision or maintenance plan is adequate for transportation conformity purposes;
approval of such a budget in the Federal Register; or
approval of such a budget in the Federal 10 CSR 10-2
Register, if such approval is completed through direct final rulemaking.
im emissions tests must be satisfied as required by section (19) for conformity determinations made when there is no approved motor vehicle emissions budget from an applicable implementation plan and no adequate motor vehicle emissions budget from a submitted control strategy implementation plan revision or maintenance plan.
(I) PM2.5 Nonattainment and Maintenance Areas. In addition to the criteria listed in Table 1 in subsection (B) of this section that are required to be satisfied at all times, in PM2.5 nonattainment and maintenance areas conformity determinations must include a demonstration that the budget and/or interim emissions tests are satisfied as described in the following:
nance areas the budget test must be satisfied as required by section (18) for conformity determinations made on or after—
that a motor vehicle emissions budget in a submitted control strategy implementation plan revision or maintenance plan is adequate for transportation conformity purposes;
approval of such a budget in the Federal Register; or
approval of such a budget in the Federal Register, if such approval is completed through direct final rulemaking.
interim emissions tests must be satisfied as required by section (19) for conformity determinations made if there is no approved motor vehicle emissions budget from an applicable implementation plan and no adequate motor vehicle emissions budget from a submitted control strategy implementation plan revision or maintenance plan.
(L) Isolated Rural Nonattainment and Maintenance Areas. This subsection applies to any nonattainment or maintenance area (or portion thereof) which does not have a metropolitan transportation plan or TIP and whose projects are not part of the emissions analysis of any MPO’s metropolitan transportation plan or TIP. This subsection does not apply to “donut” areas which are outside the metropolitan planning boundary and inside the nonattainment/maintenance area boundary.
rural nonattainment and maintenance areas must satisfy the requirements of sections (10), (11), (12), (16), and (17) and subsection (13)(D). Until EPA approves the control strategy implementation plan or maintenance plan for a rural CO nonattainment or maintenance area, FHWA/FTA projects must also satisfy the requirements of subsection (16)(B) (“Localized CO and PM10 violations (hot spots)”).
maintenance areas are subject to the budget and/or interim emissions tests as described in subsections (C) through (K) of this section, with the following modifications—
(18) and (19) apply to isolated rural nonattainment and maintenance areas, references to “transportation plan” or “TIP” should be taken to mean those projects in the statewide transportation plan or statewide TIP which are in the rural nonattainment or maintenance area.
maintenance areas that are subject to section (18), FHWA/FTA projects must be consistent with motor vehicle emissions budget(s) for the years in the time frame of the attainment demonstration or maintenance plan. For years after the attainment year (if a maintenance plan has not been submitted) or after the last year of the maintenance plan, FHWA/FTA projects must satisfy one (1) of the following requirements—
al emissions analysis for NOx in all ozone nonattainment and maintenance areas, nonwithstanding paragraph (19)(F)2.; or
quality dispersion model or other air quality modeling technique used in the attainment demonstration or maintenance plan, the FHWA/FTA project, in combination with all other regionally significant projects expected in the area in the time frame of the statewide transportation plan, must not cause or contribute to any new violation of any standard in any areas; increase the frequency or severity of any existing violation of any standard in any area; or delay timely attainment of any standard or any required interim emission reductions or other milestones in any area. Control measures assumed in the analysis must be enforceable.
paragraph (L)2.B. of this section and the methodology used to meet the requirements of part (L)2.B.(III) of this section must be determined through the interagency consultation process required in subparagraph (5)(C)1.G. through which the relevant recipients of Title 23 U.S.C. or Title 49 U.S.C. funds, the local air quality agency, the state air quality agency, and the state department of transportation should reach consensus about the option and methodology selected. EPA and DOT must be consulted through this process as well. In the event of unresolved disputes, conflicts may be escalated to the governor consistent with the procedure in subsection (5)(D), which applies for any state air agency comments on a conformity determination.
(10) Criteria and Procedures—Latest Planning Assumptions.
(11) Criteria and Procedures—Latest Emissions Model.
(B) EPA will consult with DOT to establish a grace period following the specification of any new model.
three (3) months and no more than twentyfour (24) months after notice of availability is published in the Federal Register.
depend on the degree of change in the model and the scope of replanning likely to be necessary by MPOs in order to assure conformity. If the grace period will be longer than three (3) months, EPA will announce the appropriate grace period in the Federal Register.
(13) Criteria and Procedures—Timely Implementation of TCMs.
(B) For transportation plans, this criterion is satisfied if the following two (2) conditions are met:
the envisioned future transportation system, provides for the timely completion or implementation of all TCMs in the applicable implementation plan which are eligible for funding under Title 23 U.S.C. or the Federal Transit Laws, consistent with schedules included in the applicable implementation plan; and
interferes with the implementation of any TCM in the applicable implementation plan.
(C) For TIPs, this criterion is satisfied if the following conditions are met:
and funding source(s) needed to fully implement each TCM indicates that TCMs which are eligible for funding under Title 23 U.S.C. or the Federal Transit Laws, are on or ahead of the schedule established in the applicable implementation plan, or, if such TCMs are behind the schedule established in the applicable implementation plan, the MPO and DOT have determined that past obstacles to implementation of the TCMs have been identified and have been or are being overcome, and that all state and local agencies with influence over approvals or funding for TCMs are giving maximum priority to approval or funding of TCMs over other projects within their control, including projects in locations outside the nonattainment or maintenance area.
tation plan have previously been programmed for federal funding but the funds have not been obligated and the TCMs are behind the schedule in the implementation plan, then the TIP cannot be found to conform if the funds intended for those TCMs are reallocated to projects in the TIP other than TCMs, or if there are no other TCMs in the TIP, if the funds are reallocated to projects in the TIP other than projects which are eligible for federal funding intended for air quality improvement projects, e.g., the Congestion Mitigation and Air Quality Improvement Program; and
the implementation of any TCM in the applicable implementation plan.
(14) Criteria and Procedures—Currently Conforming Transportation Plan and TIP. There must be a currently conforming transportation plan and currently conforming TIP at the time of project approval.
(4) of this rule.
(15) Criteria and Procedures—Projects From a Plan and TIP.
(B) A project is considered to be from a conforming transportation plan if one (1) of the following conditions applies:
identified in the transportation plan in order to satisfy section (6) Content of Transportation Plans of this rule, the project is specifically included in the conforming transportation plan and the project’s design concept and scope have not changed significantly from those which were described in the transportation plan, or in a manner which would significantly impact use of the facility; or
be specifically identified in the transportation plan, the project is identified in the conforming transportation plan, or is consistent with the policies and purpose of the transportation plan and will not interfere with other projects specifically included in the transportation plan.
(C) A project is considered to be from a conforming program if the following conditions are met:
forming TIP and the design concept and scope of the project were adequate at the time of the TIP conformity determination to determine its contribution to the TIP’s regional emissions, and the project design concept and scope have not changed significantly from those which were described in the TIP; and
concept and scope which includes projectlevel emissions mitigation or control measures, written commitments to implement such measures must be obtained from the project sponsor and/or operator as required by subsection (25)(A) in order for the project to be considered from a conforming program. Any change in these mitigation or control measures that would significantly reduce their effectiveness constitutes a change in the design concept and scope of the project.
(16) Criteria and Procedures—Localized CO and PM10 Violations (Hot Spots).
(18) Criteria and Procedures—Motor Vehicle Emissions Budget.
(10) years apart, as follows:
ted—
milestone years and the attainment year) for which the control strategy implementation plan revision establishes motor vehicle emissions budget(s) must be less than or equal to that year’s motor vehicle emissions budget(s); and
motor vehicle emissions budget(s) are specifically established must be less than or equal to the motor vehicle emissions budget(s) established for the most recent prior year. For example, emissions in years after the attainment year for which the implementation plan does not establish a budget must be less than or equal to the motor vehicle emissions budget(s) for the attainment year.
submitted—
equal to the motor vehicle emissions budget(s) established for the last year of the maintenance plan, and for any other years for which the maintenance plan establishes motor vehicle emissions budgets. If the maintenance plan does not establish motor vehicle emissions budgets for any years other than the last year of the maintenance plan, the demonstration of consistency with the motor vehicle emissions budget(s) must be accompanied by a qualitative finding that there are no factors which would cause or contribute to a new violation or exacerbate an existing violation in the years before the last year of the maintenance plan. The interagency consultation process required by section (5) shall determine what must be considered in order to make such a finding;
maintenance plan, emissions must be less than or equal to the maintenance plan’s motor vehicle emissions budget(s) for the last year of the maintenance plan;
control strategy implementation plan has established motor vehicle emissions budgets for years in the time frame of the transportation plan, emissions in these years must be less than or equal to the control strategy implementation plan’s motor vehicle emissions budget(s) for these years; and
last year of the maintenance plan, emissions must be less than or equal to the motor vehicle emissions budget(s) established for the most recent prior year.
(D) Consistency with the motor vehicle emissions budget(s) must be demonstrated by including emissions from the entire transportation system, including all regionally significant projects contained in the transportation plan and all other regionally significant highway and transit projects expected in the nonattainment or maintenance area in the time frame of the transportation plan.
emissions budget(s) must be demonstrated with a regional emissions analysis that meets the requirements of section (22) and subparagraph (5)(C)1.A. Specific to the Kansas City Metropolitan Area
be performed for any years in the time frame of the transportation plan provided they are not more than ten (10) years apart and provided the analysis is performed for the attainment year (if it is in the time frame of the transportation plan) and the last year of the plan’s forecast period. Emissions in years for which consistency with motor vehicle emissions budgets must be demonstrated, as required in subsection (B) of this section, may be determined by interpolating between the years for which the regional emissions analysis is performed.
(E) Motor Vehicle Emissions Budgets in Submitted Control Strategy Implementation Plan Revisions and Submitted Maintenance Plans.
emissions budgets in submitted control strategy implementation plan revisions or maintenance plans must be demonstrated if EPA has declared the motor vehicle emissions budget(s) adequate for transportation conformity purposes, and the adequacy finding is effective. However, motor vehicle emissions budgets in submitted implementation plans do not supercede the motor vehicle emissions budgets in approved implementation plans for the same Clean Air Act requirement and the period of years addressed by the previously approved implementation plan, unless EPA specifies otherwise in its approval of a SIP.
mentation plan submission’s motor vehicle emissions budget(s) adequate for transportation conformity purposes, the budget(s) shall not be used to satisfy the requirements of this section. Consistency with the previously established motor vehicle emissions budget(s) must be demonstrated. If there are no previous approved implementation plans or implementation plan submissions with adequate motor vehicle emissions budgets, the interim emissions tests required by section (19) must be satisfied.
plan submission’s motor vehicle emissions budget(s) inadequate for transportation conformity purposes after EPA had previously found the budget(s) adequate, and conformity of a transportation plan or TIP has already been determined by DOT using the budget(s), the conformity determination will remain valid. Projects included in that transportation plan or TIP could still satisfy sections (14) and (15), which require a currently conforming transportation plan and TIP to be in place at the time of a project’s conformity determination and that projects come from a conforming transportation plan and TIP.
emissions budget in a submitted control strategy implementation plan revision or maintenance plan to be adequate for transportation conformity purposes unless the following minimum criteria are satisfied:
implementation plan revision or maintenance plan was endorsed by the governor (or his or her designee) and was subject to a state public hearing;
mentation plan or maintenance plan was submitted to EPA, consultation among federal, state, and local agencies occurred; full implementation plan documentation was provided to EPA; and EPA’s stated concerns, if any, were addressed;
get(s) is clearly identified and precisely quantified;
get(s), when considered together with all other emissions sources, is consistent with applicable requirements for reasonable further progress, attainment, or maintenance (whichever is relevant to the given implementation plan submission);
get(s) is consistent with and clearly related to the emissions inventory and the control measures in the submitted control strategy implementation plan revision or maintenance plan; and
control strategy implementation plans or maintenance plans explain and document any changes to previously submitted budgets and control measures; impacts on point and area source emissions; any changes to established safety margins (see section (1) for definition); and reasons for the changes (including the basis for any changes related to emission factors or estimates of vehicle miles traveled).
submitted motor vehicle emissions budget, EPA will review the state’s compilation of public comments and response to comments that are required to be submitted with any implementation plan. EPA will document its consideration of such comments and responses in a letter to the state indicating the adequacy of the submitted motor vehicle emissions budget.
budget(s) used to satisfy the requirements of this section are established by an implementation plan submittal that has not yet been approved or disapproved by EPA, the MPO and DOT’s conformity determinations will be deemed to be a statement that the MPO and DOT are not aware of any information that 10 CSR 10-2
would indicate that emissions consistent with the motor vehicle emissions budget will cause or contribute to any new violation of any standard; increase the frequency or severity of any existing violation of any standard; or delay timely attainment of any standard or any required interim emission reductions or other milestones.
(F) Adequacy Review Process for Implementation Plan Submissions. EPA will use the procedure listed in paragraph (F)1. or (F)2. of this section to review the adequacy of an implementation plan submission—
an implementation plan submission prior to EPA’s final action on the implementation plan—
EPA’s website when EPA receives an implementation plan submission that will be reviewed for adequacy;
thirty (30) days to comment on the adequacy of the implementation plan submission. If the complete implementation plan is not accessible electronically through the Internet and a copy is requested within fifteen (15) days of the date of the website notice, the comment period will be extended for thirty (30) days from the date that a copy of the implementation plan is mailed;
closes, EPA will inform the state in writing whether EPA has found the submission adequate or inadequate for use in transportation conformity, including response to any comments submitted directly and review of comments submitted through the state process, or EPA will include the determination of adequacy or inadequacy in a proposed or final action approving or disapproving the implementation plan under subparagraph (F)2.C. of this section.
Register notice to inform the public of EPA’s finding. If EPA finds the submission adequate, the effective date of this finding will be fifteen (15) days from the date the notice is published as established in the Federal Register notice, unless EPA is taking a final approval action on the SIP as described in subparagraph (F)2.C. of this section.
implementation plan submission is adequate or inadequate for use in transportation conformity on EPA’s website. The website will also include EPA’s response to comments if any comments were received during the public comment period.
sion adequate, EPA has cause to reconsider this finding, EPA will repeat actions described in subparagraphs (F)1.A. through E. or paragraph (F)2. of this section unless EPA determines that there is no need for additional public comment given the deficiencies of the implementation plan submission. In all cases where EPA reverses its previous finding to a finding of inadequacy under paragraph (F)1. of this section, such a finding will become effective immediately upon the date of EPA’s letter to the state.
sion inadequate, EPA has cause to reconsider the adequacy of that budget, EPA will repeat actions described in subparagraphs (F)1.A. through E. or paragraph (F)2. of this section.
an implementation plan submission simultaneously with EPA’s approval or disapproval of the implementation plan—
proposed or direct final rulemaking will serve to notify the public that EPA will be reviewing the implementation plan submission for adequacy.
proposed rulemaking will start a public comment period of at least thirty (30) days.
implementation plan submission is adequate and thus can be used for conformity either in EPA’s final rulemaking or through the process described in subparagraphs (F)1.C. through E. of this section. If EPA makes an adequacy finding through a final rulemaking that approves the implementation plan submission, such a finding will become effective upon the publication of EPA’s approval in the Federal Register, or upon the effective date of EPA’s approval if such action is conducted through direct final rulemaking. EPA will respond to comments received directly and review comments submitted through the state process and include the response to comments in the applicable docket.
(19) Criteria and Procedures—Interim Emissions in Areas without Motor Vehicle Emissions Budgets.
(B) Ozone Areas. The requirements of this paragraph apply to all one (1)-hour ozone and eight (8)-hour ozone NAAQS areas, except for certain requirements as indicated. This criterion may be met—
tainment areas that are subject to the reasonable further progress requirements of CAA section 182(b)(1) if a regional emissions analysis that satisfies the requirements of section (22) and subsections (G) through (J) of this section demonstrates that for each analysis year and for each of the pollutants described in subsection (F) of this section—
“Action” scenario are less than the emissions predicted in the “Baseline” scenario, and this can be reasonably expected to be true in the periods between the analysis years; and
“Action” scenario are lower than—
amount, in areas for the one (1)-hour ozone NAAQS as described in subsection (9)(C); or
amount, in areas for the eight (8)-hour ozone NAAQS as described in subsections (9)(D) and (E).
tainment areas and other ozone nonattainment areas that are not subject to the reasonable further progress requirements of CAA section 182(b)(1) if a regional emissions analysis that satisfies the requirements of section (22) and subsections (G) through (J) of this section demonstrates that for each analysis year and for each of the pollutants described in subsection (F) of this section—
“Action” scenario are not greater than the emissions predicted in the “Baseline” scenario, and this can be reasonably expected to be true in the periods between the analysis years; or
“Action” scenario are not greater than—
one (1)-hour ozone NAAQS as described in subsection (9)(C); or
eight (8)-hour ozone NAAQS as described in subsections (9)(D) and (E).
(C) CO Areas. This criterion may be met—
greater than 12.7 ppm and serious CO nonattainment areas that are subject to CAA section 187(a)(7) if a regional emissions analysis that satisfies the requirements of section (22) and subsections (G) through (J) of this section demonstrates that for each analysis year and for each of the pollutants described in subsection (F) of this section—
“Action” scenario are less than the emissions predicted in the “Baseline” scenario, and this can be reasonably expected to be true in the periods between the analysis years; and
“Action” scenario are lower than 1990 emissions by any nonzero amount.
less than 12.7 ppm and not classified CO nonattainment areas if a regional emissions analysis that satisfies the requirements of section (22) and subsections (G) through (J) of this section demonstrates that for each analysis year and for each of the pollutants described in subsection (F) of this section—
“Action” scenario are not greater than the emissions predicted in the “Baseline” scenario, and this can be reasonably expected to be true in the periods between the analysis years; or
“Action” scenario are not greater than 1990 emissions.
(D) PM10 and NO2 Areas. This criterion may be met in PM10 and NO2 nonattainment areas; a regional emissions analysis that satisfies the requirements of section (22) and subsections (G) and (J) of this section demonstrates that for each analysis year and for each of the pollutants described in subsection (F) of this section, one (1) of the following requirements is met—
“Action” scenario are not greater than the emissions predicted in the “Baseline” scenario, and this can be reasonably expected to be true in the periods between the analysis years; or
“Action” scenario are not greater than baseline emissions. Baseline emissions are those estimated to have occurred during calendar year 1990, unless a conformity plan defines the baseline emissions for a PM10 area to be those occurring in a different calendar year for which a baseline emissions inventory was developed for the purpose of developing a control strategy implementation plan.
(G) and (J) of this section demonstrates that for each analysis year and for each of the pollutants described in subsection (F) of this section, one (1) of the following requirements is met—
“Action” scenario are not greater than the emissions predicted in the “Baseline” scenario, and this can be reasonably expected to be true in the periods between the analysis years; or Specific to the Kansas City Metropolitan Area
“Action” scenario are not greater than 2002 emissions.
(F) Pollutants. The regional emissions analysis must be performed for the following pollutants:
administrator determines that additional reductions of NOX would not contribute to attainment;
EPA regional administrator or the director of the state air agency has made a finding that one or both of such precursor emissions from within the area are a significant contributor to the PM10 nonattainment problem and has so notified the MPO and DOT;
only if the EPA regional administrator or the director of the state air agency has made a finding that emissions from re-entrained road dust within the area are a significant contributor to the PM2.5 nonattainment problem and has so notified the MPO and DOT.
(G) Analysis Years.
be performed for analysis years that are no more than ten (10) years apart. The first analysis year must be no more than five (5) years beyond the year in which the conformity determination is being made. The last year of transportation plan’s forecast period must also be an analysis year.
(B)2.A., (C)2.A. and paragraphs (D)1., and (E)1. of this section, a regional emissions analysis that satisfies the requirements of section (22) and subsections (G) and (J) of this section would not be required for analysis years in which the transportation projects and planning assumption in the “Action” and “Baseline” scenarios are exactly the same. In such a case, subsection (A) of this section can be satisfied by documenting that the transportation projects and planning assumptions in both scenarios are exactly the same, and consequently, the emissions predicted in the “Action” scenario are not greater than the emissions predicted in the “Baseline” scenario for such analysis years.
(B) through (E) of this section must estimate the emissions that would result from the “Baseline” scenario in each analysis year. The “Baseline” scenario must be defined for each of the analysis years. The “Baseline” scenario is the future transportation system that will result from current programs, including the following (except that exempt projects listed in section (26) and projects exempt from regional emissions analysis as listed in section (27) need not be explicitly considered):
highway and transit facilities, services and activities;
ment or transportation system management activities; and
cant projects, regardless of funding source, which are currently under construction or are undergoing right-of-way acquisition (except for hardship acquisition and protective buying); come from the first year of the previously conforming transportation plan and/or TIP; or have completed the NEPA process.
(26) and projects exempt from regional emissions analysis as listed in section (27) need not be explicitly considered):
in the “Baseline” scenario;
ally significant projects (including facilities, services, and activities) specifically identified in the proposed transportation plan which will be operational or in effect in the analysis year, except that regulatory TCMs may not be assumed to begin at a future time unless the regulation is already adopted by the enforcing jurisdiction or the TCM is identified in the applicable implementation plan;
grams and transportation system management activities known to the MPO, but not included in the applicable implementation plan or utilizing any federal funding or approval, which have been fully adopted and/or funded by the enforcing jurisdiction or sponsoring agency since the last conformity determination;
demand management programs and transportation system management activities 10 CSR 10-2
known to the MPO, but not included in the applicable implementation plan or utilizing any federal funding or approval, which were adopted and/or funded prior to the date of the last conformity determination, but which have been modified since then to be more stringent or effective;
significant highway and transit projects which are not from a conforming transportation plan and TIP; and
significant non-FHWA/FTA highway and transit projects that have clear funding sources and commitments leading toward their implementation and completion by the analysis year.
(20) Consequences of Control Strategy Implementation Plan Failures.
(A) Disapprovals.
control strategy implementation plan revision (with or without a protective finding), the conformity status of the transportation plan and TIP shall lapse on the date that highway sanctions as a result of the disapproval are imposed on the nonattainment area under section 179(b)(1) of the CAA. No new transportation plan, TIP, or project may be found to conform until another control strategy implementation plan revision fulfilling the same CAA requirements is submitted and conformity to this submission is determined.
trol strategy implementation plan revision without making a protective finding, only projects in the first three (3) years of the currently conforming transportation plan and TIP may be found to conform. This means that beginning on the effective date of disapproval without a protective finding, no transportation plan, TIP, or project not in the first three (3) years of the currently conforming transportation plan and TIP may be found to conform until another control strategy implementation plan revision fulfilling the same CAA requirements is submitted, EPA finds its motor vehicle emissions budget(s) adequate pursuant to section (18) of this rule or approves the submission, and conformity to the implementation plan revision is determined.
implementation plan revision, EPA would give a protective finding where a submitted plan contains adopted control measures or written commitments to adopt enforceable control measures that fully satisfy the emissions reductions requirements relevant to the statutory provision for which the implementation plan revision was submitted, such as reasonable further progress or attainment.
(21) Requirements for Adoption or Approval of Projects by Other Recipients of Funds Designated under Title 23 U.S.C. or Title 49 U.S.C.
(A) Except as provided in subsection (B) of this section, no recipient of federal funds designated under Title 23 U.S.C. or Title 49 U.S.C. shall adopt or approve a regionally significant highway or transit project, regardless of funding source, unless the recipient finds that the requirements of one (1) of the following are met:
conforming transportation plan and TIP, and the project’s design concept and scope have not changed significantly from those which were included in the regional emissions analysis for that transportation plan and TIP;
al emissions analysis for the currently conforming transportation plan and TIP conformity determination (even if the project is not strictly included in the transportation plan or TIP for the purpose of MPO project selection or endorsement) and the project’s design concept and scope have not changed significantly from those which were included in the regional emissions analysis; or
including the project and the currently conforming transportation plan and TIP demonstrates that the transportation plan and TIP would still conform if the project were implemented (consistent with the requirements of sections (18) and/or (19) for a project not from a conforming transportation plan and TIP).
(B) In isolated rural nonattainment and maintenance areas subject to subsection (9)(A), no recipient of federal funds designated under Title 23 U.S.C. or Title 49 U.S.C. shall adopt or approve a regionally significant highway or transit project, regardless of funding source, unless the recipient finds that the requirements of one (1) of the following are met:
regional emissions analysis supporting the most recent conformity determination that reflects the portion of the statewide transportation plan and statewide TIP which are in the nonattainment or maintenance area, and the project’s design concept and scope has not changed significantly; or
including the project and all other regionally significant projects expected in the nonattainment or maintenance area demonstrates that those projects in the statewide transportation plan and statewide TIP which are in the nonattainment or maintenance area would still conform if the project was implemented (consistent with the requirements of sections (18) and/or (19) for projects not from a conforming transportation plan and TIP).
(B) of this section, in nonattainment and maintenance areas subject to subsection (9)(J) or (K) for a given pollutant/precursor and NAAQS, no recipient of federal funds designated under Title 23 U.S.C. or Title 49 U.S.C. shall adopt or approve a regionally significant highway or transit project, regardless of funding source, unless the recipient finds that the requirements of one (1) of the following are met for that pollutant/precursor and NAAQS:
recent conformity determination for the transportation plan and TIP and the project’s design concept and scope has not changed significantly; or
recent conformity determination that reflects the portion of the statewide transportation plan and statewide TIP which are in the nonattainment or maintenance area, and the project’s design concept and scope has not changed significantly.
(22) Procedures for Determining Regional Transportation-Related Emissions.
(A) General Requirements.
required by section (18) and section (19) of this rule for the transportation plan, TIP, or project not from a conforming plan and TIP must include all regionally significant projects expected in the nonattainment or maintenance area. The analysis shall include FHWA/FTA projects proposed in the transportation plan and TIP and all other regionally significant projects which are disclosed to the MPO as required by section (5) of this rule. Projects which are not regionally significant are not required to be explicitly modeled, but vehicle miles traveled (VMT) from such projects must be estimated in accordance with reasonable professional practice. The effects of TCMs and similar projects that are not regionally significant may also be estimated in accordance with reasonable professional practice.
include for emissions reduction credit any TCMs or other measures in the applicable implementation plan which have been delayed beyond the scheduled date(s) until such time as their implementation has been assured. If the measure has been partially implemented and it can be demonstrated that it is providing quantifiable emission reduction benefits, the emissions analysis may include that emissions reduction credit.
jects, programs, or activities which require a regulatory action in order to be implemented may not be included in the emissions analysis unless—
adopted by the enforcing jurisdiction;
included in the applicable implementation plan;
tion plan submission or maintenance plan submission that establishes the motor vehicle emissions budget(s) for the purposes of section (18) contains a written commitment to the project, program, or activity by the agency with authority to implement it; or
federally enforced program, EPA has promulgated the program (if the control program is a federal responsibility, such as tailpipe standards), or the Clean Air Act requires the program without need for individual state Specific to the Kansas City Metropolitan Area
action and without any discretionary authority for EPA to set its stringency, delay its effective date, or not implement the program.
of this rule, emission reduction credit from control measures that are not included in the transportation plan and TIP and that do not require a regulatory action in order to be implemented may not be included in the emissions analysis unless the conformity determination includes written commitments to implementation from the appropriate entities.
committing to control measures must comply with the obligations of such commitments.
measures must be obtained prior to a conformity determination, and project sponsors must comply with such commitments.
purpose of satisfying the requirements of section (19) must make the same assumptions in both the “Baseline” and “Action” scenarios regarding control measures that are external to the transportation system itself, such as vehicle tailpipe or evaporative emission standards, limits on gasoline volatility, vehicle inspection and maintenance programs, and oxygenated or reformulated gasoline or diesel fuel.
the regional emissions analysis shall be consistent with those used to establish the emissions budget in the applicable implementation plan. All other factors, for example the fraction of travel in a hot stabilized engine mode, must be consistent with the applicable implementation plan, unless modified after interagency consultation in accordance with subparagraph (5)(C)1.A. to incorporate additional or more geographically specific information or represent a logically estimated trend in such factors beyond the period considered in the applicable implementation plan.
estimate nonattainment or maintenance area vehicle miles traveled (VMT) on off-network roadways within the urban transportation planning area, and on roadways outside the urban transportation planning area.
(B) Regional emissions analysis in serious, severe, and extreme ozone nonattainment areas must meet the requirements of paragraphs (B)1. through 3. of this section if their metropolitan planning area contains an urbanized area population over two hundred thousand (200,000).
of regional transportation-related emissions used to support conformity determinations must be made at a minimum using networkbased travel models according to procedures and methods that are available and in practice and supported by current and available documentation. These procedures, methods, and practices are available from DOT and will be updated periodically. Agencies must discuss these modeling procedures and practices through the interagency consultation process, as required by subparagraph (5)(C)1.A. Network-based travel models must at a minimum satisfy the following requirements—
be validated against observed counts (peak and off-peak, if possible) for a base year that is not more than ten (10) years prior to the date of the conformity determination. Model forecasts must be analyzed for reasonableness and compared to historical trends and other factors, and the results must be documented;
ment, and other network-based travel model assumptions must be documented and based on the best available information;
use must be consistent with the future transportation system alternatives for which emissions are being estimated. The distribution of employment and residences for different transportation options must be reasonable;
methodology must be used, and emissions estimates must be based on a methodology which differentiates between peak and offpeak link volumes and speeds and uses speeds based on final assigned volumes;
used to distribute trips between origin and destination pairs must be in reasonable agreement with the travel times that are estimated from final assigned traffic volumes. Where use of transit currently is anticipated to be a significant factor in satisfying transportation demand, these times should also be used for modeling mode splits; and
be reasonably sensitive to changes in the time(s), cost(s), and other factors affecting travel choices.
with good practice must be used to estimate traffic speeds and delays in a manner that is sensitive to the estimated volume of travel on each roadway segment represented in the network-based travel model.
System (HPMS) estimates of vehicle miles traveled (VMT) shall be considered the primary measure of VMT within the portion of the nonattainment or maintenance area and for the functional classes of roadways included in HPMS, for urban areas which are sampled on a separate urban area basis. For areas 10 CSR 10-2
with network-based travel models, a factor (or factors) may be developed to reconcile and calibrate the network-based travel model estimates of VMT in the base year of its validation to the HPMS estimates for the same period. These factors may then be applied to model estimates of future VMT. In this factoring process, consideration will be given to differences between HPMS and networkbased travel models, such as differences in the facility coverage of the HPMS and the modeled network description. Locally developed count-based programs and other departures from these procedures are permitted subject to the interagency consultation procedures of subparagraph (5)(C)1.A.
(C) Two (2)-Year Grace Period for Regional Emissions Analysis Requirements in Certain Ozone and CO Areas. The requirements of subsection (B) of this section apply to such areas or portions of such areas that have not previously been required to meet these requirements for any existing NAAQS two (2) years from the following:
cation of an ozone or CO nonattainment area that has an urbanized area population greater than two hundred thousand (>200,000) to serious or above;
Bureau that determines the urbanized area population of a serious or above ozone or CO nonattainment area to be greater than two hundred thousand (>200,000); or
classifies a newly designated ozone or CO nonattainment area that has an urbanized area population greater than two hundred thousand (>200,000) as serious or above.
(E) PM10 from Construction-Related Fugitive Dust.
tion plan does not identify construction-related fugitive PM10 as a contributor to the nonattainment problem, the fugitive PM10 emissions associated with highway and transit project construction are not required to be considered in the regional emissions analysis.
nance areas with implementation plans which identify construction-related fugitive PM10 as a contributor to the nonattainment problem, the regional PM10 emissions analysis shall consider construction-related fugitive PM10 and shall account for the level of construction activity, the fugitive PM10 control measures in the applicable implementation plan, and the dust-producing capacity of the proposed activities. from Construction-Related
(F) PM2.5 Fugitive Dust.
mentation plan does not identify construction-related fugitive PM2.5 as a significant contributor to the nonattainment problem, the fugitive PM2.5 emissions associated with highway and transit project construction are not required to be considered in the regional emissions analysis.
nance areas with implementation plans which identify construction-related fugitive PM2.5 as a significant contributor to the nonattainment problem, the regional PM2.5 emissions analysis shall consider construction-related fugitive PM2.5 and shall account for the level of construction activity, the fugitive PM2.5 control measures in the applicable implementation plan, and the dust-producing capacity of the proposed activities.
(G) Reliance on Previous Regional Emissions Analysis.
transportation plan and/or TIP may be demonstrated to satisfy the requirements of section (18) Motor Vehicle Emissions Budget or section (19) Interim Emissions in Areas without Motor Vehicle Emissions Budgets of this rule without new regional analysis if the previous regional emissions analysis also applies to the new plan and/or TIP. This requires a demonstration that—
all projects which must be started in the plan and TIP’s time frames in order to achieve the highway and transit system envisioned by the transportation plan;
are regionally significant are included in the transportation plan with design concept and scope adequate to determine their contribution to the transportation plan’s and/or TIP’s regional emissions at the time of the previous conformity determination;
each regionally significant project in the new plan and/or TIP is not significantly different from that described in the previous transportation plan; and
analysis is consistent with the requirements of section (18) (including that conformity to all currently applicable budgets is demonstrated) and/or section (19), as applicable.
forming transportation plan and a conforming TIP may be demonstrated to satisfy the requirements of section (18) or section (19) of this rule without additional regional emissions analysis if allocating funds to the project will not delay the implementation of projects in the transportation plan or TIP which are necessary to achieve the highway and transit system envisioned by the transportation plan, the previous regional emissions analysis is still consistent with the requirements of section (18) (including that conformity to all currently applicable budgets is demonstrated) and/or section (19) as applicable, and if the project is either—
portation plan (even if it is not specifically included in the latest conforming TIP) with design concept and scope adequate to determine its contribution to the transportation plan’s regional emissions at the time of the transportation plan’s conformity determination, and the design concept and scope of the project is not significantly different from that described in the transportation plan.
relies on subsection (G) of this section does not satisfy the frequency requirements of subsection (4)(B) or (C).
(23) Procedures for Determining Localized CO and PM10 Concentrations (Hot-Spot Analysis).
(A) CO Hot-Spot Analysis.
tion (16) must be based on quantitative analysis using air quality models, databases, and other requirements specified in 40 CFR part 51, Appendix W (Guideline on Air Quality Models). These procedures shall be used in the following cases, unless different procedures developed through the interagency consultation process required in section (5) and approved by the EPA regional administrator are used:
tions, areas, or categories of sites which are identified in the applicable implementation plan as sites of violation or possible violation;
that are at Level-of-Service D, E, or F, or those that will change to Level-of-Service D, E, or F because of increased traffic volumes related to the project;
more of the top three (3) intersections in the nonattainment or maintenance area with highest traffic volumes, as identified in the applicable implementation plan; and
or more of the top three (3) intersections in the nonattainment or maintenance area with the worst level-of-service, as identified in the applicable implementation plan.
paragraph (A)1. of this section, the demonstrations required by section (16) may be based on either—
sent reasonable and common professional practice; or
local factors, if this can provide a clear demonstration that the requirements of section (16) are met.
(B) PM10 Hot-Spot Analysis.
by section (16) must be based on quantitative analysis methods for the following types of projects:
at which violations have been verified by monitoring;
which have vehicle and roadway emission and dispersion characteristics that are essentially identical to those of sites with verified violations (including sites near one at which a violation has been monitored); and
minals and transfer points which increase the number of diesel vehicles congregating at a single location.
are not required, the demonstration required by section (16) may be based on a qualitative consideration of local factors.
described in subparagraphs (B)1.A. and B. of this section, and other cases where quantitative methods are appropriate, shall be determined through the interagency consultation process required in section (5). DOT may choose to make a categorical conformity determination on bus and rail terminals or transfer points based on appropriate modeling of various terminal sizes, configurations, and activity levels.
analysis contained in subsection (23)(B) will not take effect until EPA releases modeling guidance on this subject and announces in the Federal Register that these requirements are in effect.
(C) General Requirements.
must be based on the total emissions burden which may result from the implementation of Specific to the Kansas City Metropolitan Area
the project, summed together with future background concentrations. The total concentrations must be estimated and analyzed at appropriate receptor locations in the area substantially affected by the project.
entire project, and may be performed only after the major design features which will significantly impact concentrations have been identified. The future background concentration should be estimated by multiplying current background by the ratio of future to current traffic and the ratio of future to current emission factors.
be consistent with those in the regional emissions analysis for those inputs which are required for both analyses.
measures shall be assumed in the hot-spot analysis only where there are written commitments from the project sponsor and/or operator to implement such measures, as required by subsection (25)(A).
not required to consider construction-related activities which cause temporary increases in emissions. Each site which is affected by construction-related activities shall be considered separately, using established “Guideline” methods. Temporary increases are defined as those which occur only during the construction phase and last five (5) years or less at any individual site. (24) Using the Motor Vehicle Emissions Budget in the Applicable Implementation Plan (or Implementation Plan Submission).
(A) In interpreting an applicable implementation plan (or implementation plan submission) with respect to its motor vehicle emissions budget(s), the MPO and DOT may not infer additions to the budget(s) that are not explicitly intended by the implementation plan (or submission). Unless the implementation plan explicitly quantifies the amount by which motor vehicle emissions could be higher while still allowing a demonstration of compliance with the milestone, attainment, or maintenance requirement and explicitly states an intent that some or all of this additional amount should be available to the MPO and DOT in the emission budget for conformity purposes, the MPO may not interpret the budget to be higher than the implementation plan’s estimate of future emissions. This applies in particular to applicable implementation plans (or submissions) which demonstrate that after implementation of control measures in the implementation plan—
less than the total emissions that would be consistent with a required demonstration of an emissions reduction milestone;
in achieving attainment prior to the attainment deadline and/or ambient concentrations in the attainment deadline year will be lower than needed to demonstrate attainment; or
to provide for continued maintenance.
(25) Enforceability of Design Concept and Scope and Project-Level Mitigation and Control Measures.
(26) Exempt Projects. Notwithstanding the other requirements of this rule, highway and transit projects of the types listed in Table 2 of this section are exempt from the requirement to determine conformity. Such projects may proceed toward implementation even in the absence of a conforming transportation plan and TIP. A particular action of the type listed in Table 2 of this section is not exempt if the MPO in consultation with other agencies (see subparagraph (5)(C)1.C.), the EPA, and the FHWA (in the case of a highway project) or the FTA (in the case of a transit project) concur that it has potentially adverse emissions impacts for any reason. The state and the MPO must ensure that exempt projects do not interfere with TCM implementation. Table 2 follows:
Table 2—Exempt Projects
Safety Railroad/highway crossing Hazard elimination program Safer nonfederal-aid system roads Shoulder improvements Increasing sight distance Safety improvement program Traffic control devices and operating assistance other than signalization projects Railroad/highway crossing warning devices Guardrails, median barriers, crash cushions Pavement resurfacing or rehabilitation Pavement marking demonstration Emergency relief (23 U.S.C. 125) Fencing Skid treatments Safety roadside rest areas Adding medians Truck climbing lanes outside the urbanized area Lighting improvements Widening narrow pavements or reconstructing bridges (no additional travel lanes) Emergency truck pullovers
Mass Transit Operating assistance to transit agencies Purchase of support vehicles Rehabilitation of transit vehicles1 Purchase of office, shop, and operating equipment for existing facilities Purchase of operating equipment for vehicles (e.g., radios, fare boxes, lifts, etc.) Construction or renovation of power, signal, and communications systems Construction of small passenger shelters and information kiosks Reconstruction or renovation of transit buildings and structures (e.g., rail or bus buildings, storage and maintenance facilities, stations, terminals, and ancillary structures) Rehabilitation or reconstruction of track structures, track, and trackbed in existing rights-of-way Purchase of new buses and rail cars to replace existing vehicles or for minor expansions of the fleet1 Construction of new bus or rail storage/maintenance facilities categorically excluded in 23 CFR part 771
Air Quality Continuation of ride-sharing and van-pooling promotion activities at current levels Bicycle and pedestrian facilities
Other Specific activities which do not involve or lead directly to construction, such as— Planning and technical studies Grants for training and research programs Planning activities conducted pursuant to Titles 23 and 49 U.S.C. Federal-aid systems revisions Engineering to assess social, economic, and environmental effects of the proposed action or alternatives to that action Noise attenuation Emergency or hardship advance land acquisitions (23 CFR 710.503) Acquisition of scenic easements Plantings, landscaping, etc. Sign removal Directional and informational signs Amended: Filed April 1, 2005, effective Dec. Transportation enhancement activities (except 30, 2005. rehabilitation and operation of historic *Original authority: 643.050, RSMo 1965, amended 1972, transportation buildings, structures, or transferred from 203.050 in 1986, 1992, 1993, 1995. facilities) Repair of damage caused by natural disasters, civil unrest, or terrorist acts, except projects involving substantial functional, locational, or capacity changes
1Note—In PM10 nonattainment or maintenance areas, such projects are exempt only if they are in compliance with control measures in the applicable implementation plan. (27) Projects Exempt From Regional Emissions Analyses. Notwithstanding the other requirements of this rule, highway and transit projects of the types listed in Table 3 of this section are exempt from regional emissions analysis requirements. These projects may then proceed to the project development process even in the absence of a conforming transportation plan and TIP. A particular action of the type listed in Table 3 of this section is not exempt from regional emissions analysis if the MPO in consultation with other agencies (see subparagraph (5)(C)1.C.), the EPA, and the FHWA (in the case of a highway project) or the FTA (in the case of a transit project) concur that it has potential regional impacts for any reason. Table 3 follows:
Table 3—Projects Exempt from Regional Emissions Analyses
Intersection channelization projects Intersection signalization projects at individual intersections Interchange reconfiguration projects Changes in vertical and horizontal alignment Truck size and weight inspection stations Bus terminals and transfer points
AUTHORITY: section 643.050, RSMo 2000.* Original rule filed Oct. 4, 1994, effective May 28, 1995. Amended: Filed May 1, 1996, effective Dec. 30, 1996. Amended: Filed June 15, 1998, effective Jan. 30, 1999. Amended: Filed Feb. 14, 2003, effective Sept. 30, 2003.