Minn. Stat. § 103E.021
Subd. 1. Spoil banks must be spread and permanent vegetation established.
In any proceeding to establish, construct, improve, or do any work affecting a public drainage system under any law that appoints viewers to assess benefits and damages, the authority having jurisdiction over the proceeding shall order spoil banks to be spread consistent with the plan and function of the drainage system. The authority shall order that permanent grass, other than a noxious weed, be planted on the ditch side slopes and that a permanent strip of perennial vegetation approved by the drainage authority be established on each side of the ditch. Preference should be given to planting native species of a local ecotype. The approved perennial vegetation shall not impede future maintenance of the ditch. The permanent strips of perennial vegetation shall be 16-1/2 feet in width measured outward from the top edge of the constructed channel resulting from the proceeding, or to the crown of the leveled spoil bank, whichever is the greater, except for an action by a drainage authority that results only in a redetermination of benefits and damages, for which the required width shall be 16-1/2 feet. Drainage system rights-of-way for the acreage and additional property required for the permanent strips must be acquired by the authority having jurisdiction.
Subd. 2. Reseeding and harvesting perennial vegetation.
The authority having jurisdiction over the repair and maintenance of the drainage system shall supervise all necessary reseeding. The permanent strips of perennial vegetation must be maintained in the same manner as other drainage system repairs. Harvest of the vegetation from the permanent strip in a manner not harmful to the vegetation or the drainage system is the privilege of the fee owner or assigns. The drainage inspector shall establish rules for the fee owner and assigns to harvest the vegetation.
Subd. 3. Agricultural practices prohibited.
Agricultural practices, other than those required for the maintenance of a permanent growth of perennial vegetation, are not permitted on any portion of the property acquired for perennial vegetation.
Subd. 4. Compliance work by drainage authority.
If a property owner does not bring an area into compliance with this section as provided in the compliance notice, the inspection committee or drainage inspector must notify the drainage authority. If a property owner does not bring an area into compliance after being notified under section 103E.705, subdivision 2, the drainage authority must issue an order to have the work performed to bring the property into compliance. After the work is completed, the drainage authority must send a statement of the expenses incurred to bring the property into compliance to the auditor of the county where the property is located and to the property owner.
Subd. 5. Collection of compliance expenses.
Subd. 6. Incremental implementation of vegetated ditch buffer strips and side inlet.
controls. (a) Notwithstanding other provisions of this chapter requiring appointment of viewers and redetermination of benefits and damages, a drainage authority may implement permanent buffer strips of perennial vegetation approved by the drainage authority or side inlet controls, or both, adjacent to a public drainage ditch, where necessary to control erosion and sedimentation, improve water quality, or maintain the efficiency of the drainage system. Preference should be given to planting native species of a local ecotype. The approved perennial vegetation shall not impede future maintenance of the ditch. The permanent strips of perennial vegetation shall be 16-1/2 feet in width measured outward from the top edge of the existing constructed channel. Drainage system rights-of-way for the acreage and additional property required for the permanent strips must be acquired by the authority having jurisdiction.