Minn. Stat. § 216B.243
Subd. 1. Assessment of need criteria.
The commission shall, pursuant to chapter 14 and sections 216C.05 to 216C.30 and this section, adopt assessment of need criteria to be used in the determination of need for large energy facilities pursuant to this section.
Subd. 2. Certificate required.
No large energy facility shall be sited or constructed in Minnesota without the issuance of a certificate of need by the commission pursuant to sections 216C.05 to 216C.30 and this section and consistent with the criteria for assessment of need.
Subd. 3. Showing required for construction.
No proposed large energy facility shall be certified for construction unless the applicant can show that demand for electricity cannot be met more cost effectively through energy conservation and load-management measures and unless the applicant has otherwise justified its need. In assessing need, the commission shall evaluate:
Subd. 3a. Use of renewable resource.
The commission may not issue a certificate of need under this section for a large energy facility that generates electric power by means of a nonrenewable energy source, or that transmits electric power generated by means of a nonrenewable energy source, unless the applicant for the certificate has demonstrated to the commission's satisfaction that it has explored the possibility of generating power by means of renewable energy sources and has demonstrated that the alternative selected is less expensive (including environmental costs) than power generated by a renewable energy source. For purposes of this subdivision, "renewable energy source" includes hydro, wind, solar, and geothermal energy and the use of trees or other vegetation as fuel.
Subd. 3b. Nuclear power plant; new construction prohibited.
The commission may not issue a certificate of need for the construction of a new nuclear-powered electric generating plant.
Subd. 4. Application for certificate; hearing.
Any person proposing to construct a large energy facility shall apply for a certificate of need prior to applying for a site or route permit under sections 116C.51 to 116C.69 or construction of the facility. The application shall be on forms and in a manner established by the commission. In reviewing each application the commission shall hold at least one public hearing pursuant to chapter 14. The public hearing shall be held at a location and hour reasonably calculated to be convenient for the public. An objective of the public hearing shall be to obtain public opinion on the necessity of granting a certificate of need. The commission shall designate a commission employee whose duty shall be to facilitate citizen participation in the hearing process. If the commission and the environmental quality board determine that a joint hearing on siting and need under this subdivision and section 116C.57, subdivision 2d, is feasible, more efficient, and may further the public interest, a joint hearing under those subdivisions may be held.
Subd. 5. Approval, denial, or modification.
Within six months of the submission of an application, the commission shall approve or deny a certificate of need for the facility. Approval or denial of the certificate shall be accompanied by a statement of the reasons for the decision. Issuance of the certificate may be made contingent upon modifications required by the commission.
Subd. 6. Application fees; rules.
Any application for a certificate of need shall be accompanied by the fee required pursuant to this subdivision. The maximum fee shall be $50,000, except for an application for an electric power generating plant as defined in section 216B.2421, subdivision 2, clause (1), or a high voltage transmission line as defined in section 216B.2421, subdivision 2, clause (2), for which the maximum fee shall be $100,000. The commission may require an additional fee to recover the costs of any rehearing. The fee for a rehearing shall not be greater than the actual cost of the rehearing or the maximum fee specified above, whichever is less. The commission shall establish by rule pursuant to chapter 14 and sections 216C.05 to 216C.30 and this section, a schedule of fees based on the output or capacity of the facility and the difficulty of assessment of need. Money collected in this manner shall be credited to the general fund of the state treasury.
Subd. 7. Participation by other agency or political subdivision.
Other state agencies authorized to issue permits for siting, construction or operation of large energy facilities, and those state agencies authorized to participate in matters before the commission involving utility rates and adequacy of utility services, shall present their position regarding need and participate in the public hearing process prior to the issuance or denial of a certificate of need. Issuance or denial of certificates of need shall be the sole and exclusive prerogative of the commission and these determinations and certificates shall be binding upon other state departments and agencies, regional, county, and local governments and special purpose government districts except as provided in sections 116C.01 to 116C.08 and 116D.04, subdivision 9.
Subd. 8. Exemptions.
This section does not apply to: