Minn. Stat. § 116C.57
Subd. 1. Designation of sites suitable for specific facilities; reports.
A utility must apply to the board in a form and manner prescribed by the board for designation of a specific site for a specific size and type of facility. The application shall contain at least two proposed sites. In the event a utility proposes a site not included in the board's inventory of study areas, the utility shall specify the reasons for the proposal and shall make an evaluation of the proposed site based upon the planning policies, criteria and standards specified in the inventory. Pursuant to sections 116C.57 to 116C.60, the board shall study and evaluate any site proposed by a utility and any other site the board deems necessary which was proposed in a manner consistent with rules adopted by the board concerning the form, content, and timeliness of proposals for alternate sites. No site designation shall be made in violation of the site selection standards established in section 116C.55. The board shall indicate the reasons for any refusal and indicate changes in size or type of facility necessary to allow site designation. Within a year after the board's acceptance of a utility's application, the board shall decide in accordance with the criteria specified in section 116C.55, subdivision 2, the responsibilities, procedures and considerations specified in section 116C.57, subdivision 4, and the considerations in chapter 116D which proposed site is to be designated. The board may extend for just cause the time limitation for its decision for a period not to exceed six months. When the board designates a site, it shall issue a certificate of site compatibility to the utility with any appropriate conditions. The board shall publish a notice of its decision in the State Register within 30 days of site designation. No large electric power generating plant shall be constructed except on a site designated by the board.
Subd. 2. Designation of routes; procedure.
A utility shall apply to the board in a form and manner prescribed by the board for a permit for the construction of a high voltage transmission line. The application shall contain at least two proposed routes. Pursuant to sections 116C.57 to 116C.60, the board shall study, and evaluate the type, design, routing, right-of-way preparation and facility construction of any route proposed in a utility's application and any other route the board deems necessary which was proposed in a manner consistent with rules adopted by the board concerning the form, content, and timeliness of proposals for alternate routes provided, however, that the board shall identify the alternative routes prior to the commencement of public hearings thereon pursuant to section 116C.58. Within one year after the board's acceptance of a utility's application, the board shall decide in accordance with the criteria and standards specified in section 116C.55, subdivision 2, and the considerations specified in section 116C.57, subdivision 4, which proposed route is to be designated. The board may extend for just cause the time limitation for its decision for a period not to exceed 90 days. When the board designates a route, it shall issue a permit for the construction of a high voltage transmission line specifying the type, design, routing, right-of-way preparation and facility construction it deems necessary and with any other appropriate conditions. The board may order the construction of high voltage transmission line facilities which are capable of expansion in transmission capacity through multiple circuiting or design modifications. The board shall publish a notice of its decision in the state register within 30 days of issuance of the permit. No high voltage transmission line shall be constructed except on a route designated by the board, unless it was exempted pursuant to subdivision 5.
Subd. 3. Emergency certification.
Any utility whose electric power system requires the immediate construction of a large electric power generating plant or high voltage transmission line may make application to the board for an emergency certificate of site compatibility or permit for the construction of high voltage transmission lines, which certificate or permit shall be issued in a timely manner no later than 195 days after the board's acceptance of the application and upon a finding by the board that a demonstrable emergency exists which requires immediate construction, and that adherence to the procedures and time schedules specified in this section would jeopardize the utility's electric power system or would jeopardize the utility's ability to meet the electric needs of its customers in an orderly and timely manner. A public hearing to determine if an emergency exists shall be held within 90 days of the application. The board shall, after notice and hearing, promulgate rules specifying the criteria for emergency certification.
Subd. 4. Considerations in designating sites and routes.
To facilitate the study, research, evaluation and designation of sites and routes, the board shall be guided by, but not limited to, the following responsibilities, procedures, and considerations:
Subd. 5. Exemption of certain routes.
A utility may apply to the board in a form and manner prescribed by the board to exempt the construction of any proposed high voltage transmission line from sections 116C.51 to 116C.69. Within 15 days of the board's receipt of the exemption application, the utility shall publish a notice and description of the exemption application in a legal newspaper of general circulation in each county in which the route is proposed and send a copy of the exemption application by certified mail to the chief executive of any regional development commission, county, incorporated municipality and organized town in which the route is proposed and shall send a notice and description of the exemption application to each owner over whose property the line may run, together with an understandable description of the procedures the owner must follow should that owner desire to object. For the purpose of giving mailed notice under this subdivision, owners shall be those shown on the records of the county auditor or, in any county where tax statements are mailed by the county treasurer, on the records of the county treasurer; but other appropriate records may be used for this purpose. Except as to the owners of tax exempt property or property taxes on a gross earnings basis, every property owner whose name does not appear on the records of the county auditor or the county treasurer shall be deemed to have waived such mailed notice unless that owner has requested in writing that the county auditor or county treasurer, as the case may be, include the owner's name on the records for such purpose. The failure to give mailed notice to a property owner, or defects in the notice shall not invalidate the proceedings, provided a bona fide attempt to comply with this subdivision has been made. If any person who owns real property crossed by the proposed route, or any person owning property adjacent to property crossed by the proposed route, or any affected political subdivision files an objection with the board within 60 days after the board's receipt of the exemption application, the board shall either deny the exemption application or conduct a public hearing. If the board determines that the proposed high voltage transmission line will not create significant human or environmental impact, it may exempt the proposed transmission line with any appropriate conditions, but the utility shall comply with any applicable state rule and any applicable zoning, building and land use rules, regulations and ordinances of any regional, county, local and special purpose government in which the route is proposed. The board may by rule require a fee to pay expenses incurred in processing exemptions. Any fee charged is subject to the conditions of section 116C.69, subdivision 2a.
Subd. 5a. Exemption of certain sites.
(a) A utility or person may apply to the board in a form and manner prescribed by the board to exempt from the requirements of sections 116C.51 to 116C.69 the construction at a proposed site:
(b) Within 15 days of the board's receipt of an exemption application, the utility or person shall:
Subd. 6. Recording of survey points.
The permanent location of monuments or markers found or placed by a utility in a survey of right-of-way for a route shall be placed on record in the office of the county recorder or registrar of titles. No fee shall be charged to the utility for recording this information.